Shoup, ScoA Davis, Michael Blackburn, Ping Du Why AIQ in GBC? - - PowerPoint PPT Presentation
Shoup, ScoA Davis, Michael Blackburn, Ping Du Why AIQ in GBC? - - PowerPoint PPT Presentation
Analytical Instrument Qualification Team A9 Chad Briscoe, Hidehisa Tachiki, Jianing Zeng, Manish Yadav, Ka9a Pastre, Petra Struwe, Ron Shoup, ScoA Davis, Michael Blackburn,
2 ¡
- Many regulations that are implicitly applicable
- Few regulations that are explicitly applicable
- Not clear which regulations apply, must pick and choose pieces
from many sources
- Not included in most (any) guidance documents for regulated Bio
(eg. FDA, EMA)
- Easy to overdo it (go GMP). Pharma needs to reduce overhead
- Easy to underdo it. Due to lack of time and/or resources
- Opinions inside companies vary as much (or more?) between
different departments in the same company than between the same departments between different companies.
Why AIQ in GBC?
Ops QA IT
3 ¡
GLP
- Swiss AGIT
- OECD Application of GLP
to Computerised Systems GMP
- USP <1058>
- GAMP5
- FDA 21CFR Part 11
- EMA Annex 11
- FDA Med Device
Guidance
Some of the Regs to Consider
Clinical
- FDA Guidance Comp
Systems in Clinical Investigations
- Japanese Guideline for
Electromagnetic Records in Applications for Pharmaceuticals Engineering
- NIST Risk Mgmt Guide
for IT systems
4 ¡
Keep it in perspective
In ¡Scope ¡
- Equipment ¡SoLware ¡Valida9on ¡
- Change ¡control/Rou9ne ¡requalifica9on ¡
- Instruments/Equipment ¡
- System ¡Suitability ¡(overview) ¡
- Holis9c ¡Approach ¡
- Regulatory/Audits ¡
- Role ¡of ¡the ¡Laboratory ¡and ¡IT ¡in ¡Lab ¡SoLware ¡Valida9on ¡
¡ Out ¡of ¡Scope ¡
- IT ¡Infrastructure ¡Qualifica9on ¡
- Design ¡Qualifica9on ¡
- Stand-‑alone/non-‑instrument ¡controlling ¡soLware: ¡spreadsheets, ¡
homegrown, ¡COTS ¡
- LIMS, ¡ELN ¡where ¡not ¡interfacing ¡with ¡instruments ¡
5 ¡
- AIQ is a globally recognized, required activity
- Most regulated labs do some form of AIQ
- Who does which activities varies greatly
- Terminology is not harmonized
- Amount of effort in companies varies greatly
- Effort should always involve: Operations, IT, QA and
Vendors
Current Situation
- IQOQPQ
- Traditional approach still valid
- Software validation in AIQ process
- Requalification (RQ?)
- Audits – Part 11, other regs?
- Defining the roles of Operations, QA and IT in
the process
Overview
IQ OQ PQ
At least we’re not validating that!
IQ OQ PQ in one slide!
User ¡Requirement ¡ Specifica9ons ¡ Func9onal ¡ Specifica9ons ¡ Opera9onal ¡ Qualifica9on ¡ Design ¡ Specifica9on ¡ Design ¡ Qualifica9on ¡ Installa9on ¡ Qualifica9on ¡ Performance ¡ Qualifica9on ¡ Process Flow Reference
Installa'on ¡Qualifica'on ¡(IQ) ¡-‑ ¡The ¡IQ ¡is ¡comprised ¡of ¡ documenta9on ¡that ¡demonstrates ¡that ¡the ¡system ¡is ¡installed ¡
- properly. ¡ ¡
¡ Opera'onal ¡Qualifica'on ¡(OQ) ¡-‑ ¡The ¡OQ ¡is ¡comprised ¡of ¡ documenta9on ¡that ¡demonstrates ¡that ¡the ¡system ¡is ¡opera9onal ¡ in ¡its ¡installed ¡environment. ¡ ¡ Performed ¡by ¡manufacturer ¡ Signed ¡off ¡by ¡ ¡owner
IQ and OQ
10 ¡
- The PQ is comprised of documentation that demonstrates that
the system performs the functions that the users need it to.
- PQ phase verifies integrity of installation at site, including
network access, security, configuration tests; PQ also includes customer-specified tests that may be more relevant to the site, such as the execution of a trusted method.
- Aspects of PQ can be holistic. eg. you might need the MS to
test the HPLC acquisition.
- Design scripts specific to the environment you are working in.
- Core validation run with curve, QCs.
