Status and Progress in PIMMS-Family Machines M. Pullia on behalf - - PowerPoint PPT Presentation

status and progress in pimms family machines
SMART_READER_LITE
LIVE PREVIEW

Status and Progress in PIMMS-Family Machines M. Pullia on behalf - - PowerPoint PPT Presentation

Status and Progress in PIMMS-Family Machines M. Pullia on behalf of CNAO and MedAustron accelerator groups Slow extraction workshop 2019 Fermilab July 22-24, 2019 www.cnao.it PIMMS Study hosted at CERN, 1995-1999 The Proton-Ion


slide-1
SLIDE 1

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

  • M. Pullia
  • n behalf of CNAO and MedAustron accelerator groups

Status and Progress in PIMMS-Family Machines

slide-2
SLIDE 2

Page  2

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

PIMMS

  • Study hosted at CERN, 1995-1999
  • The Proton-Ion Medical Machine Study (PIMMS) was set up

following an agreement between Med-AUSTRON (Austria) and the TERA Foundation (Italy) to join their resources in the design of a medical synchrotron that could later be adapted to individual national needs. CERN agreed to host this collaboration inside its PS Division and to contribute to the

  • study. The group has worked in collaboration with GSI

(Germany) and was later joined by Onkologie 2000 (Czech Republic).

  • Designed keeping in mind that the facility would be operated in

a hospital environment

slide-3
SLIDE 3

Page  3

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Active systems

0.2 0.4 0.6 0.8 1 1.2 2 4 6 8 10 12 14 16

Depth [cm] D

  • s

e [ r e l a t i v e u n i t s ]

slide-4
SLIDE 4

Page  4

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

CNAO and MedAustron

Treatments started in 2011 and 2017 respectively

slide-5
SLIDE 5

Page  5

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

CNAO and MedAustron: 2 implementations of PIMMS

slide-6
SLIDE 6

Page  6

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Sources

2 (3) Supernanogan ECR sources for fast particle change and stable Operation C4+ or H3

+ 8 keV/u

slide-7
SLIDE 7

Page  7

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

LINAC

Same RFQ+LINAC (GSI design) 400 keV/u RFQ 7 MeV/u LINAC

slide-8
SLIDE 8

Page  8

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Synchrotron

Same Synchrotron design (PIMMS) 60 -250 MeV protons 120-400 MeV/u carbon ions

slide-9
SLIDE 9

Page  9

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

HEBT

Different HEBT design Compact vs modular

slide-10
SLIDE 10

RF cavity Betatron Resonance sextupole D = D’ = 0 D = D’ ≠ 0

p inj p – 60 MeV p – 250 MeV C6+ inj C6+ – 120 MeV C6+- 400 MeV B(T m) 0.4 1.1 2.4 0.8 3.3 6.4

2 Superperiods 2 Closed dispersion bumps 1 Dipole Family 3 Quadrupole Families 3 Sextupole Families

slide-11
SLIDE 11

Page  11

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Treatment execution

Sync Extraction magnets Injection magnets 1 s Extracted beam 2-3 min

slide-12
SLIDE 12

Page  12

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Extraction setup at CNAO

slide-13
SLIDE 13

Page  13

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Hardt condition

slide-14
SLIDE 14

Page  14

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Betatron extraction

slide-15
SLIDE 15

Page  15

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Head and tail of extraction

p/p Amplitude (b)

Head Tail

slide-16
SLIDE 16

Page  16

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Momentum distribution driven into resonance by Betatron core

∑. En:62.4 MeV, 1st Harm histogram dp/p Schottky monitor Vert.

