Sewer Cleaning and Inspection Project Alexandria Renew Enterprises - PowerPoint PPT Presentation
Holmes Run Trunk Sewer Cleaning and Inspection Project Alexandria Renew Enterprises Here are some bullet points. And a few more for you to see what this presentation could look like. One last point right here. Holmes Run Trunk
Holmes Run Trunk Sewer Cleaning and Inspection Project
Alexandria Renew Enterprises • Here are some bullet points. • And a few more for you to see what this presentation could look like. • One last point right here.
Holmes Run Trunk Sewer Cleaning and Inspection Project • Objective • To remove accumulated debris and sediment • To conduct a video inspection (CCTV) to identify areas requiring subsequent rehabilitation
Why is this project necessary? • Preventive Maintenance • Keeps interceptor sewers in proper working condition • Reduces likelihood of flooding and pollution • Should be conducted every 5-7 years • Condition Assessment • Helps AlexRenew identify defects and make decisions about the need for rehabilitation, segment replacement, or further inspections
How will the work be performed? • Cleaning includes: • Light cleaning (Water Jetter) • Debris removal (Vacuum Truck) • Access achieved from roadside, where possible • Otherwise, equipment will be situated along Holmes Run Trail
How will the work be performed? • Inspection • With a color CCTV camera and light mounted on tracks, an inspection device will be inserted into the interceptor sewer to inspect the pipe
How will the work be performed? • Limited access areas: • Equipment will be situated along Holmes Run Trail • Cleaning • track mounted reel with extended hose • Inspection • track mounted CCTV vehicle that can traverse different types of terrain
What areas will be affected? Matchline A Matchline A N Dora Kelley Nature Park HRTS FX HRTS Matchline B
What areas will be affected? Matchline B HRTS N FX HRTS Matchline C
What areas will be affected? Matchline C N HRTS FX HRTS Matchline D
What areas will be affected? Matchline E Matchline D HRTS N HRTS Tarleton Park FX HRTS FX HRTS Matchline E Matchline F
What areas will be affected? Matchline F Clermont Natural Park HRTS Matchline G N FX HRTS Cameron Run HRTS Regional Park Matchline G FX HRTS Last manhole to be inspected on Park property
When will the work be performed? • February 2016 – May 2016 • Day Work • from MH-4972 (Dora Kelley Nature Park) • to MH-4243 (near Holmes Run Trail in Tarleton Park) • Night Work • from MH-4243 (near Holmes Run Trail in Tarleton Park) • to MH-6107 (just west of AlexRenew)
What will this mean for our community? • Some Noise and Traffic • You may see and hear vacuum trucks from Video Pipe Services using high pressure water jets • However… • Work will not occur in the same location for the duration of the project • Most of the work will be performed during the day, except in areas where conditions necessitate cleaning and inspection at night
If you have questions or concerns, contact: Hans Bailey Senior Customer Service Manager Alexandria Renew Enterprises 1500 Eisenhower Ave, Alexandria, VA 22314 (office) 703-549-3381 x2206 hans.bailey@alexrenew.com | www.alexrenew.com
Recommend
More recommend
Explore More Topics
Stay informed with curated content and fresh updates.