- To verify carryover, sensitivity, device communication, other instrument
performance parameters.
Performance Qualification
11 ¡
First Instrument
- Full IQ/OQ/PQ
- Software validation
- IT Environment set up
and check
- Functionality with anti-virus,
etc.
- Network, folder security
- Write SOPs
- Establish maintenance
schedules
Multiple Instruments?
Replicate Instrument (2nd, 3rd, etc) of same type.
- Same IQ/OQ
- Replicate IT settings
- Minimal or no PQ
- Review SOP
- Implement same PM
12 ¡
Categorization
Ø For each item of incoming equipment, user/lab manager to select equipment category and document selection rationale according to local regs, then qualify according to category. Ø Which categorization approach?
- GAMP 5
- USP 1058 (adapted from Bansal, et al white paper)
- Very simple
– Tools, instruments
– Metrology tools – reference weights, check plates (binding assays)
Ø Categories are based on complexity, configurability, and criticality.
13 ¡
- Owner should review draft OQ carefully, remove those test scripts that
simply generate busywork for vendor or CRO, and add scripts that test holistic performance.
- Requirements not for what you buy but what you must test.
- Use requirements to build traceability matrix
- Consider qualification of metrology tools
- Vendor should provide the specifications and any expiration dating for these
- materials. From time to time, these standards will need to be re-verified.
- Calibration standards provide traceable “standard of truth” to verify or recalibrate
instruments to acceptable performance.
Random thoughts…
14 ¡
Vendor Risk Analysis
- 3rd party installer’s qualified
- Safety Procedures
- ISO Certificate
- Reputation
Approaches
- Teleconference
- Questionnaire
- May audit on-site for major
equipment If vendor process is good, it can minimize your work.
Procurement Process
- Vendor work only isn’t
- enough. Must test in your
environment for your specific use.
- General testing
- Assay specific testing
q For most complex instruments, software can’t be validated separately from the instrument qualification.
q Complete computerized system validation.
q What reg’s apply to electronic data?
q FDA’s 21 CFR Part 11 recognized as a global “standard” for electronic data but can’t forget other regs that are emerging q EMA Annex 11, GAMP5, many others?
q Is there value in executing standard test scripts? Probably not. Only tests aspects that can change in your installation. q It is more value added to focus on how the instrument works in your
- peration with the software.
q Validation of configured portions of the software only. q Instrument parameters established by the software are not validatable by end user. Example: MS source temperature, MS voltages, robotic movement details. q COTS code review is not necessary
Comments on Equipment Control Software Validation
Routine Maintenance System Suitability Requalification (RQ) Audits
After the IQOQPQ Process
- Establish during or following qualification
- Define the process
- SOP, Work Instruction, refer to Manual
- Calibration Process
- Who to call for repair
- Archive your service contract
- Build a schedule and document it somewhere
so its not forgotten
- Give it to QA, they’ll make sure you do it.
Routine Maintenance
18 ¡
Ø Establish process BEFORE release Ø Must have predefined process Ø Repair Categories
- Move of instrument
- Upgrade
- Broken
- Routine Maintenance
Ø Requalification is what you must do before restarting the batch Ø Often includes some elements of IQ/OQ/PQ
Requalification (RQ)
19 ¡
- Qualification of all components of
an entire system at once.
- Useful approach in many
- ccasions
- Repaired systems can be re-qualified
holistically using a reference method.
- Often part of PQ and RQ
- System Suitability is a common
example of holistic qualification.
Holistic Qualification
20 ¡
Why?
- In GLP is usually assay specific.
- Ensure instruments and equipment are prepared for run.
- In regulated bioanalysis system suitability is the assay specific
part of the qualification process.
- Performed at regular intervals but not always for every batch
Chromatographic Assays
- A few injections before, during and/or after a run
Binding Assays, Plate Format
- Qualification plate specific to your assay type
Details
- Specific details within other teams
Where Does System Suitability Fit In?
21 ¡
Ø Lack of consistency
Ø Regulators often don’t have consistent audit practices, some better than others Ø May get very little notice of FDA audits so must be prepared on the IT side. Other agencies generally give more notice. Ø Companies in transition
Ø Expectation for GMP testing and documentation
Ø GMP is often not necessary or appropriate.
Ø Audits often focus more on process and documentation, not details of tests
Ø Spend extra time on documentation and ensure thorough review. Ø Keep complete and reproducible audit trails Ø Written procedures in place. Follow your procedures.
Ø Printed versus electronic records:
Ø What is the definition of the raw data? Sometimes more important is what is your companies definition. Ø All of the data throughout the process is the raw data, not just the finalized data. Ø Are printed versions of electronic records required?
