Steering Committee #3 December 11, 2018 AGENDA 1 Project Overview 2 Public Outreach 3 Implementation 4 Next Steps Study Area MAJOR STAKEHOLDERS Sarasota-Bradenton International Airport New College of Florida USF
AGENDA
Project Overview Public Outreach Implementation Next Steps
1 2 3 4
Study Area MAJOR STAKEHOLDERS
- Sarasota-Bradenton
International Airport
- New College of
Florida
- USF Sarasota-
Manatee
- Ringling Museum
- City of Sarasota
- Manatee County
- Sarasota County
Issues and Opportunities
GOALS
Improve Safety and Comfort Improve Access to Destinations along the Corridor Maintain Vehicular Mobility Beautify the Corridor
Alternative
PM
Bicycle Pedestrian Benefit/ Cost Ratio LOS Delay Existing geometry F 277 No change No change Add WB left and right turn lanes E 71 Can improve conditions Can improve conditions 132 Add WB left and right turn lanes and NB right turn lane E 56 Can improve conditions Can improve conditions 119 Two-lane roundabout F 265 Can improve conditions Can improve conditions Partial Median U-turn (MPUT) F 116 No change Can improve conditions 26
UNIVERSITY PARKWAY INTERSECTION ALTERNATIVES – 2040 VOLUMES ANALYSIS
Preliminary Recommendation
Others considered and removed from consideration:
- Displaced Left Turn: due to ROW, bicycle and pedestrian impacts
- Restricted Crossing U-Turn (RCUT): performed worse than PMUT
3 4 2 1 6 5
New signage on northbound & southbound approach Westbound right and left turn lane Northbound right turn lane Add pedestrian crossing on north leg Traffic separator between southbound left and southbound through Improve pedestrian crossing on east leg No turn on red for westbound right
1 2 3 4 5 6
Alternative PM Bicycle Pedestrian LOS Delay
Existing geometry F 80 No change No change WB left/through and exclusive right turn lane F 81 Can improve conditions Can improve conditions Add exclusive WB right turn lane, NB right turn lane and SB left turn lane E 57 Can improve conditions Widens crossing distance Add WB right turn lane and SB left turn lane, remove southbound through lane D 39 Can improve conditions Can improve conditions Add WB right turn lane and SB left turn lane, remove SB through lane; close Ponce De Leon Avenue from US 41 to Tallevast Road D 50 Can improve conditions Can improve conditions Two-lane roundabout F 121 Can improve conditions Can improve conditions Two-lane roundabout with WB right turn bypass lane F 82 Can improve conditions Would require a red phase for the bypass lane
TALLEVAST ROAD INTERSECTION ALTERNATIVES – 2040 VOLUMES ANALYSIS
Preliminary Recommendation
TALLEVAST ROAD
3 4 2 1 5
Add southbound left turn lane Add eastbound receiving lane to Tallevast Road Add westbound right turn lane Close Ponce De Leon Avenue from US 41 to Tallevast Road Buffered bicycle lane alternative presented; wide sidewalk alternative may require right-of-way
1 3 5 4 2
PRELIMINARY INTERSECTION RECOMMENDATIONS
No Build With Turn Lanes
LOS
F D
Average Delay
80 seconds 50 seconds Overall Corridor Travel Time PM Peak Hour Northbound No Build 4 Lane Configuration
2022 5.2 minutes 5.2 minutes 2040 10.2 minutes 8.2 minutes
2040 PM Peak Hour
No Build With Turn Lanes
LOS
B C
Average Delay
14 seconds 25 seconds
No Build With Turn Lanes
LOS
C
Average Delay
21 seconds
No Build With Turn Lanes
LOS
F E
Average Delay
277 seconds 56 seconds
University Parkw ay to Sarasota/Manatee County Line Existing Typical Section
ALTERNATIVE SECTIONS – UNIVERSITY PARKWAY TO EDWARDS AVENUE
45 MPH Design Speed
Sarasota/Manatee County Line to Tallevast Road Existing Typical Section
ALTERNATIVE SECTIONS – EDWARDS AVENUE TO TALLEVAST ROAD
45 MPH Design Speed
www.flickr.com/photos/walterpro
Public Outreach
Public Outreach
- Survey/Web Site
- Posted by county
- HOAs
- Nextdoor
- Direct mailing to
businesses
- Newspaper article
- Campus visit
- HOA presentations
- MPO presentations
772 responses
Survey Dates: September 11, 2018 to December 3, 2018
Survey
- Q1. Home Zip Code
- Q2. What is
your relationship to US 41?
- Q3. Do you
attend New College or USFSM?
