Puget Sou Puget Sound nd Ga Gatew tew ay ay Pr Prog ogram am - - PowerPoint PPT Presentation

puget sou puget sound nd ga gatew tew ay ay pr prog ogram
SMART_READER_LITE
LIVE PREVIEW

Puget Sou Puget Sound nd Ga Gatew tew ay ay Pr Prog ogram am - - PowerPoint PPT Presentation

Puget Sou Puget Sound nd Ga Gatew tew ay ay Pr Prog ogram am SR 167 SR 167 an and d SR 509 SR 509 Complet Completion ion Pr Projects ojects Ex Executiv ecutive e Committee Committee Meeting Meeting April 5, pril 5, 2018


slide-1
SLIDE 1

Puget Sou Puget Sound nd Ga Gatew tew ay ay Pr Prog

  • gram

am

SR 167 SR 167 an and d SR 509 SR 509 Complet Completion ion Pr Projects

  • jects

Ex Executiv ecutive e Committee Committee Meeting Meeting April 5, pril 5, 2018 2018

CRAIG J. STONE, PE GATEWAY PROGRAM ADMINISTRATOR STEVE FUCHS, PE SR 167 PROJECT MANAGER OMAR JEPPERSON, PE SR 509 PROJECT MANAGER ED BARRY, PE TOLL DIVISION DIRECTOR

slide-2
SLIDE 2
  • Welcome and introductions
  • Legislative updates
  • Funding status
  • Cost estimate review
  • Endorse Updated Preferred Scenario
  • Project updates
  • Next Steps

2

Agenda Agenda

slide-3
SLIDE 3

3

Pug Puget et Sou Sound nd Ga Gatew tew ay y Pr Prog

  • gram

am Guiding Guiding Principles Principles

1. Support regional mobility to provide efficient movement of freight and people 2. Improve local, regional, state and national economic vitality 3. Provide a high level of safety 4. Support local and regional comprehensive land use plans 5. Minimize environmental impacts and seek opportunities for meaningful improvements 6. Create solutions that are equitable, fiscally responsible, and allow for implementation over time 7. Support thoughtful community engagement and transparency

slide-4
SLIDE 4

Le Legisla gislativ tive e Dir Direct ection ion - 2015 2015

In making budget allocations to the Puget Sound Gateway project, the department shall implement the project's construction as a single corridor investment. The department shall develop a coordinated corridor Construction and Implementation Plan for SR 167 and SR 509 in collaboration with affected stakeholders. Specific funding allocations must be based on where and when specific project segments are ready for construction to move forward and investments can be best

  • ptimized for timely project completion. Emphasis must be placed on avoiding

gaps in fund expenditures for either project.

4

slide-5
SLIDE 5

Le Legisla gislativ tive e Dir Direct ection ion – 201 2017 7 Upda Update te

The secretary of transportation must develop a memorandum of understanding with local project stakeholders that identifies a schedule for stakeholders to provide local matching funds for the Puget Sound Gateway project. Criteria for eligibility of local match includes matching funds and equivalent in-kind contributions including, but not limited to, land donations. The memorandum of understanding must be finalized by July 1, 2018. The department must submit a copy of the memorandum of understanding to the transportation committees of the legislature and report regularly on the status. During the course of developing the memorandum of understanding, the department must evaluate the project schedules to determine if there are any benefits to be gained by moving the project schedule forward. Additionally, the department must consider completing a full single-point urban interchange at the junction of state route number 161 (Meridian avenue) and state route number 167 and a full single-point urban interchange at the junction of state route number 509 and 188th Street. If the department receives additional funds from an

  • utside source for this project, the funds must be applied toward the completion of these

two full single-point urban interchanges. Any savings on the project must stay on the Puget Sound gateway corridor until the project is complete.