Regulations and Audit Preparation
22 ¡
IT – LAB specialist and QA
- Develop Requirements
- Manage Documentation
- Maintain Validated State throughout Lifecycle
- Change control
- Archival and retirement
- Software IQ/OQ and configuration
- Help Users in Acceptance testing, manage issue resolution
- Interpret and communicate regulations
- Perform Periodic Reviews
Vendor
- Provide system/software installation.
- Some vendor will conduct IQ and OQ to release the equipment to
business unit.
- Ensure they follow their processes and use qualified 3rd parties.
- Obtain approval from system owner before conducting their testing.
Roles and Responsibilities 1 of 2
23 ¡
Roles and Responsibilities 2 of 2
Lab
- Identify System Owner
- System/operational requirements
- Ensure proper level of validation and deliverables based risk-based
assessment.
- Work with IT to generate user acceptance tests scripts.
- Conduct user acceptance tests.
- Prepare related SOP before system release to production.
- Ensure that the validation status is maintained throughout the lifecycle of
the computerized system.
- Conduct instrument PQ
- Ensure proper training for users.
- Document calibration, maintenance, upgrades and services.
- Manage change control.
General Consensus
- Business unit is the leader to ensure proper validation activities and right
functions are tested.
- QA and business project owner will sign off for software validation package
- Both IT or business unit may own the software validation/instrument
qualification.
- Instrument Qualification is not optional
- Many good sources for an approach
- Categorization is essential
- Very difficult to separate software from
hardware testing with complex systems
- It is not necessary to over-test
- Risk-based approach
- Test what you will use
- AIQ is more than just IQ/OQ/PQ.
Summary
25 ¡
Audit ¡Trail ¡– ¡Record ¡of ¡events ¡that ¡occur ¡during ¡the ¡use ¡of ¡a ¡system ¡that ¡should ¡include ¡the ¡9me, ¡date, ¡user ¡ iden9fica9on, ¡what ¡occurred ¡and ¡the ¡reason. ¡ ¡Also ¡known ¡as ¡Log ¡Files ¡or ¡Trace ¡Files. ¡ Calibra'on ¡– ¡Periodic ¡seeng ¡of ¡instrument ¡parameters ¡that ¡allow ¡instrument ¡to ¡func9on ¡as ¡intended. ¡ Change ¡Control ¡– ¡Documenta9on ¡of ¡any ¡change ¡to ¡the ¡system ¡aLer ¡the ¡original ¡installa9on. ¡ ¡The ¡Change ¡Control ¡ documenta9on ¡will ¡require ¡IQ ¡and ¡OQ ¡to ¡show ¡that ¡the ¡change ¡is ¡working ¡as ¡expected, ¡with ¡the ¡excep9on ¡of ¡a ¡ Configura9on ¡Only ¡Change ¡Control. ¡ Configura'on ¡Management ¡-‑ ¡Documenta9on ¡of ¡the ¡setup ¡of ¡the ¡system ¡for ¡use. ¡ ¡This ¡includes ¡user ¡roles, ¡privileges ¡ and ¡groups ¡as ¡well ¡as ¡audit ¡trail ¡and ¡electronic ¡signature ¡setup ¡if ¡applicable ¡to ¡the ¡system. ¡ Configura'on ¡Only ¡Change ¡Control ¡– ¡Documents ¡seeng ¡changes ¡in ¡the ¡system ¡soLware. ¡ ¡Only ¡OQ ¡documenta9on ¡ is ¡required ¡in ¡addi9on ¡to ¡the ¡Configura9on ¡Only ¡Change ¡Control, ¡as ¡an ¡installa9on ¡is ¡not ¡performed. ¡ Decommissioning ¡– ¡Removing ¡a ¡system ¡from ¡ac9ve ¡use. ¡ Installa'on ¡Qualifica'on ¡(IQ) ¡-‑ ¡The ¡IQ ¡is ¡comprised ¡of ¡documenta9on ¡that ¡demonstrates ¡that ¡the ¡system ¡is ¡ installed ¡properly. ¡ ¡The ¡extent ¡of ¡the ¡IQ ¡documenta9on ¡depends ¡on ¡the ¡type ¡and ¡complexity ¡of ¡the ¡system ¡
