Analytical Instrument Qualification Team A9

Chad ¡Briscoe, ¡Hidehisa ¡Tachiki, ¡Jianing ¡Zeng, ¡

Manish ¡Yadav, ¡Ka9a ¡Pastre, ¡Petra ¡Struwe, ¡Ron ¡ Shoup, ¡ScoA ¡Davis, ¡Michael ¡Blackburn, ¡Ping ¡Du

slide-2
SLIDE 2

2 ¡

  • Many regulations that are implicitly applicable
  • Few regulations that are explicitly applicable
  • Not clear which regulations apply, must pick and choose pieces

from many sources

  • Not included in most (any) guidance documents for regulated Bio

(eg. FDA, EMA)

  • Easy to overdo it (go GMP). Pharma needs to reduce overhead
  • Easy to underdo it. Due to lack of time and/or resources
  • Opinions inside companies vary as much (or more?) between

different departments in the same company than between the same departments between different companies.

Why AIQ in GBC?

Ops QA IT

slide-3
SLIDE 3

3 ¡

GLP

  • Swiss AGIT
  • OECD Application of GLP

to Computerised Systems GMP

  • USP <1058>
  • GAMP5
  • FDA 21CFR Part 11
  • EMA Annex 11
  • FDA Med Device

Guidance

Some of the Regs to Consider

Clinical

  • FDA Guidance Comp

Systems in Clinical Investigations

  • Japanese Guideline for

Electromagnetic Records in Applications for Pharmaceuticals Engineering

  • NIST Risk Mgmt Guide

for IT systems

slide-4
SLIDE 4

4 ¡

Keep it in perspective

In ¡Scope ¡

  • Equipment ¡SoLware ¡Valida9on ¡
  • Change ¡control/Rou9ne ¡requalifica9on ¡
  • Instruments/Equipment ¡
  • System ¡Suitability ¡(overview) ¡
  • Holis9c ¡Approach ¡
  • Regulatory/Audits ¡
  • Role ¡of ¡the ¡Laboratory ¡and ¡IT ¡in ¡Lab ¡SoLware ¡Valida9on ¡

¡ Out ¡of ¡Scope ¡

  • IT ¡Infrastructure ¡Qualifica9on ¡
  • Design ¡Qualifica9on ¡
  • Stand-­‑alone/non-­‑instrument ¡controlling ¡soLware: ¡spreadsheets, ¡

homegrown, ¡COTS ¡

  • LIMS, ¡ELN ¡where ¡not ¡interfacing ¡with ¡instruments ¡
slide-5
SLIDE 5

5 ¡

  • AIQ is a globally recognized, required activity
  • Most regulated labs do some form of AIQ
  • Who does which activities varies greatly
  • Terminology is not harmonized
  • Amount of effort in companies varies greatly
  • Effort should always involve: Operations, IT, QA and

Vendors

Current Situation

slide-6
SLIDE 6
  • IQOQPQ
  • Traditional approach still valid
  • Software validation in AIQ process
  • Requalification (RQ?)
  • Audits – Part 11, other regs?
  • Defining the roles of Operations, QA and IT in

the process

Overview

slide-7
SLIDE 7

IQ OQ PQ

At least we’re not validating that!

slide-8
SLIDE 8

IQ OQ PQ in one slide!

User ¡Requirement ¡ Specifica9ons ¡ Func9onal ¡ Specifica9ons ¡ Opera9onal ¡ Qualifica9on ¡ Design ¡ Specifica9on ¡ Design ¡ Qualifica9on ¡ Installa9on ¡ Qualifica9on ¡ Performance ¡ Qualifica9on ¡ Process Flow Reference

slide-9
SLIDE 9

Installa'on ¡Qualifica'on ¡(IQ) ¡-­‑ ¡The ¡IQ ¡is ¡comprised ¡of ¡ documenta9on ¡that ¡demonstrates ¡that ¡the ¡system ¡is ¡installed ¡