5

slide-6
SLIDE 6

6

Legislative Direction – 2018 Update

(c) During the course of developing the memorandum of understanding, the department must evaluate the project schedules to determine if there are any benefits to be gained by moving the project schedule forward. It is the legislature's intent that if the department identifies any savings after the funding gap on the base project is closed as part of the proposal to expedite the project, that these cost savings shall go toward construction of a full single-point urban interchange at the junction of state route number 161 (Meridian avenue) and state route number 167 and a full single point urban interchange at the junction of state route number 509 and 188th Street. If the department receives additional funds from an outside source for this project after the funding gap on the base project is closed, the funds must be applied toward the completion of these two full single-point urban interchanges. (b) Proceeds from the sale of any surplus real property acquired for the purpose of building the SR 167/SR 509 Puget Sound Gateway (M00600R) project must be deposited into the motor vehicle account for the purpose of constructing the project.

slide-7
SLIDE 7

7

Legislative Direction – 2018 Update

(d) For the SR 167/SR 509 Puget Sound Gateway project (M00600R) the department is strongly encouraged to work to relocate any significant businesses currently located within the planned path of the state route number 509/Interstate 5 under-crossing to a location within the Kent city limits. The department shall provide regular updates on its progress to the joint transportation committee and affected stakeholders. (e) In designing the state route number 509/state route number 516 interchange component of the SR 167/SR 509 Puget Sound Gateway project (M00600R), the department shall make every effort to utilize the preferred "4B" design.

  • $1,200,000 of the multimodal transportation account—state appropriation is

provided solely to relocate and rebuild a 2,100-foot section of the Interurban trail and trailhead in Fife.

  • $200,000 awarded to Interurban Trail from the state Capital Budget.
slide-8
SLIDE 8

8

Ga Gatew tew ay F ay Funding unding S Spher pheres es

Total $1,986 M

  • MOU
  • Construction &

Implementation Plan

  • Schedule Acceleration

Report

  • Traffic & Revenue

Forecast

slide-9
SLIDE 9

Pug Puget et Sou Sound nd Ga Gatew tew ay y Fu Fund nding ing

as enact as enacted ed by the 2017 by the 2017 Le Legisla gislatur ture

9

$20m

slide-10
SLIDE 10
  • Applied on November

2ND for $111 million

  • If fully awarded, up to

$20 M could be applied to the local funding

  • No announcement on

award timing so far

  • Application available on

the program website:

www.wsdot.wa.gov/projects/gateway

10

INFRA Gr INFRA Grant ant Sta Status tus

slide-11
SLIDE 11

Fund Funding ing and and Phasing Phasing Subc Subcommittee

  • mmittee Upda

Update te

11

slide-12
SLIDE 12

Projects SR 167 SR 509 TOTAL

Port contributions $30 million $30 million $60 million Federal INFRA grant $10 million $10 million $20 million Local partner match $10 million $10 million $20 million Other Grants (PSRC, FMSIB, TIB) $20 million $10 million $30 million

Potential Total $70 million $60 million $130 million

12

Loc Local al Cont Contribu ribution tion Con Const struc uct

slide-13
SLIDE 13

Bene Benefit fit Le Level an el and d Par artner tner Roles

  • les

Benefit Level Proposed Partner Roles

Tier 1 (Ports and Cities)

  • Contribute to local projects
  • Donate right-of-way (if applicable)
  • Sponsor, initiate and help write grants
  • Support project and grant requests
  • Participate in project development review

& project meetings Tier 2 (Cities and Counties)

  • Contribute to match to local projects
  • Support project and grant requests
  • Participate in project development review &

project meetings Tier 3 (Cities)

  • Support project and grant requests
  • Participate in project meetings

13

slide-14
SLIDE 14

14

Gr Grant ant and and Ma Matc tch Finan Financial cial Plan: Plan:

slide-15
SLIDE 15

15

MOU Feedback to Date

  • Clarifications requested on:

– Timing of local contributions – Who signs the interlocal agreements – What happens if funding is not obtained – Language related to conditions for termination

  • Request that State obligations be more explicitly detailed
  • Terminology consistency and specificity

Comments received from:  Auburn  Des Moines  Federal Way  Kent  King County  Tacoma Thank you!

slide-16
SLIDE 16

16

MOU De MOU Developme elopment Pr t Proce cess ss

Concur on goals, partnership principles and responsibilities

  • October 4, 2017

Approach to Benefit Framework and Partner Roles

  • December 13, 2017

Partner Concurrence on MOU

  • January-March

2018

Ratify MOU

  • April – June 2018
slide-17
SLIDE 17

Tolling

  • lling

17

slide-18
SLIDE 18

18

Tolling in W

  • lling in Washing

ashington ton Sta State te

Current toll facilities

  • SR 16 Tacoma Narrows Bridge
  • SR 167 HOT Lanes Pilot Project
  • SR 520 Floating Bridge
  • I-405 Express Toll Lanes

