SLIDE 7 7
P r e p a r e - D e p l o y - E n a b l e
FSS Follow-Up
Question: Are residents who are PCSing this summer able to
receive orders early to arrange moves prior to project start?
The earliest AFPC can authenticate orders is 120 days prior to
member’s projected departure date, with the goal of completing NLT 60 days prior to departure.
AFPC will not grant an exception to policy based on the
circumstances surrounding the construction project.
The MPS can only draft the PCS order after the following actions are
completed:
- Assignment loaded by member’s functional community
- Initial outprocessing briefing online (vMPF)
- Initial outprocessing requirements (medical, dental, immunization
clearance, retention, etc.)
Orders drafted within 72 hours and sent to AFPC for authentication,
which can take up to 10 days.
13
P r e p a r e - D e p l o y - E n a b l e
FSS Follow-Up (Lodging)
Question: Can affected residents who are PCSing move into
TLFs prior to project start?
The maximum TLF stay for PCS in/out, those retiring,
separating or hospital patients is 30 days, if available. Guests may stay beyond the 30 day maximum on a space available status pending current occupancy and availability. (AFI 34- 135, para 3.3) Historical lodging rates show that we normally reach max capacity in TLFs by mid-June.
The Goldrush can accept initial reservations anytime if guests
know their window of departure. We will grant up to 30 days if that amount of time is available.
We will only be able to provide 24-hour notification if Priority 2
guests must vacate.
14