REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1 Tobon Engineering PROJECT SCOPE HYDRAULIC MODEL REGIONAL TRANSMISSION SYSTEM MASTER PLAN DATA COLLECTION UPDATE & CALIBRATE SCENARIOS PHASE I TRANSIENT MODEL HYDRAULIC
EMERGENCY RESPONSE PLAN
RESPONSIVENESS EFFECTIVENESS GIS INTEGRATION
CAPITAL IMPROVEMENT PLAN
PRIORITIZATION COST ANAYLSIS BUDGETING
RISK-BASED ANALYSIS
CONDITION CRITICALITY
PHYSICAL OBSERVATIONS
STRUCTURAL ELECTRICAL MECHANICAL
TRANSIENT MODEL
HYDRAULIC MODEL SYSTEM PRESSURE DATA SCENARIOS
HYDRAULIC MODEL
DATA COLLECTION UPDATE & CALIBRATE SCENARIOS
PHASE I PHASE II
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
PROJECT SCOPE
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
PROJECT TEAM
James F. Thompson, P.E. Project Manager & Principal-in-Charge
EMERGENCY RESPONSE
THOMPSON & ASSOC. WSP TOBON ENGINEERING
CAPITAL IMPROVEMENT
THOMPSON & ASSOC. WSP TOBON ENGINEERING PREMIER DESIGN
RISK-BASED ANALYSIS
THOMPSON & ASSOC. WSP PREMIER DESIGN ROSS ENGINEERING
PHYSICAL OBSERVATIONS
THOMPSON & ASSOC. MUENGINEERING SMITH ENGINEERING
TRANSIENT MODELING
WSP THOMPSON & ASSOC.
HYDRAULIC MODELING
WSP TOBON ENGINEERING THOMPSON & ASSOC.
GIS SERVICES
FLORIDA TECHNICAL CONSULTANTS / WSP / PREMIER DESIGN / THOMPSON & ASSOC.
QA / QC
THOMPSON & ASSOC. / WSP / ROSS ENGINEERING
Robert Wilson, P.E. Broward County WWS Project Manager
DIANYS AROCHO, PE – GIS EXPERT OBTAIN CURRENT GIS FILES REVIEW AS-BUILTS REVIEW MAINTENANCE RECORDS CONDUCT O&M STAFF INTERVIEWS FIELD VERIFICATIONS
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
DATA COLLECTION
DATA GAPS AND ASSUMPTIONS FILE MANAGEMENT AND DELIVERY FORMAT MODEL NETWORK DEVELOPMENT PLAN MODEL BUILDER BOUNDARY CONDITIONS AND CALIBRATION MODEL VALIDATION AND PERFORMANCE ANALYSIS ALTERNATIVE ANALYSIS MODELING APPROACH
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1 REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
DEVELOP HYDRAULIC MODEL (INFOWATER)
ALTERNATIVE ANALYSIS
RASHEED AHMAD, PE, PhD INFOWATER EXPERT POPULATION GROWTH SEA LEVEL RISE & CLIMATE CHANGE LARGE-USER AGREEMENTS NIP & UAZ IMPROVEMENTS (I/I) SEPTIC TANK ELIMINATION PROGRAM
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
DEVELOP HYDRAULIC MODEL (INFOWATER)
50 60 70 80 90 100 110 120 10 20 30 40
Elapsed Time (min) Pressure (psi)
Starting Time: 3:38:20 PM, May 4, 2000 Steady Normal pump start-up Steady state Simulated Power Failure 1 Less Pump Normal pump start-up Normal pump shut-down Periodic Transient Pressures Attenuating
JEAN-LUC DAVIAU, PE – INFOSURGE EXPERT TRANSIENT (RAPID CHANGE) PRESSURES:
BURST / COLLAPSE PIPES LEAKING JOINTS DANGER TO O&M STAFF
MODEL PARAMETERS:
PUMPS (ON/OFF) BACKFLOW (OPEN/CLOSE/SLAM) VALVES (OPEN/CLOSE/THROTTLE) POWER OUTAGES
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
DEVELOP TRANSIENT MODEL (INFOSURGE)
POSSIBLE RECOMMENDATIONS:
FLOW & PRESSURE SENSORS SCADA MONITORING VFD MOTORS SLOW-CLOSING BACKFLOW VALVES ATTENUATION CYLINDERS SURGE TANKS SURGE ANTICIPATOR VALVES DUAL ARV’S
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
DEVELOP TRANSIENT MODEL (INFOSURGE)
REGIONAL MASTER PUMP STATION
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
PERFORM PHYSICAL OBSERVATIONS
440 – NEW ASSESSMENT 410 – UPDATE 2016 ASSESSMENT 451 – UPDATE 2016 ASSESSMENT 455 – UPDATE 2016 ASSESSMENT 460 – UPDATE 2016 ASSESSMENT 452 – DESIGN TO START 12/18 458 – DESIGN TO START 12/18 462 – DESIGN TO START 12/18 454 – DESIGN COMPLETED 5/18 456 – CONSTRUCTION TO BE COMPLETED 4/19 450 – CONSTRUCTION COMPLETED 9/18
STRUCTURAL INSPECTIONS:
CONCRETE CONDITION (SPALLING, CRACKING, ETC.) METAL CORROSION EXTERIOR CONDITION (ROOF, WINDOWS) SITE SECURITY / EMERGENCY ACCESS
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
MEP INSPECTIONS:
MECHANICAL SYSTEMS
HVAC HANDLERS FULL OSHA REVIEW DRYWELL SUMP EQUIPMENT
ELECTRICAL SYSTEMS
DUAL-GRID PROTECTION CONTROL PANEL CONDITION GENERATOR CAPACITY LIGHTNING / SURGE PROTECTION
COMMUNICATIONS
ALARMS / SECURITY CAMERAS SCADA
PERFORM PHYSICAL OBSERVATIONS
COMPLETE A RISK-BASED ANALYSIS
DEFINE SYSTEM COMPONENTS EVALUATE CHARACTERISTICS RANK IMPACTS PRIORITIZE RISKS CREATE A MATRIX SUMMARIZE RESULTS
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
COMPLETE RISK–BASED ANALYSIS
PRIORITIZE PROJECTS DEVELOP ESTIMATES OF PROBABLE COSTS CREATE SCHEDULES (DESIGN/CONSTRUCTION) IDENTIFY ANNUAL BUDGET GOALS CREATE A 5-YEAR BUDGET ASSIST BCWWS IDENTIFY ALTERNATIVE FUNDING SOURCES (SECTION 319(H) GRANTS, TMDL GRANTS, SFWMD COOP FUNDING)
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
DEVELOP CAPITAL IMPROVEMENT PLAN
BCWWS ASSESS NEEDS (YEAR ROUND) OMBC REVIEW FUNDING ANALYSIS (NOV. TO DEC.) BCWWS SUBMITS REQUESTS (DEC. TO FEB.) OMBC PRIORITIZES CAPITAL PROJECTS (MARCH) DEVELOPMENT OF 5-YEAR CIP (APRIL TO MAY) COUNTY ADMINISTRATOR REVIEW (JUNE) PRESENTATION TO COUNTY COMMISSION (JULY) COUNTY COMMISSION REVIEW (AUGUST) CAPITAL PROGRAM ADOPTION (SEPTEMBER)
WE WILL ASSIST BCWWS EVERY STEP OF THE WAY!
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
DEVELOP CAPITAL IMPROVEMENT PLAN
AWWA MANUAL OF PRACTICE M19 CATEGORIZE EVENTS (EMERGENCY, MAJOR, MINOR, NATURAL, OTHERS) COMMUNICATION CHART (EMERGENCY CALL LIST) CREATE RESPONSE FLOWCHART INTEGRATE GIS TOOLS UTILIZE REAL-TIME SCADA INFO
STAFF TRAINING
REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1
DEVELOP EMERGENCY MANAGEMENT PLAN
- T&A IS LOCAL AND AVAILABLE AT A MOMENTS
NOTICE.
RESPONSIVE
- T&A HAS A 20 YEAR TRACK RECORD FOR
DELIVERING BCWWS PROJECTS.
EXPERIENCED
- THE T&A TEAM HAS NATIONALLY RECOGNIZED
EXPERTS THAT WILL SAVE TIME AND BUDGET.
COMPETENT
- THE T&A TEAM ELIMINATES REDUNDANT
EFFORTS AND STREAMLINES TASKS.
EFFICENT
- THE T&A TEAM KNOWS THE BCWWS