  • properly. ¡ ¡

¡ Opera'onal ¡Qualifica'on ¡(OQ) ¡-­‑ ¡The ¡OQ ¡is ¡comprised ¡of ¡ documenta9on ¡that ¡demonstrates ¡that ¡the ¡system ¡is ¡opera9onal ¡ in ¡its ¡installed ¡environment. ¡ ¡ Performed ¡by ¡manufacturer ¡ Signed ¡off ¡by ¡ ¡owner

IQ and OQ

slide-10
SLIDE 10

10 ¡

  • The PQ is comprised of documentation that demonstrates that

the system performs the functions that the users need it to.

  • PQ phase verifies integrity of installation at site, including

network access, security, configuration tests; PQ also includes customer-specified tests that may be more relevant to the site, such as the execution of a trusted method.

  • Aspects of PQ can be holistic. eg. you might need the MS to

test the HPLC acquisition.

  • Design scripts specific to the environment you are working in.
  • Core validation run with curve, QCs.
  • To verify carryover, sensitivity, device communication, other instrument

performance parameters.

Performance Qualification

slide-11
SLIDE 11

11 ¡

First Instrument

  • Full IQ/OQ/PQ
  • Software validation
  • IT Environment set up

and check

  • Functionality with anti-virus,

etc.

  • Network, folder security
  • Write SOPs
  • Establish maintenance

schedules

Multiple Instruments?

Replicate Instrument (2nd, 3rd, etc) of same type.

  • Same IQ/OQ
  • Replicate IT settings
  • Minimal or no PQ
  • Review SOP
  • Implement same PM
slide-12
SLIDE 12

12 ¡

Categorization

Ø For each item of incoming equipment, user/lab manager to select equipment category and document selection rationale according to local regs, then qualify according to category. Ø Which categorization approach?

  • GAMP 5
  • USP 1058 (adapted from Bansal, et al white paper)
  • Very simple

– Tools, instruments

– Metrology tools – reference weights, check plates (binding assays)

Ø Categories are based on complexity, configurability, and criticality.

slide-13
SLIDE 13

13 ¡

  • Owner should review draft OQ carefully, remove those test scripts that

simply generate busywork for vendor or CRO, and add scripts that test holistic performance.

  • Requirements not for what you buy but what you must test.
  • Use requirements to build traceability matrix
  • Consider qualification of metrology tools
  • Vendor should provide the specifications and any expiration dating for these
  • materials. From time to time, these standards will need to be re-verified.
  • Calibration standards provide traceable “standard of truth” to verify or recalibrate

instruments to acceptable performance.

Random thoughts…

slide-14
SLIDE 14

14 ¡

Vendor Risk Analysis

  • 3rd party installer’s qualified
  • Safety Procedures
  • ISO Certificate
  • Reputation

Approaches

  • Teleconference
  • Questionnaire
  • May audit on-site for major

equipment If vendor process is good, it can minimize your work.

Procurement Process

  • Vendor work only isn’t
  • enough. Must test in your

environment for your specific use.

  • General testing
  • Assay specific testing
slide-15
SLIDE 15

q For most complex instruments, software can’t be validated separately from the instrument qualification.

q Complete computerized system validation.

q What reg’s apply to electronic data?

q FDA’s 21 CFR Part 11 recognized as a global “standard” for electronic data but can’t forget other regs that are emerging q EMA Annex 11, GAMP5, many others?

q Is there value in executing standard test scripts? Probably not. Only tests aspects that can change in your installation. q It is more value added to focus on how the instrument works in your

  • peration with the software.

q Validation of configured portions of the software only. q Instrument parameters established by the software are not validatable by end user. Example: MS source temperature, MS voltages, robotic movement details. q COTS code review is not necessary

Comments on Equipment Control Software Validation

slide-16
SLIDE 16

Routine Maintenance System Suitability Requalification (RQ) Audits

After the IQOQPQ Process

slide-17
SLIDE 17
  • Establish during or following qualification
  • Define the process
  • SOP, Work Instruction, refer to Manual
  • Calibration Process
  • Who to call for repair
  • Archive your service contract
  • Build a schedule and document it somewhere

so its not forgotten

  • Give it to QA, they’ll make sure you do it.

