Rebuild Iraq Water Program Ted Clark, P.E. The Program Under - PowerPoint PPT Presentation
Rebuild Iraq Water Program Ted Clark, P.E. The Program Under jurisdiction of the Coalition Provisional Authority Managed by US Army Corps of Engineers Limited to Coalition Partners 6 Program Sectors $18 Billion
Rebuild Iraq Water Program Ted Clark, P.E.
The Program • Under jurisdiction of the Coalition Provisional Authority • Managed by US Army Corps of Engineers • Limited to Coalition Partners • 6 Program Sectors • $18 Billion Appropriation • Design/Build Contracts
Program Sectors • Public Works Water • Electricity • Oil • Transportation • Buildings • Security/Justice Safety
Our Team • Fluor/AMEC LLC • Earth Tech (major subcontractor) • 18 Minor Subcontractors
Middle East
Water Program (to date) • Water Treatment Plant (7) • Wastewater Treatment Plant (1) • Landfills (2) • Utility Systems (5)
Landfill WTP WWTP
Water Treatment Plants • Major Water Plants – Erbil – 6,000 CM/HR (38.5 MGD) – Nasiriyah – 10,000 CM/HR (63 MGD) – Balad Rooz – 1,000 CM/HR (6.3 MGD) – Dokan - 6,000 CM/HR (38.5 MGD) – Diwaniah – 4,000 CM/HR (25 MGD) – Najaf – 2,000 CM/HR (12.7 MGD) • Large Transmission Pipelines
Design Considerations • Raw Water Quality • Conventional Treatment Processes • Low Automation • WHO Water Quality Standards
Unique Iraq Challenges • Limited Raw Water Quality Data
Diwaniah Water Quality Data � C Date Source ntu PH F.C Cl Alkalinity Acidity Hardness Ca Mg T.D.S T.S.S 1/2/04 Potable 1.5 12 7.13 1124 113 106 none 433 72 61.7 1041 91 Raw 30 12 7.34 1127 119 117 none 451 79 61.9 1066 89 1/2/04 Potable 2.5 13 7.5 1182 146 151 none 472 85 63.3 1130 92 Raw 30 13 7.82 1185 151 158 none 497 90 66.4 1270 95 2/1/05 Potable 2 15 7.49 1265 122 119 none 462 80 63.9 1035 94 Raw 19 15 7.74 1266 131 127 none 483 88 64.2 1057 92 2/1/05 Potable 0.9 14 7.41 1243 161 132 none 480 94 60 1112 122 Raw 20 14 7.89 1249 173 140 none 497 97 62.1 1143 156
Unique Iraq Challenges • Limited Raw Water Quality • Limited Survey and Geotechnical Data
Unique Iraq Challenges • Limited Raw Water Quality • Limited Survey and Geotechnical Data • Available Low Cost Work Force
Iraqis show up for work
Unique Iraq Challenges • Limited Raw Water Quality • Limited Survey and Geotechnical Data • Available Low Cost Work Force • Freight/Travel
Unique Iraq Challenges • Limited Raw Water Quality • Limited Survey and Geotechnical Data • Available Low Cost Work Force • Freight/Travel • Language Barrier
Unique Iraq Challenges • Limited Raw Water Quality • Limited Survey and Geotechnical Data • Available Low Cost Work Force • Freight/Travel • Language Barrier • Politics
Unique Iraq Challenges SECURITY
Living and Working in Iraq
Working in Iraq
Construction Photo 1
Construction Photo 2
Construction Photo 3
Construction Photo 4
Construction Photo 5
Construction Photo 6
Construction Photo 7
Construction Photo 8
Construction Photo 9
Construction Photo 10
Construction Photo 11
Construction Photo 12
Construction Photo 13
Living in Iraq
The compound
4-star hotel (living quarters)
All the comforts of home
Fair and Balanced !
Baghdad
Green Zone
The Green Zone Cafe
Welcome to Baghdad Airport
Passenger Terminal
Waiting for your flight
IFRAZ WATER TREATMENT FACILITY GRAND OPENING
NASIRIYAH WATER TREATMENT FACILITY
Recommend
More recommend
Explore More Topics
Stay informed with curated content and fresh updates.