Status of Sustainable Groundwater July 6, 2020 Management Act Implementation Technical Draft Recent Key Accomplishments Hydrogeological Conceptual Model Potential Groundwater Dependent Data Review and Assessment Tech


slide-1
SLIDE 1

Status of Sustainable Groundwater Management Act Implementation

July 6, 2020

slide-2
SLIDE 2

Recent Key Accomplishments

  • Technical
  • Draft

Hydrogeological Conceptual Model

  • Potential

Groundwater Dependent

slide-3
SLIDE 3

Six Month Look Ahead

Data Review and Assessment

  • Tech memos describing data

assessment, data gaps, recommendations for GW monitoring, Sampling and Analysis Plan (late 2020 or early 2021) Hydrogeological Conceptual Model

  • Final updates prepared
  • Future presentations will include 3D

rendering Groundwater Model Update and Readiness

  • Peer review commencement
  • Technical memos prepared
slide-4
SLIDE 4

Six Month Look Ahead

Groundwater Surface Water Interconnection

  • Efforts continue to gain site access

and permissions for equipment installation (piezometers, water level data loggers and temperature probes)

  • In mean time- careful review of

existing data from wells and preparation of a tech memo.

slide-5
SLIDE 5

Six Month Look Ahead

Water Budget Development

  • Historical, current, and future water

budgets will be prepared.

slide-6
SLIDE 6

Six Month Look Ahead

Outreach

  • Completion of Workshop 5 on

Groundwater/Surface Water Interaction

  • Pre workshop meeting of SAC,

Workshop, post workshop meeting, completion of final outreach report

  • Completion of Workshop 6 on

Water Budgets

  • Same meeting steps as above
slide-7
SLIDE 7

Challenges

  • Delays in implementing field work
  • Mitigate by preparation of a specific study of existing

data, and more evaluation with groundwater flowmodel

slide-8
SLIDE 8

Fiscal

  • Scope for GSP Technical Consultant has

broadened- need for additional meetings, inefficiency related to COVID-19 delays, more detailed SAC and Workshop process.

  • SCV-GSA budget includes a 15% contingency

for GSP Technical Consultant ($187,733)

  • Staff evaluating workflow and cost options.
  • Anticipate special Board meeting to consider
  • ptions to authorize use of contingency funds.
slide-9
SLIDE 9

Summary

  • Significant work last quarter.
  • Schedule concern with field work being

mitigated.

  • Next six months including finalization of

technical studies, ongoing robust SAC process and workshops

slide-10
SLIDE 10
  • Questions?
slide-11
SLIDE 11

Essential Consultant Work

  • Representative Work from Each Task for

both GSI Water Solutions Inc. and CV Strategies  Data Review and Assessment  Hydrogeological Conceptual Model  Groundwater Model Update and Readiness  Groundwater Surface Water Interconnection  Water Budget Development  Sustainable Management Criteria  Projects and Management Actions  Preparation of the Groundwater Sustainability Plan