Region 5 Upcoming Proj ects S ummer/ Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The projects in this presentation are not


slide-1
SLIDE 1

Region 5 Upcoming Proj ects

S ummer/ Fall 2018

slide-2
SLIDE 2

The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The projects in this presentation are not guaranteed to go to advertisement.

slide-3
SLIDE 3

Projects located in Archuleta, La Plata, Montezuma and Mineral Counties

slide-4
SLIDE 4

US 160 Resurfacing on Elmore’s East; 22010

∙

Planned Ad Date: December 14, 2017

∙

Approximate Budget: $6 million budget

∙

County: La Plata

∙

Work: This surface treatment proj ect will resurface the roadway on US 160 from MP 91.42-102.72 from the Jct of US 172 to Bayfield.

slide-5
SLIDE 5

US 160 SH 84 to Treasure Falls Surface Treatment; 20705

∙

Planned Ad Date: January 11, 2018

∙

Approximate Budget: $8 million budget

∙

County: Archuleta and Mineral

∙

Work: This surface treatment proj ect will resurface the roadway from MP 114.5- 158.5, and includes a chain up and down station at MP 157.3

slide-6
SLIDE 6

SH 145 Dolores Sidewalk Ramps; 19796 ESB Restricted Project

∙

Planned Ad Date: November 30, 2017

∙

Approximate Budget: $400,000

∙

County: Montezuma

∙

Work: Proj ect work includes construction of sidewalk and ADA compliant curb ramps in Dolores at MP 9.6-10.6 on S H 145. Other work includes concrete flatwork for cross-pan curb and gutter, inlet repair, and minor landscaping repair. S igns, light poles, and a fence will be reset.

slide-7
SLIDE 7

R5 Guardrail End Treatment Replacement; 22120

∙

Planned Ad Date: To be determined

∙

Approximate Budget: $2 million

∙

County: Region-wide

∙

Work: Replace old standard guardrail end treatments throughout Region 5.

slide-8
SLIDE 8

Projects located in Fremont (Region 2) & Saguache Counties

slide-9
SLIDE 9

US 50 Passing Lanes East of Salida (Fremont County); 20401

∙

Planned Ad Date: To be determined

∙

Approximate Budget: $5 million

∙

County: Fremont

∙

Work: This proj ect located in Fremont County on US 50 between MP 227.2 and 237.4 consists of the addition of a passing lane in both directions and the addition of slow vehicle pullouts.

slide-10
SLIDE 10

US 50 Structure Replacement; 21338

∙

Planned Ad Date: February 5, 2018

∙

Approximate Budget: $2 million

∙

County: S aguache

∙

Work: This proj ect includes the replacement of a two lane bridge structure with a concrete box culvert.

slide-11
SLIDE 11

Traffic and Safety Projects

slide-12
SLIDE 12

US 550 Traffic Signal Replacement and ADA Ramp Construction; 20737

∙

Planned Ad Date: November 30, 2017

∙

Approximate Budget: $3.9 million budget

∙

County: La Plata

∙

Work: Replace signals, upgrade infrastructure and reconfigure side street approaches. Construct ADA Accessible Pedestrian S ignals and sidewalk ramps at 3 intersections in Durango.

Photo: Google Earth

slide-13
SLIDE 13

US 550 and SH 62 Striping and Rumble Strips; 21743

∙

Planned Ad Date: January 4, 2018

∙

Approximate Budget: $1 million

∙

County: La Plata, Ouray, S an Juan, S an Miguel

∙

Work: Rumble strips and restriping on US 550 MP 37.3-44 & 96.0-117.0, and S H 62 MP 9.0-16.0.

Photo: Google Earth

slide-14
SLIDE 14

US 160 Wolf Creek Pass RSA; 21744

∙

Planned Ad Date: January 18, 2018

∙

Approximate Budget: $2.2 million budget

∙

County: Mineral

∙

Work: S ignage and striping upgrades on US 160 from MP 160 to 166.5. Includes inlaid restriping, centerline rumble strips, two sign bridges, sign removal, sign panel replacements, and type 7 barrier with embankment, asphalt removal, and shoulder improvements.

slide-15
SLIDE 15

US 550 Chain Station & VMS at MP 94; 20894

  • Planned Ad Date: February 8, 2018

∙

Approximate Budget: $750,000

∙

County: Ouray

∙

Work: Work includes chipseal, restriping for chain up station, roadway widening for chain down station, install lighting and VMS board.

slide-16
SLIDE 16

R5 Region-wide Re-Stripe; 22310

  • Planned Ad Date: January 4, 2018

∙

Approximate Budget: $1.3 million

∙

County: Region-wide

∙

Work: Yearly restriping of highways in Region 5.