23% 39% 12% 12% 14% LIVE AND/OR WORK ALONG US 41 I COMMUTE THROUGH US 41 NONE OF THE ABOVE I live along US 41 I work or study along US 41 I live AND work or study along US 41 5% 87% 8% NEW COLLEGE OR USF NEITHER New College USF Sarasota/Manatee
- Q4. How often
do you travel
- n US 41?
- Q5. What
mode(s) do you use when traveling on US 41? (select all that apply)
64% 27% 7% 1% DAILY AT LEAST ONCE A WEEK AT LEAST ONCE A MONTH AT LEAST ONCE A YEAR 94% 22% 17% 17% 10% 5% 2% DRIVE ALONE BICYCLE WALK CARPOOL TAXI/UBER/LYFT BUS OTHER
- Q6. What issues do you see w hen traveling
along US 41? (select all that apply)
18% 21% 26% 29% 37% 44% 49% 60% 64% QUALITY OF TRANSIT STOPS POOR LIGHTING OTHER (PLEASE SPECIFY) ACCESS TO PROPERTIES ALONG THE CORRIDOR QUALITY OF SIDEWALKS POOR STREETSCAPING / LANDSCAPING QUALITY OF BICYCLE FACILITIES EXCESSIVE VEHICULAR SPEEDING SAFETY/ HIGH CRASH POTENTIAL Mentioned in ‘Other’ Questionable businesses/prostitutes 14 No issues 11 Continuous left-turn lane 9 Left turn out of side streets/ USFSM 9 Poor pedestrian crossings 7 Intersection congestion 5 Poor signage/people not knowing which lane to be in
- Q7. What improvements w ould you support
along US 41? (select all that apply)
17% 21% 28% 32% 32% 40% 41% 41% 42% 43% 57% SAFETY EDUCATION OTHER (PLEASE SPECIFY) IMPROVE TRANSIT STOPS IMPROVE LIGHTING INCREASE LAW ENFORCEMENT WIDER SIDEWALKS ADD CAPACITY AT CONGESTED INTERSECTIONS IMPROVE LANDSCAPING ROADWAY DESIGN CHANGES TO REINFORCE THE POSTED SPEED ADD MEDIANS/ACCESS MANAGEMENT IMPROVE BICYCLE FACILITIES Mentioned in ‘Other’ Add signal at USFSM 24 Roundabout at low volume intersections 13 Add pedestrian crossings/ pedestrian bridge at USFSM entrance 8 Adjust signal timing 7 Leave it alone 6 No Roundabouts 4 Bus pull-offs 2
- Q8. Would you support reducing a travel lane in each
direction along US 41 betw een the Sarasota/Manatee County Line (Edw ards Drive) and Tallevast Road?
28% 39% 33% SUPPORT REDUCING TRAVEL LANE IN EACH DIRECTION NO Yes Yes, if accompanied with congestion relief at University Parkway and Tallevast that would allow for similar or reduced vehicular travel times through the corridor
- Q9. Betw een the Sarasota/Manatee County Line
and Tallevast Road, w hich of the follow ing cross- sections w ould you support? (Select all that apply)
Existing/no-build: 17% 28% 46% 32% 27%
- Q10. Betw een University Parkw ay and the
Sarasota/Manatee County Line, w hich of the follow ing cross-sections w ould you support? (Select all that apply)
Existing/no-build: 18% 16% 26% 44% 39%
Implementation
Programmed Projects
- RRR (FPN: 4446121)
- Limits:
Edwards Drive to Magellan Drive
- Length:
2.081 miles
- Schedule:
2022/2023
- Budget:
$6.736 million
- PD&E (FPN: 4401551)
- Limits:
Edwards Drive to Pearl Avenue
- Length:
1.74 miles
- Schedule:
2021/2022
- Budget:
$800,000
- PD&E (FPN: 4401541)
- Limits:
University Parkway to Edwards Drive
- Length:
0.56 miles
- Schedule:
2021/2022
- Budget:
$800,000
Opportunities?
- Move up timeline for Project Development and Environment (PD&E).
PD&E will:
- Possibly 21/22
- Include additional public engagement
- Provide cost estimates
- Determine cross-sections
- Evaluate environmental impacts
- Determine Phasing
- Construct US 41 and University Parkway intersection improvements
- Possible funds available in 20/21 or 23/24
- Move RRR out one year
- Find ‘goes-with’ funds for RRR
- Include Tallevast Road improvements
- Include median
- No more than $6 million in MPO funds for entire project
- Safety funds
- Others
Project Schedule
- MPO Presentations in January
- Final Report February/March