  • A. De Franco,
  • A. Goetz
slide-17
SLIDE 17

Page  17

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Beam shaping with Schottky PU RF-KO with Schottky Pick-up Air core quadrupole Empty bucket channelling Betatron core Additional quad winding

Extraction features at CNAO

RF-KO with new exciter

slide-18
SLIDE 18

Page  18

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Betatron core  = 2.46 Wb Sensitivity to gap between halves Magnetic screen needed

slide-19
SLIDE 19

Page  19

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Empty bucket channelling

slide-20
SLIDE 20

Page  20

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Empty bucket

Amplitude

PHASE

Resonance region Resonance line for low betatron amplitudes Resonance line for high betatron amplitudes Sense of stack acceleration E

slide-21
SLIDE 21

Page  21

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

RF-Channeling spill smoothening

Spill time structure (50kHz)

En:62.4 MeV - Frev: 1.33 MHz. ∆Fch:15kHz – 1500V Negligible losses

  • A. De Franco,
  • C. Schmitzer

With RF channeling Change Spot Sizes!!!  Re-commissioning

2 4 6 8 10 12 14 16 18 20 2 4 6 8 10 12

Max Peak to Mean in a Spill Averaging time (ms)

Max Peak to Mean in a Spill

RF-Channeling Reference

Same scale

slide-22
SLIDE 22

Page  22

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Empty Bucket results

Carbon ions Protons

0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 50 100 150 200 250 300

Rms duty factor

With Empty Bucket Without Empty Bucket 10 20 30 40 50 50 100 150 200 250 300

Max / average

With Empty Bucket Without Empty Bucket 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 50 100 150 200 250 300 350

Rms duty factor

Without Empty Bucket Empty Bucket 10 20 30 40 50 60 50 100 150 200 250 300 350

Max / average

Without Empty Bucket Empty Bucket

Courtesy of L. Falbo

slide-23
SLIDE 23

Page  23

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Air core quadrupole

slide-24
SLIDE 24

Page  24

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Air core quad feed forward

slide-25
SLIDE 25

Page  25

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Automatic feed forward

Feed forward correction requires repeatability, which was the case in the medium term (one day), but the correction parameters could vary over longer time (week). In the days following the air core quad feed forward MD,

  • R. Cappi set up a system performing FFT and applying the

correction at the following spill.

slide-26
SLIDE 26

Page  26

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

High Frequency Ripple Injection

Feed forward does not work at CNAO, not even on the very short time scale (1 second). We needed an alternative. Ripple with betatron off. Brushing against the resonance Ripple with betatron on. Irregular spill with strong modulation

slide-27
SLIDE 27

Page  27

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

High Frquency Ripple Injection

Inject a large ripple with a frequency higher than the one you are interested in The amount of extracted beam depends only on the betatron, thus an apparently more homegeneous spill is obtained.

slide-28
SLIDE 28

Page  28

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

High Frquency Ripple Injection

Feed forward does not work at CNAO, not even on the very short time scale (1 second)

slide-29
SLIDE 29

Page  29

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Effect on the beam at isocenter

Off 0.6 0.8 0.95 a.u. excitation

slide-30
SLIDE 30

Page  30

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

RF frequency sweeping HFRI

t f HFRI Period The same effect can be obtained with every means that can bring The beam towards and away from the resonance

slide-31
SLIDE 31

Page  31

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Empty Sweeping Bucket vs Empty Bucket

2 4 6 8 10 12 14 50 100 150 200 250 300

Max / Average

Empty Bucket Empty S‐Bucket

Carbon ions

0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 50 100 150 200 250 300

Rms Duty Factor

Empty Bucket Empty S‐Bucket 1 2 3 4 5 6 7 8 9 10 30 50 70 90 109 129 149 169 189 208 228 248 268 288 308

Max / Average

Empty S-Bucket Empty Bucket

0.5 0.55 0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 30 50 70 90 109 129 149 169 189 208 228 248 268 288 308

Rms Duty Factor

Empty S-Bucket Empty Bucket

Proton ions

Courtesy of L. Falbo

slide-32
SLIDE 32

Page  32

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Air core quad with feedback

Signal from a scintillator (qualification monitor in the HEBT) Feedback start

slide-33
SLIDE 33

Page  33

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Ripple compensation

100 ms No compensation Empty bucket Empty bucket+HFRI Empty bucket + ACQ feedback Integration time 100 us (10 kHz data)

slide-34
SLIDE 34

Page  34

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Different ripple spectra at CNAO and MedAustron

slide-35
SLIDE 35

Page  35

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Carbon & proton ripples

1ms sampling frequency. All shift included (also few Machine Dev.)