(Bellevue to Lynnwood) Authorized toll facilities

  • SR 99 Tunnel

Future toll facilities

  • Puget Sound Gateway Program

– SR 509 and SR 167

  • I-405 Express Toll Lanes

(Renton to Bellevue)

slide-19
SLIDE 19

Tolling r

  • lling respo

esponsibilities nsibilities in W in Washing ashington ton Sta State te

19

slide-20
SLIDE 20

Tolling R

  • lling Repo

eports ts

20

slide-21
SLIDE 21

Tolling Pr

  • lling Proce
  • cess

ss

  • Legislature directed $180 million from tolls for

SR 509 and SR 167

  • Toll rates have not been determined
  • Traffic and Revenue study under way by

Stantec

  • Scenario Tests (January-May 2018)
  • General revenue, toll rate, and usage

information for each scenario

  • Level 2 Traffic and Revenue (June-

September 2018)

  • Refined analysis of revenue, toll rates

and usage

  • Agency request for toll authorization planned in

2019

  • The Washington State Transportation

Commission will set toll rates closer to toll commencement

21

slide-22
SLIDE 22

22

Ga Gatew tew ay y Toll

  • ll Points
  • ints

SR 509 SR 167

slide-23
SLIDE 23

23

Toll

  • ll Fun

Funding ding Scen Scenario ario Test Co est Conditions nditions

Scenario SR 509 SR 167 Port of Tacoma Spur

1 Base Condition All tolled, axle multiplier All tolled, axle multiplier All tolled, axle multiplier 2 Commercial Trucks* Equal All tolled, No commercial truck axle multiplier All tolled, No commercial truck axle multiplier All tolled, No commercial truck axle multiplier 3 Port of Tacoma Spur: Commercial Trucks Free All tolled, axle multiplier All tolled, axle multiplier Commercial trucks free, all others tolled 4 Commercial Trucks Free Commercial trucks free Commercial trucks free Commercial trucks free 5 Port of Tacoma Spur: Free All tolled, axle multiplier All tolled, axle multiplier All Free 6 HOV and Transit Free All tolled, axle multiplier, HOV 2+/transit Free All tolled, axle multiplier, HOV 2+/transit Free All tolled, axle multiplier, HOV 2+/transit Free 7 Non-Tolled: Managed By Vehicle Class Commercial trucks & HOV2+/transit allowed, all others prohibited Commercial trucks & HOV2+/transit allowed, all others prohibited Commercial trucks & HOV2+/transit allowed, all others prohibited 8 Non-Tolled All vehicles free All vehicles free All vehicles free

Tolled Un-Tolled

*for the purposes of preliminary analysis, commercial trucks are any trucks with over 2 axles

slide-24
SLIDE 24

Cost Estima Cost Estimate te Valida alidation Pr tion Proces

  • cess

s (CEVP) (CEVP) Results esults

24

slide-25
SLIDE 25

25

Pr Prac actica tical l Des Design ign Scen Scenario ario Refinemen efinement t Pr Proce

  • cess

ss

Schedule

1 2 3 4 5 2A 3A 4A 2A 2B 4A 1 2 3 4 5 3A 2C 2D 3B 3A 2B 2E 2C

slide-26
SLIDE 26

26

Pr Prog

  • gram

am Cost Cost R Results esults: 2C/3A 2C/3A Cons Constr trained ined

Using WSDO Using WSDOT CCI T CCI

slide-27
SLIDE 27

27

Pr Prog

  • gram

am Cost Cost R Results esults: 2E/3B 2E/3B Cons Constr trained ined

Using WSDO Using WSDOT CCI T CCI

0% 1% 2% 3% 4% 5% 6% 7% 8% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 1,400 1,600 1,800 2,000 2,200 2,400

Probability (for Individual Ranges) Percentile (Cumulative Probability) Program Cost (Escalated $M) 50%: $1.889 B 70%: $1.986 B

slide-28
SLIDE 28

28

Cost Cost Estima Estimate te Accu Accurac acy y Ov Over Time er Time

Conceptual Engineering Preliminary Engineering Final Design Construction

Project Stage Accuracy Range (%)

