Vlimant 1 7/05/09 PVT Meeting
Status of Reconstruction in 3.5 and 3.6
- D. Lange, J-R Vlimant
Status of Reconstruction in 3.5 and 3.6 D. Lange, J-R Vlimant - - PowerPoint PPT Presentation
Status of Reconstruction in 3.5 and 3.6 D. Lange, J-R Vlimant 7/05/09 PVT Meeting Vlimant 1 Outline Report on 3.5 cycle Report on 3.6 cycle Suggested plan for next reprocessing 7/05/09 PVT Meeting Vlimant 2 Feature list for
Vlimant 1 7/05/09 PVT Meeting
Vlimant 2 7/05/09 PVT Meeting
Vlimant 3 7/05/09 PVT Meeting
https://twiki.cern.ch/twiki/bin/view/CMS/RecoTagSetDigest35X#Executive_Summary
Vlimant 4 7/05/09 PVT Meeting
https://twiki.cern.ch/twiki/bin/view/CMS/RecoTagSetDigest35X#Executive_Summary
(*) not including the many big-fixes in the listing
Vlimant 5 7/05/09 PVT Meeting
2010 and 2009 data
Using the scaler beam-spot (scaler ~ BeamSpot::type()=LHC) Pixel vertex not using the beam-spot constraint (inconsistent ?) Conservative tracking seeding regions (~40 cm in z) Loose PV reconstruction cuts (1 cm z-separation) Loose photon reconstruction (5 GeV instead of 10 GeV, ...) ➢ Still need completion of validation for high level reconstruction ➢ The two datasets are not as consistent as we would like them to be
Vlimant 6 7/05/09 PVT Meeting
https://twiki.cern.ch/twiki/bin/view/CMS/RecoTagSetDigest36X#Executive_Summary
Vlimant 7 7/05/09 PVT Meeting
https://twiki.cern.ch/twiki/bin/view/CMS/RecoTagSetDigest36X#Executive_Summary
(*) not including the many big-fixes in the listing
➔ Bug-fixes ... ➔ Particle flow back port ➔ Pre-shower back port ➔ Tracking seeding adaptive thresholds ➔ Tracker cluster adaptive thresholds ➔ Use channel status in Ecal unpacking ➔ Updated track-jet algo ➔ ...
Vlimant 8 7/05/09 PVT Meeting
➢ Configuration include Adapted PV loose configuration ✗ Did not succeed: 20% failures. ➢ Memory issues with tracking due to an evolution of the third step
➢ Configuration include tighter photon reconstruction electron reconstruction out-of-the-box Tuning of HF PMT cleaning ✔ Samples exist : 5% failures. ➢ Still memory issue with tracking
Vlimant 9 7/05/09 PVT Meeting
➢ Include Back-plane correction for strip local reconstruction Update SiStrip Lorentz-Angle conditions Updated strip gain conditions (not actually used) ✔ Sample exist ➢ Validated for tracking and Hcal ➢ Known issues with Ecal cleaning
Vlimant 10 7/05/09 PVT Meeting
➢ Include ✔ All addition to 3.6.1(see previous slides) ✔ Validated with previous pre-reprocessing Back-plane correction for strip local reconstruction Update SiStrip Lorentz-Angle conditions ✔ Pre-validated Updated strip gain calibration Updated tracker alignment Updated Ecal calibration ✗ To be pre-validated Updated muon alignment (alignment and APE) ➔ Not enough stat ➔ Would the reprocessing of the muon skim be useful ? ➔ Next valSkim (358patch3) will be enriched in muon Increase threshold on strip cluster ➔ Not easy to check for memory related crash
Vlimant 11 7/05/09 PVT Meeting
➢ Takes ~2 days ✔ Pros: validated by Monday, switching to production next week ✔ Cons: beam-spot payload next week to be validated
➢ Takes ~5 days for 99% of data ➢ Takes a bit more for skims to be made ✔ Pros: get a full dataset with 3.6.1 ✔ Cons: beam-spot payload and conditions to be integrated
Vlimant 12 7/05/09 PVT Meeting