Routine Maintenance

slide-18
SLIDE 18

18 ¡

Ø Establish process BEFORE release Ø Must have predefined process Ø Repair Categories

  • Move of instrument
  • Upgrade
  • Broken
  • Routine Maintenance

Ø Requalification is what you must do before restarting the batch Ø Often includes some elements of IQ/OQ/PQ

Requalification (RQ)

slide-19
SLIDE 19

19 ¡

  • Qualification of all components of

an entire system at once.

  • Useful approach in many
  • ccasions
  • Repaired systems can be re-qualified

holistically using a reference method.

  • Often part of PQ and RQ
  • System Suitability is a common

example of holistic qualification.

Holistic Qualification

slide-20
SLIDE 20

20 ¡

Why?

  • In GLP is usually assay specific.
  • Ensure instruments and equipment are prepared for run.
  • In regulated bioanalysis system suitability is the assay specific

part of the qualification process.

  • Performed at regular intervals but not always for every batch

Chromatographic Assays

  • A few injections before, during and/or after a run

Binding Assays, Plate Format

  • Qualification plate specific to your assay type

Details

  • Specific details within other teams

Where Does System Suitability Fit In?

slide-21
SLIDE 21

21 ¡

Ø Lack of consistency

Ø Regulators often don’t have consistent audit practices, some better than others Ø May get very little notice of FDA audits so must be prepared on the IT side. Other agencies generally give more notice. Ø Companies in transition

Ø Expectation for GMP testing and documentation

Ø GMP is often not necessary or appropriate.

Ø Audits often focus more on process and documentation, not details of tests

Ø Spend extra time on documentation and ensure thorough review. Ø Keep complete and reproducible audit trails Ø Written procedures in place. Follow your procedures.

Ø Printed versus electronic records:

Ø What is the definition of the raw data? Sometimes more important is what is your companies definition. Ø All of the data throughout the process is the raw data, not just the finalized data. Ø Are printed versions of electronic records required?

Regulations and Audit Preparation

slide-22
SLIDE 22

22 ¡

IT – LAB specialist and QA

  • Develop Requirements
  • Manage Documentation
  • Maintain Validated State throughout Lifecycle
  • Change control
  • Archival and retirement
  • Software IQ/OQ and configuration
  • Help Users in Acceptance testing, manage issue resolution
  • Interpret and communicate regulations
  • Perform Periodic Reviews

Vendor

  • Provide system/software installation.
  • Some vendor will conduct IQ and OQ to release the equipment to

business unit.

  • Ensure they follow their processes and use qualified 3rd parties.
  • Obtain approval from system owner before conducting their testing.

Roles and Responsibilities 1 of 2

slide-23
SLIDE 23

23 ¡

Roles and Responsibilities 2 of 2

Lab

  • Identify System Owner
  • System/operational requirements
  • Ensure proper level of validation and deliverables based risk-based

assessment.

  • Work with IT to generate user acceptance tests scripts.
  • Conduct user acceptance tests.
  • Prepare related SOP before system release to production.
  • Ensure that the validation status is maintained throughout the lifecycle of

the computerized system.

  • Conduct instrument PQ
  • Ensure proper training for users.
  • Document calibration, maintenance, upgrades and services.
  • Manage change control.

General Consensus

  • Business unit is the leader to ensure proper validation activities and right

functions are tested.

  • QA and business project owner will sign off for software validation package
  • Both IT or business unit may own the software validation/instrument

qualification.

slide-24
SLIDE 24
  • Instrument Qualification is not optional
  • Many good sources for an approach
  • Categorization is essential
  • Very difficult to separate software from

hardware testing with complex systems

  • It is not necessary to over-test
  • Risk-based approach
  • Test what you will use
  • AIQ is more than just IQ/OQ/PQ.

