SAXE MIDDLE SCHOOL YOUR PROJECT TEAM Updated June 27, 2016 LOREL - - PowerPoint PPT Presentation
SAXE MIDDLE SCHOOL YOUR PROJECT TEAM Updated June 27, 2016 LOREL - - PowerPoint PPT Presentation
SAXE MIDDLE SCHOOL YOUR PROJECT TEAM Updated June 27, 2016 LOREL PURCELL , PE, LEED AP LO , PE, LEED AP MARK ARK JEFFK JEFFKO , LEED AP , LEED AP NELSON R NEL SON REIS EIS ROGER JOHNSON RO Project Executive Pre-Construction Manager
YOUR PROJECT TEAM
EXPERIENCE COLLABORATION EXPERTISE
Project Executive MARK ARK JEFFK JEFFKO, LEED AP
, LEED AP
Superintendent RO ROGER JOHNSON Project Manager NEL NELSON R SON REIS EIS Pre-Construction Manager LO LOREL PURCELL, PE, LEED AP
, PE, LEED AP
Updated June 27, 2016
AREA 1A New Addition Summer 2016 – Fall 2017 AREA 1B Auditorium Renovation Summer 2016 – Spring 2017 AREA 1C Partial Renovation Summer 2016
- f 2 Existing Classrooms
AREA 2A Convert Existing Choral Room Summer 2017 – Fall 2017 into Expanded Band Room Convert Existing Art Rooms into Choral and Storage Rooms AREA 2B Minor Renovations to General Summer 2017 Music, Orchestra & Small Band & Choral Complete Band Room Renovation Complete Special Education Classroom
Building Confidence
Construction Milestones
Saxe Middle School
Building Confidence
Construction Work Plan
Saxe Middle School
Area 1AJ Summer 2016 – Summer 2017 Area 1B Summer 2016 – Spring 2017 Area 1C Summer 2016 Area 2A Summer 2017 – Fall 2017 Area 2B Summer 2017 Masonry infills & HVAC ventilation work only during Area 1C. Remainder of work Area 2B. Abate Boiler Room
Overall Construc9on: Summer 2016 – Fall 2017
First Floor Area A
Rated Temporary Partition with Drywall Ceiling Rated Temporary Partition with Drywall Ceiling Rated Temporary Partition with Drywall Ceiling Contractor Access to Auditorium Rated Temporary Partition with Drywall Ceiling
5’
Temporary Partitions Plan
Saxe Middle School
Building Confidence
Second Floor Area B
Temporary enclosed Stair Tower from roof to grade 4’ wide aluminum planking with ballasted weighted bases and OSHA approved guardrails on both sides Temporary handrail Emergency Stairs
UP
Rated Temporary Partition
Temporary Partitions Plan
Saxe Middle School
Building Confidence
Designated Contractor Parking Dumpsters 20’ Double Drive Gate 20’ Double Drive Gate Moveable Fencing Moveable Fencing 20’ Double Drive Gate 20’ Double Drive Gate Construction Entrance Construction Entrance
Site Logistics Plan
Saxe Middle School
Building Confidence
Project Commentary
Concrete
§ Scheduled to start Aug 1
Masonry
§ Masonry infills Area B to start end of July
Drywall
§ Interior temporary par99on work Corridor side Areas A & B
Sitework
§ Site prepara9on, fencing and erosion controls. § Exis9ng site prepared for the installa9on of temporary access and parking. § Site U9lity work started including excava9on for new storm water deten9on system
Demoli9on
§ Abatement and encapsula9on at Auditorium § Abatement and encapsula9on at Corridor A135
SAXE MIDDLE SCHOOL
SAFETY IS MORE THAN A SLOGAN
Work Zone Separation Safety Coordination with Pre-construction Background Checks Job Safety Task Analysis (JSTA) Weekly Safety Meetings Constant Monitoring