  • S. Waid, A. De Franco

Carbon Proton

slide-36
SLIDE 36

Page  36

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Bar of charge

slide-37
SLIDE 37

Page  37

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Bar of charge measurement at MedAustron

Use 8 monitors in the long straight section and match Twiss parameters

slide-38
SLIDE 38

Page  38

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Bar of charge at MedAustron

Twiss parameters at EX-01-000-SFX-A from matching HWHM Ex [p mm mrad] 0.076 Ey [p mm mrad] 6.270 Bx 374.22 By 17.98 ax

  • 203.12

Ay 9.96 Gx 110.25 Gy 5.57 Beam size calculated with matched parameters and beam size measured 62 MeV CalcX MeasX CalcY MeasY EX-01-000-SFX-A 5.33 5.18 10.62 10.63 EX-01-001-SFX-A 0.93 0.87 3.34 3.37 EX-01-002-SFX-A 2.16 2.26 8.05 8.05 EX-01-003-SFX-A 3.40 3.30 3.21 3.14 EX-02-000-SFX-A 4.00 3.78 5.71 5.94 EX-02-001-SFX-A 3.16 3.35 3.21 3.27 EX-03-000-SFX-A 5.33 5.58 5.71 5.47

Bar of charge (red) Drawn inside a 5 mm mrad empty ellipse at 8 monitors in the HEBT

slide-39
SLIDE 39

Page  39

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Simulated particle distribution at magnetic septum Particles tracked at first monitor Dispersive region Non dispersive region Courtesy of A. Wastl

slide-40
SLIDE 40

Page  40

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Particles tracked at monitor With measured ellipse and 5 empty ellipse

slide-41
SLIDE 41

Page  41

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Fast turn on/off for the beam Intrinsically safe Allows beam qualification

HEBT Chopper

The chopper stops (and starts) the beam within 200 s. Used for irradiation of separated parts

  • f slices and for synchronization with

breathing.

slide-42
SLIDE 42

Page  42

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Chopped beam

slide-43
SLIDE 43

Page  43

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Intensity modulation

Schoemers et Al, NIM A 795 (2015) 92-99

The number of required particles varies a lot in spots of the same slice. Adapt intensity to spot!

slide-44
SLIDE 44

Page  44

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Intensity modulation

Subdivide slice in classes and re-sort in order to treat spots with increasing intensity.

slide-45
SLIDE 45

Page  45

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

Multi-Energy Extraction

Sync Extraction magnets Injection magnets 1 s Extracted beam Saved time Saved time

slide-46
SLIDE 46

Page  46

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

RFKO kicker in place

slide-47
SLIDE 47

Page  47

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

RFKO installed

Frequency Generator Gate

slide-48
SLIDE 48

Page  48

Slow extraction workshop 2019 – Fermilab July 22-24, 2019

www.cnao.it

RFKO Commissioning started

Bunched RFKO Debunched RFKO VERY preliminary Work just started and low priority, still low extraction efficiency, many aspects still to be understood and implemented… more to come

slide-49
SLIDE 49

Recent news and short future

CNAO

  • Experimental room under

commissioning

  • Single room facility for

protons being acquired

  • Third source for other ions

MedAustron

  • Carbon treatments started
  • Gantry installation coming

soon

  • First rotator
slide-50
SLIDE 50

“Physics is like sex: sure, it may give some practical results, but that's not why we do it. ”

  • R. Feynmann

Thank you for your attention