- installa9on. ¡ ¡The ¡IQ ¡is ¡performed ¡for ¡every ¡instrument ¡installa9on. ¡
Interface ¡– ¡A ¡connec9on ¡that ¡allows ¡communica9on ¡between ¡the ¡soLware/computer ¡and ¡the ¡instrument. ¡ Opera'onal ¡Qualifica'on ¡(OQ) ¡-‑ ¡The ¡OQ ¡is ¡comprised ¡of ¡documenta9on ¡that ¡demonstrates ¡that ¡the ¡system ¡is ¡
- pera9onal ¡in ¡its ¡installed ¡environment. ¡ ¡The ¡OQ ¡is ¡performed ¡for ¡every ¡instrument ¡installa9on. ¡
Performance ¡Qualifica'on ¡(PQ) ¡-‑ ¡The ¡PQ ¡is ¡comprised ¡of ¡documenta9on ¡that ¡demonstrates ¡that ¡the ¡system ¡ performs ¡the ¡func9ons ¡that ¡the ¡users ¡need ¡it ¡to ¡do ¡and ¡is ¡performed ¡only ¡once ¡per ¡version ¡of ¡the ¡soLware ¡used. ¡ ¡ Also ¡referred ¡to ¡as ¡soLware ¡or ¡system ¡valida9on. ¡ Remedial ¡Maintenance ¡– ¡Procedures ¡performed ¡on ¡a ¡system ¡to ¡correct ¡an ¡error ¡or ¡issue ¡with ¡that ¡system. ¡
Glossary 1 of 2
26 ¡
Risk ¡Assessment ¡– ¡Procedure ¡used ¡to ¡determine ¡the ¡cri9cality ¡of ¡an ¡instrument, ¡which ¡in ¡turn ¡determines ¡ whether ¡PQ ¡is ¡required. ¡ Rou'ne ¡Maintenance ¡– ¡Periodic ¡procedures ¡performed ¡on ¡a ¡system ¡to ¡ensure ¡that ¡the ¡system ¡con9nues ¡to ¡ perform ¡as ¡expected. ¡ ¡Includes ¡preventa9ve ¡maintenance ¡(PM), ¡verifica9on ¡and ¡calibra9on. ¡ ¡ ¡ Script ¡-‑ ¡The ¡program ¡used ¡on ¡the ¡instrument ¡to ¡perform ¡the ¡needed ¡func9ons. ¡ ¡Can ¡be ¡a ¡General ¡Script ¡that ¡is ¡ used ¡for ¡more ¡than ¡one ¡assay ¡(example: ¡ ¡Quality ¡Control ¡prepara9on) ¡or ¡an ¡Assay ¡Script ¡that ¡is ¡used ¡as ¡part ¡of ¡a ¡ specific ¡analy9cal ¡method ¡for ¡analysis. ¡ Standard ¡Opera'ng ¡Procedure ¡(SOP) ¡– ¡Document ¡that ¡describes ¡use ¡of ¡the ¡system ¡and ¡will ¡include ¡safety ¡
- concerns. ¡ ¡An ¡SOP ¡may ¡also ¡include ¡decommission ¡informa9on. ¡
Test ¡Incident ¡Log ¡– ¡Document ¡that ¡lists ¡any ¡unexpected ¡events ¡that ¡occurred ¡during ¡the ¡PQ ¡and ¡how ¡they ¡were ¡
- resolved. ¡
Test ¡Worksheet ¡– ¡Document ¡that ¡describes ¡the ¡purpose, ¡procedure ¡and ¡expected ¡results ¡of ¡a ¡PQ ¡test. ¡ Traceability ¡Matrix ¡– ¡Charts ¡each ¡user ¡requirement ¡with ¡the ¡test ¡worksheets ¡that ¡test ¡them. ¡ User ¡Requirements ¡– ¡Document ¡that ¡defines ¡what ¡func9ons ¡will ¡be ¡used ¡and ¡tested ¡as ¡part ¡of ¡PQ. ¡ Valida'on ¡– ¡The ¡process ¡of ¡evalua9ng ¡a ¡system, ¡instrument, ¡assay ¡or ¡script ¡to ¡provide ¡a ¡high ¡level ¡of ¡assurance ¡ that ¡they ¡will ¡perform ¡accurately ¡and ¡consistently ¡in ¡accordance ¡with ¡intended ¡user ¡expecta9ons. ¡ Valida'on ¡Plan ¡– ¡Document ¡that ¡describes ¡the ¡system ¡and ¡how ¡the ¡system ¡will ¡be ¡tested. ¡ Valida'on ¡Summary ¡– ¡Document ¡that ¡includes ¡test ¡results ¡and ¡statement ¡that ¡the ¡system ¡is ¡ready ¡for ¡use. ¡ Verifica'on ¡– ¡Periodic ¡checking ¡of ¡calibra9on ¡parameters ¡to ¡demonstrate ¡that ¡the ¡instrument ¡is ¡s9ll ¡func9oning ¡ as ¡needed. ¡