REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1 Tobon Engineering PROJECT SCOPE HYDRAULIC MODEL REGIONAL TRANSMISSION SYSTEM MASTER PLAN DATA COLLECTION UPDATE & CALIBRATE SCENARIOS PHASE I TRANSIENT MODEL HYDRAULIC


slide-1
SLIDE 1

REGIONAL TRANSMISSION SYSTEM MASTER PLAN

Solicitation PNC2116651P1

Tobon Engineering

slide-2
SLIDE 2

EMERGENCY RESPONSE PLAN

RESPONSIVENESS EFFECTIVENESS GIS INTEGRATION

CAPITAL IMPROVEMENT PLAN

PRIORITIZATION COST ANAYLSIS BUDGETING

RISK-BASED ANALYSIS

CONDITION CRITICALITY

PHYSICAL OBSERVATIONS

STRUCTURAL ELECTRICAL MECHANICAL

TRANSIENT MODEL

HYDRAULIC MODEL SYSTEM PRESSURE DATA SCENARIOS

HYDRAULIC MODEL

DATA COLLECTION UPDATE & CALIBRATE SCENARIOS

PHASE I PHASE II

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

PROJECT SCOPE

slide-3
SLIDE 3

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

PROJECT TEAM

James F. Thompson, P.E. Project Manager & Principal-in-Charge

EMERGENCY RESPONSE

THOMPSON & ASSOC. WSP TOBON ENGINEERING

CAPITAL IMPROVEMENT

THOMPSON & ASSOC. WSP TOBON ENGINEERING PREMIER DESIGN

RISK-BASED ANALYSIS

THOMPSON & ASSOC. WSP PREMIER DESIGN ROSS ENGINEERING

PHYSICAL OBSERVATIONS

THOMPSON & ASSOC. MUENGINEERING SMITH ENGINEERING

TRANSIENT MODELING

WSP THOMPSON & ASSOC.

HYDRAULIC MODELING

WSP TOBON ENGINEERING THOMPSON & ASSOC.

GIS SERVICES

FLORIDA TECHNICAL CONSULTANTS / WSP / PREMIER DESIGN / THOMPSON & ASSOC.

QA / QC

THOMPSON & ASSOC. / WSP / ROSS ENGINEERING

Robert Wilson, P.E. Broward County WWS Project Manager

slide-4
SLIDE 4

 DIANYS AROCHO, PE – GIS EXPERT  OBTAIN CURRENT GIS FILES  REVIEW AS-BUILTS  REVIEW MAINTENANCE RECORDS  CONDUCT O&M STAFF INTERVIEWS  FIELD VERIFICATIONS

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

DATA COLLECTION

slide-5
SLIDE 5

DATA GAPS AND ASSUMPTIONS FILE MANAGEMENT AND DELIVERY FORMAT MODEL NETWORK DEVELOPMENT PLAN MODEL BUILDER BOUNDARY CONDITIONS AND CALIBRATION MODEL VALIDATION AND PERFORMANCE ANALYSIS ALTERNATIVE ANALYSIS MODELING APPROACH

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1 REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

DEVELOP HYDRAULIC MODEL (INFOWATER)

slide-6
SLIDE 6

ALTERNATIVE ANALYSIS

 RASHEED AHMAD, PE, PhD INFOWATER EXPERT  POPULATION GROWTH  SEA LEVEL RISE & CLIMATE CHANGE  LARGE-USER AGREEMENTS  NIP & UAZ IMPROVEMENTS (I/I)  SEPTIC TANK ELIMINATION PROGRAM

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

DEVELOP HYDRAULIC MODEL (INFOWATER)

slide-7
SLIDE 7

50 60 70 80 90 100 110 120 10 20 30 40

Elapsed Time (min) Pressure (psi)

Starting Time: 3:38:20 PM, May 4, 2000 Steady Normal pump start-up Steady state Simulated Power Failure 1 Less Pump Normal pump start-up Normal pump shut-down Periodic Transient Pressures Attenuating

 JEAN-LUC DAVIAU, PE – INFOSURGE EXPERT  TRANSIENT (RAPID CHANGE) PRESSURES:

 BURST / COLLAPSE PIPES  LEAKING JOINTS  DANGER TO O&M STAFF

 MODEL PARAMETERS:

 PUMPS (ON/OFF)  BACKFLOW (OPEN/CLOSE/SLAM)  VALVES (OPEN/CLOSE/THROTTLE)  POWER OUTAGES

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

DEVELOP TRANSIENT MODEL (INFOSURGE)

slide-8
SLIDE 8

POSSIBLE RECOMMENDATIONS:

 FLOW & PRESSURE SENSORS  SCADA MONITORING  VFD MOTORS  SLOW-CLOSING BACKFLOW VALVES  ATTENUATION CYLINDERS  SURGE TANKS  SURGE ANTICIPATOR VALVES  DUAL ARV’S

