PRESENTED BY: Ilana Weiss LA ISLA NETWORK Where heavy labor, high - - PowerPoint PPT Presentation

presented by ilana weiss la isla network where heavy
SMART_READER_LITE
LIVE PREVIEW

PRESENTED BY: Ilana Weiss LA ISLA NETWORK Where heavy labor, high - - PowerPoint PPT Presentation

PRESENTED BY: Ilana Weiss LA ISLA NETWORK Where heavy labor, high environmental temperature and inadequate worker protections likely exist Exertional heat stroke (potentially fatal) Lower productivity Increased accidents Kidney


slide-1
SLIDE 1

PRESENTED BY: Ilana Weiss LA ISLA NETWORK

slide-2
SLIDE 2

Where heavy labor, high environmental temperature and inadequate worker protections likely exist

slide-3
SLIDE 3
  • Exertional heat stroke (potentially fatal)
  • Lower productivity
  • Increased accidents
  • Kidney injury Kidney disease

in sugar cane context and elsewhere: sports medicine, military and other industrial sectors

slide-4
SLIDE 4

Recent publications in leading scientific journals

slide-5
SLIDE 5

Heat Stress

process to the limit Environmental heat

+

Internal heat produced from physical work

  • Greater physical strain
  • Hotter internal body

temperature Greater health risk Increased accident risk Reduced productivi ty

slide-6
SLIDE 6

External Factors

Relative humidity Clothing Temperature & speed of air Heavy workload & piece rate

slide-7
SLIDE 7

Internal Factors

Metabolic load Sex Fever

Health condition

Dehydration

slide-8
SLIDE 8
slide-9
SLIDE 9

20 40 60 80 100

Time of day

Heart rate (% HRmax)

6AM 7AM 8AM 9AM 10AM 11AM 12PM 1PM Figure: Average heart rate across one workday for 20 sugarcane workers.

slide-10
SLIDE 10

20 40 60 80 100

Time of day

Heart rate (% HRmax)

6 A M 7 A M 8 A M 9 A M 1 A M 1 1 A M 1 2 P M 1 P M

Figure: Average heart rate across one workday for 20 sugarcane workers.

slide-11
SLIDE 11

Water | Rest | Shade

BREAKS Scheduled SHADE TENTS Moveable HYDRATION Clean water and hydrating beverage

slide-12
SLIDE 12

Recommended Rests

Sugarcane cutters Seed cutters Other field work

slide-13
SLIDE 13

Rest Schedule

slide-14
SLIDE 14

30 min rest 15 min rest 45 min rest

slide-15
SLIDE 15

Shade Tents

slide-16
SLIDE 16

Hydration

slide-17
SLIDE 17

Well-Implemented interventions

slide-18
SLIDE 18

Thank you