Rule of Thumb for selecting Insulated Metal Panels (IMPS) Paul - - PowerPoint PPT Presentation
Rule of Thumb for selecting Insulated Metal Panels (IMPS) Paul - - PowerPoint PPT Presentation
Rule of Thumb for selecting Insulated Metal Panels (IMPS) Paul Bertram FCSI, CDT, LEED AP BD&C paul.bertram@kingspan.com 386-785-3063 IMP Continuous Improvement & Product Optimization Insulated Metal Panel Cradle to Grave
IMP Continuous Improvement & Product Optimization
Insulated Metal Panel Cradle to Grave LCA
INSULATED METAL PANELS (IMP) Rule of Thumb: It’s the sum of the components
- Short Cut:
– IMPs are Off-Site manufactured single component assemblies
- IMP EPDs can be: Product specific or
Industry Wide
- Question to ask:
– How are EPD assemblies to be considered?
- Caveat:
– EPD COMPARATIVE analysis is required
INSULATED METAL PANELS (IMP) Level 2 Disclosure/Optimization
- Continuous Improvement Business Case
– Improved performance – Cost savings – Health, Safety, Social responsibility – Market differentiation
- Product Disclosure/Optimization
– HPD - Full Chemical inventory disclosure – GreenScreen, Risk Assessment – Environmental Management System – ISO 9001, ISO 14001, ISO 18001 – Supply Chain Continuous Improvement
- Corporate Sustainability Reporting
– GRI compliant Sustainability Reporting – Carbon Disclosure Project Reporting
INSULATED METAL PANELS (IMP) Level 3 Material Evaluation - LEED & Beyond
- None-ozone Depleting
– As installed End Product
- Recycled and Recyclable
– Steel skins contain substantial amounts
- f recycled content depending on the
supplier up to 89% – Recycled Foam chemistry content – Recycled foam as downstream feedstock
- IMP End of Life (EoL)
– Designed for deconstruction – Pathways for recycling the steel and the foam to avoid the landfill – Zero Landfill goals.
INSULATED METAL PANELS (IMP) Level 4 – Functional Performance and Innovation
- High Performance Energy Efficiency
– Envelope First Energy Efficiency – Reduces Demand Side Energy and related GHGs – Energy Efficiency contributions to the EPA Clean Power Plan
- Factory Controlled Quality
– “Off-Site Construction” – Eliminates many of the latent defects related to Site Built Construction – Little to no site construction waste impacts
- Industry Leadership
– Standards development – Certified Team members – Dedicated Environment & Sustainability Director