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

DEVELOP TRANSIENT MODEL (INFOSURGE)

slide-9
SLIDE 9

REGIONAL MASTER PUMP STATION

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

PERFORM PHYSICAL OBSERVATIONS

440 – NEW ASSESSMENT 410 – UPDATE 2016 ASSESSMENT 451 – UPDATE 2016 ASSESSMENT 455 – UPDATE 2016 ASSESSMENT 460 – UPDATE 2016 ASSESSMENT 452 – DESIGN TO START 12/18 458 – DESIGN TO START 12/18 462 – DESIGN TO START 12/18 454 – DESIGN COMPLETED 5/18 456 – CONSTRUCTION TO BE COMPLETED 4/19 450 – CONSTRUCTION COMPLETED 9/18

slide-10
SLIDE 10

 STRUCTURAL INSPECTIONS:

 CONCRETE CONDITION (SPALLING, CRACKING, ETC.)  METAL CORROSION  EXTERIOR CONDITION (ROOF, WINDOWS)  SITE SECURITY / EMERGENCY ACCESS

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

 MEP INSPECTIONS:

 MECHANICAL SYSTEMS

 HVAC HANDLERS  FULL OSHA REVIEW  DRYWELL SUMP EQUIPMENT

 ELECTRICAL SYSTEMS

 DUAL-GRID PROTECTION  CONTROL PANEL CONDITION  GENERATOR CAPACITY  LIGHTNING / SURGE PROTECTION

 COMMUNICATIONS

 ALARMS / SECURITY CAMERAS  SCADA

PERFORM PHYSICAL OBSERVATIONS

slide-11
SLIDE 11

 COMPLETE A RISK-BASED ANALYSIS

 DEFINE SYSTEM COMPONENTS  EVALUATE CHARACTERISTICS  RANK IMPACTS  PRIORITIZE RISKS  CREATE A MATRIX  SUMMARIZE RESULTS

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

COMPLETE RISK–BASED ANALYSIS

slide-12
SLIDE 12

 PRIORITIZE PROJECTS  DEVELOP ESTIMATES OF PROBABLE COSTS  CREATE SCHEDULES (DESIGN/CONSTRUCTION)  IDENTIFY ANNUAL BUDGET GOALS  CREATE A 5-YEAR BUDGET  ASSIST BCWWS  IDENTIFY ALTERNATIVE FUNDING SOURCES (SECTION 319(H) GRANTS, TMDL GRANTS, SFWMD COOP FUNDING)

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

DEVELOP CAPITAL IMPROVEMENT PLAN

slide-13
SLIDE 13

BCWWS ASSESS NEEDS (YEAR ROUND) OMBC REVIEW FUNDING ANALYSIS (NOV. TO DEC.) BCWWS SUBMITS REQUESTS (DEC. TO FEB.) OMBC PRIORITIZES CAPITAL PROJECTS (MARCH) DEVELOPMENT OF 5-YEAR CIP (APRIL TO MAY) COUNTY ADMINISTRATOR REVIEW (JUNE) PRESENTATION TO COUNTY COMMISSION (JULY) COUNTY COMMISSION REVIEW (AUGUST) CAPITAL PROGRAM ADOPTION (SEPTEMBER)

WE WILL ASSIST BCWWS EVERY STEP OF THE WAY!

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

DEVELOP CAPITAL IMPROVEMENT PLAN

slide-14
SLIDE 14

 AWWA MANUAL OF PRACTICE M19  CATEGORIZE EVENTS (EMERGENCY, MAJOR, MINOR, NATURAL, OTHERS)  COMMUNICATION CHART (EMERGENCY CALL LIST)  CREATE RESPONSE FLOWCHART  INTEGRATE GIS TOOLS  UTILIZE REAL-TIME SCADA INFO

 STAFF TRAINING

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

DEVELOP EMERGENCY MANAGEMENT PLAN

slide-15
SLIDE 15
  • T&A IS LOCAL AND AVAILABLE AT A MOMENTS

NOTICE.

RESPONSIVE

  • T&A HAS A 20 YEAR TRACK RECORD FOR

DELIVERING BCWWS PROJECTS.

EXPERIENCED

  • THE T&A TEAM HAS NATIONALLY RECOGNIZED

EXPERTS THAT WILL SAVE TIME AND BUDGET.

COMPETENT

  • THE T&A TEAM ELIMINATES REDUNDANT

EFFORTS AND STREAMLINES TASKS.

EFFICENT

  • THE T&A TEAM KNOWS THE BCWWS

PROCESSES, HISTORY AND GOALS.

KNOWLEDGABLE

REGIONAL TRANSMISSION SYSTEM MASTER PLAN Solicitation PNC2116651P1

THE RIGHT TEAM FOR THIS PROJECT