SAXE MIDDLE SCHOOL

slide-2
SLIDE 2

YOUR PROJECT TEAM

EXPERIENCE COLLABORATION EXPERTISE

Project Executive MARK ARK JEFFK JEFFKO, LEED AP

, LEED AP

Superintendent RO ROGER JOHNSON Project Manager NEL NELSON R SON REIS EIS Pre-Construction Manager LO LOREL PURCELL, PE, LEED AP

, PE, LEED AP

Updated June 27, 2016

slide-3
SLIDE 3

AREA 1A New Addition Summer 2016 – Fall 2017 AREA 1B Auditorium Renovation Summer 2016 – Spring 2017 AREA 1C Partial Renovation Summer 2016

  • f 2 Existing Classrooms

AREA 2A Convert Existing Choral Room Summer 2017 – Fall 2017 into Expanded Band Room Convert Existing Art Rooms into Choral and Storage Rooms AREA 2B Minor Renovations to General Summer 2017 Music, Orchestra & Small Band & Choral Complete Band Room Renovation Complete Special Education Classroom

Building Confidence

Construction Milestones

Saxe Middle School

slide-4
SLIDE 4

Building Confidence

Construction Work Plan

Saxe Middle School

Area 1AJ Summer 2016 – Summer 2017 Area 1B Summer 2016 – Spring 2017 Area 1C Summer 2016 Area 2A Summer 2017 – Fall 2017 Area 2B Summer 2017 Masonry infills & HVAC ventilation work only during Area 1C. Remainder of work Area 2B. Abate Boiler Room

Overall Construc9on: Summer 2016 – Fall 2017

slide-5
SLIDE 5

First Floor Area A

Rated Temporary Partition with Drywall Ceiling Rated Temporary Partition with Drywall Ceiling Rated Temporary Partition with Drywall Ceiling Contractor Access to Auditorium Rated Temporary Partition with Drywall Ceiling

5’

Temporary Partitions Plan

Saxe Middle School

Building Confidence

slide-6
SLIDE 6

Second Floor Area B

Temporary enclosed Stair Tower from roof to grade 4’ wide aluminum planking with ballasted weighted bases and OSHA approved guardrails on both sides Temporary handrail Emergency Stairs

UP

Rated Temporary Partition

Temporary Partitions Plan

Saxe Middle School

Building Confidence

slide-7
SLIDE 7

Designated Contractor Parking Dumpsters 20’ Double Drive Gate 20’ Double Drive Gate Moveable Fencing Moveable Fencing 20’ Double Drive Gate 20’ Double Drive Gate Construction Entrance Construction Entrance

Site Logistics Plan

Saxe Middle School

Building Confidence

slide-8
SLIDE 8

Project Commentary

Concrete

§ Scheduled to start Aug 1

Masonry

§ Masonry infills Area B to start end of July

Drywall

§ Interior temporary par99on work Corridor side Areas A & B

Sitework

§ Site prepara9on, fencing and erosion controls. § Exis9ng site prepared for the installa9on of temporary access and parking. § Site U9lity work started including excava9on for new storm water deten9on system

Demoli9on

§ Abatement and encapsula9on at Auditorium § Abatement and encapsula9on at Corridor A135

slide-9
SLIDE 9

SAXE MIDDLE SCHOOL

slide-10
SLIDE 10

SAFETY IS MORE THAN A SLOGAN

Work Zone Separation Safety Coordination with Pre-construction Background Checks Job Safety Task Analysis (JSTA) Weekly Safety Meetings Constant Monitoring

24-HOUR SAFETY HOTLINE SAFETY MONITORING & INCIDENT TRACKING EXPERT SAFETY TEAM