Summary

slide-25
SLIDE 25

25 ¡

Audit ¡Trail ¡– ¡Record ¡of ¡events ¡that ¡occur ¡during ¡the ¡use ¡of ¡a ¡system ¡that ¡should ¡include ¡the ¡9me, ¡date, ¡user ¡ iden9fica9on, ¡what ¡occurred ¡and ¡the ¡reason. ¡ ¡Also ¡known ¡as ¡Log ¡Files ¡or ¡Trace ¡Files. ¡ Calibra'on ¡– ¡Periodic ¡seeng ¡of ¡instrument ¡parameters ¡that ¡allow ¡instrument ¡to ¡func9on ¡as ¡intended. ¡ Change ¡Control ¡– ¡Documenta9on ¡of ¡any ¡change ¡to ¡the ¡system ¡aLer ¡the ¡original ¡installa9on. ¡ ¡The ¡Change ¡Control ¡ documenta9on ¡will ¡require ¡IQ ¡and ¡OQ ¡to ¡show ¡that ¡the ¡change ¡is ¡working ¡as ¡expected, ¡with ¡the ¡excep9on ¡of ¡a ¡ Configura9on ¡Only ¡Change ¡Control. ¡ Configura'on ¡Management ¡-­‑ ¡Documenta9on ¡of ¡the ¡setup ¡of ¡the ¡system ¡for ¡use. ¡ ¡This ¡includes ¡user ¡roles, ¡privileges ¡ and ¡groups ¡as ¡well ¡as ¡audit ¡trail ¡and ¡electronic ¡signature ¡setup ¡if ¡applicable ¡to ¡the ¡system. ¡ Configura'on ¡Only ¡Change ¡Control ¡– ¡Documents ¡seeng ¡changes ¡in ¡the ¡system ¡soLware. ¡ ¡Only ¡OQ ¡documenta9on ¡ is ¡required ¡in ¡addi9on ¡to ¡the ¡Configura9on ¡Only ¡Change ¡Control, ¡as ¡an ¡installa9on ¡is ¡not ¡performed. ¡ Decommissioning ¡– ¡Removing ¡a ¡system ¡from ¡ac9ve ¡use. ¡ Installa'on ¡Qualifica'on ¡(IQ) ¡-­‑ ¡The ¡IQ ¡is ¡comprised ¡of ¡documenta9on ¡that ¡demonstrates ¡that ¡the ¡system ¡is ¡ installed ¡properly. ¡ ¡The ¡extent ¡of ¡the ¡IQ ¡documenta9on ¡depends ¡on ¡the ¡type ¡and ¡complexity ¡of ¡the ¡system ¡

  • installa9on. ¡ ¡The ¡IQ ¡is ¡performed ¡for ¡every ¡instrument ¡installa9on. ¡

Interface ¡– ¡A ¡connec9on ¡that ¡allows ¡communica9on ¡between ¡the ¡soLware/computer ¡and ¡the ¡instrument. ¡ Opera'onal ¡Qualifica'on ¡(OQ) ¡-­‑ ¡The ¡OQ ¡is ¡comprised ¡of ¡documenta9on ¡that ¡demonstrates ¡that ¡the ¡system ¡is ¡

  • pera9onal ¡in ¡its ¡installed ¡environment. ¡ ¡The ¡OQ ¡is ¡performed ¡for ¡every ¡instrument ¡installa9on. ¡

Performance ¡Qualifica'on ¡(PQ) ¡-­‑ ¡The ¡PQ ¡is ¡comprised ¡of ¡documenta9on ¡that ¡demonstrates ¡that ¡the ¡system ¡ performs ¡the ¡func9ons ¡that ¡the ¡users ¡need ¡it ¡to ¡do ¡and ¡is ¡performed ¡only ¡once ¡per ¡version ¡of ¡the ¡soLware ¡used. ¡ ¡ Also ¡referred ¡to ¡as ¡soLware ¡or ¡system ¡valida9on. ¡ Remedial ¡Maintenance ¡– ¡Procedures ¡performed ¡on ¡a ¡system ¡to ¡correct ¡an ¡error ¡or ¡issue ¡with ¡that ¡system. ¡

