Presented By: Chazen Engineering, Land Surveying, and Landscape Architecture Co., DPC & Zarecki & Associates May 24, 2016 Proud to be Employee Owned 6. Proposed Area Northwest of Rt 22 5. Proposed Area North of Rt 55, & Along


slide-1
SLIDE 1

Presented By:

Chazen Engineering, Land Surveying, and Landscape Architecture Co., DPC & Zarecki & Associates

May 24, 2016

Proud to be Employee Owned

slide-2
SLIDE 2

DEP Water Shed Boundary Castagna Property

  • 2. Existing

Service Area- Village PJS District #1

  • 4. Proposed Area

South of Rt 55 & Along Rt 22

  • 6. Proposed Area

Northwest of Rt 22

  • 5. Proposed Area

North of Rt 55, & Along Rt 22

  • 3. JUCCA

Wetlands- Not in District

  • 1. Existing

Service Area - Town PJS District #2

  • 1. Existing Service

Area- Town PJS District #2

  • 7. Proposed

Service Area- District to Village

slide-3
SLIDE 3

Toilet Pump Station Swamp River Collection System Pawling Wastewater Treatment Plant Long Island Sound

slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6

Financial Impact of Financial Impact of Proposed Proposed Project Project

  • Engineer’s Opinion of Probable Cost
  • $6,500,000
  • 10-20% increase in budget
  • Bids Received on May 6
  • $13,000,000+
  • 20-35% increase in budget
slide-7
SLIDE 7

Potential Cost of Control Potential Cost of Control Measures Measures

  • EFC Grant Potential
  • $5,000,000
  • EFC Hardship 0% Interest Loan
  • Additional Value Engineering
  • Goal: Reduce local share to original

projection of 10-20% increase in budget