slide-17
SLIDE 17

R5 Chain Station Improvements; 22119

  • Planned Ad Date: May 18, 2018

∙

Approximate Budget: $1.2 million

∙

County: Region-wide

∙

Work: Providing improvements to chain stations, adding or upgrading lighting, improving striping, and potential widening.

slide-18
SLIDE 18

US 550 Riverside Snowshed Tunnel; 20799

  • Planned Ad Date: March 18, 2018

∙

Approximate Budget: $750,000

∙

County: Ouray, Red Mountain Pass

∙

Work: This proj ect includes the update of lighting in the Riverside S nowshed Tunnel.

slide-19
SLIDE 19

Local Agency Construction Projects

slide-20
SLIDE 20

Salida US 50 Sidewalks Phase 4; 20557

∙

Local Agency: City of S alida

∙

Planned Ad Date: S pring of 2018

∙

Approximate Budget: $500,000

∙

Work: This proj ect involves the construction

  • f concrete sidewalk separated from the back
  • f curb with a colored, textured concrete

buffer on both sides of US 50 from Palmer S t to the intersection of S H 291 on US 50 in S

  • alida. S
  • me curb and gutter and curb ramps

may be replaced. S

  • me accesses may be

moved or changed.

slide-21
SLIDE 21

Pagosa Springs North 8th Street SRTS; 21504

∙

Local Agency: Town of Pagosa S prings

∙

Planned Ad Date: S pring of 2018

∙

Approximate Budget: $400,000

∙

Work: This proj ect involves construction of sidewalks and curb and gutter in the north Pagosa S prings residential neighborhood on North 8t h S t and Florida S t.

slide-22
SLIDE 22

San Miguel Lawson Hill Park and Ride; 21755

∙

Local Agency: S an Miguel County

∙

Planned Ad Date: S pring 2018

∙

Approximate Budget: $1.5 million

∙

Work: This is a S enate Bill 228 funded Transit proj ect that will be advertised by S an Miguel County. This proj ect involves construction of a paved park-and-ride facility on Lot Hub-2C between S

  • ciety

Drive and S H 145 j ust west of Telluride.

slide-23
SLIDE 23

Archuleta CO Pagosa Junction BRO; 21898

∙

Local Agency: Archuleta County

∙

Planned Ad Date: S pring of 2018

∙

Approximate Budget: $250,000

∙

Work: This is an Archuleta County proj ect for the rehabilitation of bridge structure AR500-15.8-S 151 located on CR 500 (Truj illo Rd) at Pagosa Junction within the S

  • uthern Ute Indian Tribe Reservation. The

bridge is currently structurally deficient and will be rehabilitated and brought up to current standards with this proj ect.

slide-24
SLIDE 24

FY 17 Durango School Signs SRTS; 22063

∙

Local Agency: City of Durango

∙

Planned Ad Date: S ummer of 2018

∙

Approximate Budget: $75,000

∙

Work: Procurement of school signs at various locations around the City of Durango.

slide-25
SLIDE 25

Local Agency Projects for Design

slide-26
SLIDE 26

Archuleta CO Pagosa Junction BRO; 21898

∙

Local Agency: Archuleta County

∙

Planned Ad Date: Fall/ Winter 2017

∙

Approximate Budget: $250,000

∙

Work: This is an Archuleta County proj ect for the rehabilitation of bridge structure AR500- 15.8-S 151 located on County Road 500 (Truj illo Rd) at Pagosa Junction within the S

  • uthern

Ute Indian Tribe Reservation. The bridge is currently structurally deficient and will be rehabilitated and brought up to current standards with this proj ect. CDOT S taff Bridge has offered to complete Bridge Rehab Design but a Consulting Engineering Firms will be needed to complete clearances, finalize plans and specs and prepare bid package.

slide-27
SLIDE 27

Durango College Dr and E 8th Ave; 22062

∙

Local Agency: City of Durango

∙

Planned Ad Date: Fall/ Winter 2018

∙

Approximate Budget: $1 million

∙

Work: Trolley stop improvements using CDOT FAS TER Transit funding and road diet/ safety improvements using CDOT HS IP funding on College Dr from E 3rd Ave to E 8th Ave and on E 8th Ave from College Dr to 1st S t.

slide-28
SLIDE 28

Archuleta CR 600 Guardrail; 22269

∙

Local Agency: Archuleta County

∙

Planned Ad Date: Fall/ Winter 2017

∙

Approximate Budget: $100,000

∙

Work: Improvements to guardrail on Archuleta CR600 (Piedra Rd). Approximately 6 recently installed guardrail end treatments are too close to the travelled way and need to be flared away from traffic on the approach end. Design appropriate modifications and work through enviro, ROW and utility clearances and prepare bid documents.