  • 50
  • 40

100

  • 30
  • 20
  • 10

10 20 30 40 50 60 70 80 90

slide-29
SLIDE 29

29

Cons Constr truct ction ion Cost Cost Inde Index x Annu Annual al Chan Change ge

  • 4%
  • 2%

0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 20% 22% 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Construction Cost Index Annual Change WSDOT CCI Historical Data

slide-30
SLIDE 30

30

Cons Constr truct ction ion Cost Cost Inde Index

100 150 200 250 300 350 400 450 500 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Construction Cost Index (1987 = 100) WSDOT CCI Historical Data WSDOT CCI Forecast WSP CCI Forecast for Puget Sound Region

slide-31
SLIDE 31

31

Pr Prog

  • gram

am Cost Cost R Results esults:2E/3B :2E/3B Const Constrained ined

Using WSP Using WSP CCI CCI w ith Local Mar w ith Local Market et Conditions Conditions

0% 2% 4% 6% 8% 10% 12% 14% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 1,400 1,600 1,800 2,000 2,200 2,400 2,600 2,800

Probability (for Individual Ranges) Percentile (Cumulative Probability) Program Cost (Escalated $M) 50%: $2.067 B

slide-32
SLIDE 32

Upda Updated ted Pr Pref efer erred ed Scen Scenario ario

32

Cons Constr truction uction & & Implemen Implementa tation tion Plan Plan

slide-33
SLIDE 33

33

Gateway Cost Estimates

$3,830 $1,750 $1,915 $1,989 $1,889 $1,933 $776 $816 $780 $1,897 $586 $712 $754 $40 $92 $67 $74 $296 $394 $241 $0 $250 $500 $750 $1,000 $1,250 $1,500 $1,750 $2,000 $2,250 $2,500 $2,750 $3,000 $3,250 $3,500 $3,750 $4,000

Full EIS Design 2013 CEVP Gateway Concept 2015 Project List Provided to Legislature 2016 CEVP Update (2C & 3A Scope) 2017 CEVP Update (2E & 3B Scope) Millions

Mkt Conds. Inflation Risk Added Scope SR 509 SR 167

$1,548 to $1,915 $2 $2,067 ,067

slide-34
SLIDE 34

34

Initial Gateway Report – 2013 2013

62nd Ave. E 26thSt.E 70th Ave. E Freeman Milwaukee Ave. E 54th Ave. E 5 20thSt.E 509 99 512 167 5

TACOMA MILTON EDGEWOOD PUYALLUP

161

SR 167 Phase 1

5 28th Ave. S. Sea-Tac Airport S.188th St. S.188th St. Built byOthers

DES MOINES SEATAC KENT BURIEN

516 99 99 516 24th Ave. S.
  • S. 320thSt.
  • S. 317thSt.
  • S. 272thSt.
S.231st Way Military Road S.
  • S. 200thSt.

FEDERAL WAY

Future Sound Transit
  • S. 200th St.
station (by others) 5 509

SR 509 Phase 1

Completing the Gateway Vision: A phased approach to corridor completion

In alignment with regional planning, SR 167 and SR 509 will be fully tolled corridors. Traffic analyses show that tolling the new SR 167 and SR 509 corridors will help relieve congestion by encouraging drivers to use the freeway during non-peak hours, take other routes, or make

  • ther travel choices. WSDOT proposes to build 1-2 additional lanes in

each direction of SR 167 and SR 509 in Phase 1 to accommodate traffic volumes and freight movement. Additional lanes can be added

  • ver time to accommodate regional growth.

SR 509 Phase 1 (Cost: $708 million to $784 million)

  • One lane in each direction between S. 188th St. and I-5
  • Second lane in each direction between S. 200th St. and I-5
  • Truck climbing lanes as needed where steep grades exist
  • New or improved interchanges at S. 188th St., 28th/24th Avenues

S., I-5, S. 231st St., SR 516 I-5 Express Toll Lanes (Cost: $131 million to $145 million)

  • Existing HOV lane to express toll lane from SR 16 to I-90

SR 167 Phase 1 (Cost: $770 million to $852 million)

  • One lane in each direction between SR 161 and SR 509
  • Second lane in each direction between Valley Avenue and 54th

AvenueEast

  • New or improved interchanges at I-5, 54th Ave E., Valley Ave,

Freeman Rd., SR 161 If funding is received in 2014, WSDOT can utilize an integrated development and delivery approach to accelerate design and begin construction by 2017 and open to traffic by 2021. WSDOT intends to use the design-build delivery method to complete the project within the accelerated schedule. Future phases of the Gateway would build upon the initial investments in Phase 1, ultimately expanding SR 167 and SR 509 to two lanes in each direction while completing all planned connections. Timing of future phases is based

  • n the needs of corridor users and the capacity needed

to support regionalgrowth. Gateway Funding Phase1 Potential toll funding $330 million Total Cost of Phase1 $1.6 billion - $1.8billion*

*Cost estimates, presented in year of expenditure dollars, include risk.