Glossary 1 of 2

slide-26
SLIDE 26

26 ¡

Risk ¡Assessment ¡– ¡Procedure ¡used ¡to ¡determine ¡the ¡cri9cality ¡of ¡an ¡instrument, ¡which ¡in ¡turn ¡determines ¡ whether ¡PQ ¡is ¡required. ¡ Rou'ne ¡Maintenance ¡– ¡Periodic ¡procedures ¡performed ¡on ¡a ¡system ¡to ¡ensure ¡that ¡the ¡system ¡con9nues ¡to ¡ perform ¡as ¡expected. ¡ ¡Includes ¡preventa9ve ¡maintenance ¡(PM), ¡verifica9on ¡and ¡calibra9on. ¡ ¡ ¡ Script ¡-­‑ ¡The ¡program ¡used ¡on ¡the ¡instrument ¡to ¡perform ¡the ¡needed ¡func9ons. ¡ ¡Can ¡be ¡a ¡General ¡Script ¡that ¡is ¡ used ¡for ¡more ¡than ¡one ¡assay ¡(example: ¡ ¡Quality ¡Control ¡prepara9on) ¡or ¡an ¡Assay ¡Script ¡that ¡is ¡used ¡as ¡part ¡of ¡a ¡ specific ¡analy9cal ¡method ¡for ¡analysis. ¡ Standard ¡Opera'ng ¡Procedure ¡(SOP) ¡– ¡Document ¡that ¡describes ¡use ¡of ¡the ¡system ¡and ¡will ¡include ¡safety ¡

  • concerns. ¡ ¡An ¡SOP ¡may ¡also ¡include ¡decommission ¡informa9on. ¡

Test ¡Incident ¡Log ¡– ¡Document ¡that ¡lists ¡any ¡unexpected ¡events ¡that ¡occurred ¡during ¡the ¡PQ ¡and ¡how ¡they ¡were ¡

  • resolved. ¡

Test ¡Worksheet ¡– ¡Document ¡that ¡describes ¡the ¡purpose, ¡procedure ¡and ¡expected ¡results ¡of ¡a ¡PQ ¡test. ¡ Traceability ¡Matrix ¡– ¡Charts ¡each ¡user ¡requirement ¡with ¡the ¡test ¡worksheets ¡that ¡test ¡them. ¡ User ¡Requirements ¡– ¡Document ¡that ¡defines ¡what ¡func9ons ¡will ¡be ¡used ¡and ¡tested ¡as ¡part ¡of ¡PQ. ¡ Valida'on ¡– ¡The ¡process ¡of ¡evalua9ng ¡a ¡system, ¡instrument, ¡assay ¡or ¡script ¡to ¡provide ¡a ¡high ¡level ¡of ¡assurance ¡ that ¡they ¡will ¡perform ¡accurately ¡and ¡consistently ¡in ¡accordance ¡with ¡intended ¡user ¡expecta9ons. ¡ Valida'on ¡Plan ¡– ¡Document ¡that ¡describes ¡the ¡system ¡and ¡how ¡the ¡system ¡will ¡be ¡tested. ¡ Valida'on ¡Summary ¡– ¡Document ¡that ¡includes ¡test ¡results ¡and ¡statement ¡that ¡the ¡system ¡is ¡ready ¡for ¡use. ¡ Verifica'on ¡– ¡Periodic ¡checking ¡of ¡calibra9on ¡parameters ¡to ¡demonstrate ¡that ¡the ¡instrument ¡is ¡s9ll ¡func9oning ¡ as ¡needed. ¡

Glossary 2 of 2