FIFE

Future expansion of the Gateway project is estimated to be an additional $1.2 billion to $1.3 billion, bringing the total cost to complete all phases of the Gateway vision to $2.8 billion to $3.1billion.

L e g e n d Express TollLane 1 New GPLane 2 New GPLanes Diamond Interchange Half-Diamond Interchange SinglePoint Urban Interchange Half single Point Urban Interchange Tollpoint

<> <

slide-35
SLIDE 35

Local Access

  • Meridian Interchange (west half)
  • 188th Interchange (south half)
  • 200th Interchange
  • Valley Interchange (east half)

I-5

  • SR 167 – SR 18 NB auxiliary lane
  • 272nd – SR 516 NB auxiliary lane
  • SR 516 – SR 509 NB collector/distributor lanes

HOV

  • SR 509 HOV (fifth and sixth lanes)
  • SR 509 HOV Direct Access Ramps
  • SR 167 HOV (fifth and sixth lanes)
  • SR 167 HOV Direct Access Ramps

Forward Compatibility (features that could be constructed in Phase 1 that are needed in Phase 2)

  • SR 509
  • Sea-Tac Airport South Access Expressway
  • I-5
  • SR 167

Ga Gatew tew ay y Phas Phasing ing - 2017 2017

35

SR 509: 3A SR 167: 2C

PHASE 1 (to 2031) PHASE 2 (future)

slide-36
SLIDE 36

36

Pr Prac actica tical l Des Design ign – 20 2018 18 Upd Update te Scen Scenario ario Refinemen efinement t Pr Proce

  • cess

ss

Schedule

1 2 3 4 5 2A 3A 4A 2A 2B 4A 1 2 3 4 5 3A 2C 2D 3B 3B 2B 2E 2E

slide-37
SLIDE 37

37

Cons Constr truct ction ion and and Implemen Implementa tation tion Plan Plan

Develop outline and major topic areas

  • Feb – March 2018

Define updated preferred scenario

  • March 28 & April 5,

2018

Identify delivery packages, expenditure and sequencing plans

  • April - June 2018

Submit Construction & Implementation Plan

  • July 2018
slide-38
SLIDE 38

Sc Schedu hedule A le Acceler cceleration tion

38

slide-39
SLIDE 39

39

Pr Prog

  • gram

am Cost Cost Comp Comparison arison: 2 : 2E/3B E/3B

Constr Constrained ained vs.

  • vs. Unconstr

Unconstrained ained

slide-40
SLIDE 40

40

Sc Sched hedule ule Acce Acceler leration tion Anal Analysis ysis

Determine cost inputs, CEVP and CCI

  • Nov 2017 – Apr 2018

Travel demand and toll funding analysis

  • Dec 2017 – May

2018

Determine funding and phasing

  • pportunities and

constraints

  • March - June 2018

Issue report identifying acceleration benefits

  • July 2018
slide-41
SLIDE 41

SR 50 SR 509 U 9 Upd pdate te

41

slide-42
SLIDE 42

42

SR 509 SR 509: Upda : Updated ted Pr Pref efer erred ed Scen Scenario ario 3B 3B

SR 509 Completed local projects Planned local projects Sound Transit Federal Way Link Extension

slide-43
SLIDE 43

Scenario 3B: Full Diamond at 188th

43

SR 509 SR 509 18 188th 8th Inter Interchan ange ge – Full Diamon Full Diamond

slide-44
SLIDE 44

44

SR 509 SR 509 18 188th 8th Inter Interchan ange ge – Folded

  • lded Diamond

Diamond

slide-45
SLIDE 45

45

SR 509 SR 509 Con Constr struction tion Sta Stages ges

slide-46
SLIDE 46

46

Ear Early W y Wor

  • rk:

k: City of City of Sea SeaTac ac 28 28 th

th/24

/24 th

th

slide-47
SLIDE 47

Voluntary comment period. Public comments on the NEPA Re-Evaluation were collected via the online open house through February 22, 2018.

SR 509 SR 509 NEP NEPA R A Re-Evalua Evaluation tion

WSDOT and FHWA completed the NEPA Re-Evaluation and found no new significant effects comparing the 2003 FEIS/ROD to the 2018 Phase 1 improvements.

Key Findings

  • Effects of tolling. Considered the effect that tolling would have on low-income

and minority populations and found that I-5 and surrounding arterials would remain accessible alternatives to the new tolled facility.

  • Improved travel times. The new SR 509 is expected to offer improved travel

times, compared to if the Phase 1 Improvements were not built.

  • Smaller project footprint. Phase 1 Improvements are 78-feet wide as

compared to 120-feet wide in the 2003 Selected Alternative, resulting in fewer impacts on vegetation, wildlife, fish, parks and recreational resources.

  • Fewer property acquisitions. Phase 1 Improvements identify 88 parcels for

acquisition in comparison to 133 parcels identified in the 2003 Final EIS.

47

slide-48
SLIDE 48
  • Open from January 22 –

February 22

  • 3,663 unique users
  • 43,929 total page views

Online Open Online Open Hou House se

  • 19 Comments
  • Common themes:
  • Tolling
  • South 188th Avenue

Interchange improvements

  • Sea-Tac Airport traffic

48

slide-49
SLIDE 49

SR 509 SR 509 Right Right of

  • f W

Way 201 ay 2018

49

slide-50
SLIDE 50

Fede ederal W l Way Link ay Link Exte Extension nsion Pr Project

  • ject

50

slide-51
SLIDE 51

51

I-5 R 5 Reta etaining ining Walls alls

slide-52
SLIDE 52

52

SR 99 SR 99 Bypa Bypass ss

slide-53
SLIDE 53
  • Continue right of way acquisition
  • Include SR 99 bridge scope in Sound Transit Summer 2018 RFP
  • Complete land exchange agreement with Sound Transit by June 2018
  • Complete construction agreement with Sound Transit by July 2018
  • Continue coordination with King County regarding Lake to Sound Trail

design

  • Participate in summer outreach activities
  • Design parameters
  • Develop Phase 1 30% design by Fall 2018
  • IJR update
  • Develop Phase 2 10% design by Fall 2018

53

SR 509 SR 509 Ne Next S xt Steps teps

slide-54
SLIDE 54

SR 16 SR 167 U 7 Upd pdate te

54

slide-55
SLIDE 55

SR 167 SR 167: Upda : Updated ted Pr Pref efer erred ed Scen Scenario ario 2E 2E

55

slide-56
SLIDE 56

SR 167 SR 167 Con Constr struction tion Sta Stages ges

56

slide-57
SLIDE 57

57

SR 167 Right SR 167 Right of

  • f W

Way 2018 ay 2018

slide-58
SLIDE 58

58

SR 167 Inter SR 167 Interur urba ban n Trail R ail Refinement efinement

Hyl Hylebos ebos Cr Creek Realignment eek Realignment Surpri Surprise se Lake T Lake Tribut ributary ary Realignment Realignment Google E Google Eart arth

slide-59
SLIDE 59
  • Continue right of way acquisition process
  • Complete NEPA Re-Evaluation
  • Participate in summer outreach activities
  • Continue coordination with Fife regarding the Interurban Trail

design and construction

  • Increase coordination with Sound Transit regarding Tacoma

Dome Link Extension

  • Develop 30% design and design approval late 2018
  • Beginning Urban Design Criteria process at each interchange

location

  • Accepting clean fill dirt

59

SR 167 SR 167 Ne Next S xt Steps teps

slide-60
SLIDE 60

Ga Gatew tew ay y Pr Prog

  • gram

am Ne Next S xt Steps teps

  • Submit grant applications for local nexus projects

– FMSIB – PSRC

  • Complete:

– Local Funding MOU – Construction and Implementation Plan – Schedule Acceleration Report – Tolling traffic and revenue

  • Upcoming Meetings:

– Funding & Phasing Subcommittee – May 3 at Fabulich Center – Funding & Phasing Subcommittee – June 7 at SeaTac City Hall – Steering Committee – June 27 at Fabulich Center – Executive Committee – July 11 at Fabulich Center

60

slide-61
SLIDE 61

61

More information:

Craig J. Stone, PE Puget Sound Gateway Program Administrator (206) 464-1222 StoneC@wsdot.wa.gov Omar Jepperson, PE SR 509 Project Manager (206) 464-1286 JepperO@wsdot.wa.gov Steve Fuchs, PE SR 167 Project Manager (360) 357-2623 FuchsS@wsdot.wa.gov Ed Barry, PE Toll Division Director (206) 464-1217 Barryed@wsdot.wa.gov