Summary of preparation for Production II T. Yang (FNAL) ProtoDUNE DRA Meeting Aug 14, 2019 Introduction ProtoDUNE-SP Production II was proposed on Mar 20, 2019 - https://indico.fnal.gov/event/20215/contribution/3/material/slides/0.pdf


slide-1
SLIDE 1

Summary of preparation for Production II

  • T. Yang (FNAL)

ProtoDUNE DRA Meeting Aug 14, 2019

slide-2
SLIDE 2

Introduction

  • ProtoDUNE-SP Production II was proposed on Mar 20, 2019
  • https://indico.fnal.gov/event/20215/contribution/3/material/slides/0.pdf
  • What was available at that time
  • Calibrated beamline information
  • Updated noise mitigation and ADC gain calibration
  • 2D deconvolution
  • New developments since then
  • Updated photon detector simulation
  • T0 reconstruction (Pandora, CRT, anode-piercing tracks)
  • Space charge calibration

8/14/19

  • T. Yang | Production II

2

slide-3
SLIDE 3

Photon detector simulation

  • Main developer: Laura Paulucci,

Alex Himmel

  • Update geometry with ARAPUCA

modules and produce photon library

  • New photon library was done on

July 14

  • v7 geometry with ARAPUCA

modules was finalized on Aug 12.

  • During this development, a bug with

photon detector backtracker was found by SBND and fixed by Jason

  • Stock. This reduced the memory

usage in the simulation.

8/14/19

  • T. Yang | Production II

3

New PD geometry

slide-4
SLIDE 4

Pandora updates

  • Main developer: Steve Green
  • Pandora was updated to include t0

tagging for anode crossing tracks, done on July 17.

  • Thanks to Martin Tzanov for

updating the geometry with the correct active volume on the cryostat size.

  • Pandora MVA vertexing was

trained for test beam particle interactions at ProtoDUNE, done

  • n July 25.

8/14/19

  • T. Yang | Production II

4

slide-5
SLIDE 5

CRT geometry updates

  • Main developer: Martin Tzanov
  • Updated CRT geometry using the survey results.
  • Also other updates: TPC dimensions, active volume size on the

cryostat side.

  • https://indico.fnal.gov/event/21095/contribution/1/material/slides/0.pdf
  • https://indico.fnal.gov/event/21203/contribution/3/material/slides/0.pdf
  • Finalized on July 21.

8/14/19

  • T. Yang | Production II

5

slide-6
SLIDE 6

CRT reconstruction

  • Main developer: Richie Diurba
  • Match CRT information with TPC tracks.
  • First version available on June 26:
  • https://indico.fnal.gov/event/21095/contribution/3/material/slides/0.pdf
  • The code went through several iterations to reduce memory usage for

two CRT matching and improve purity for single CRT matching.

  • Finalized on Aug 13

8/14/19

  • T. Yang | Production II

6

100

  • 80
  • 60
  • 40
  • 20
  • 20

40 60 80 100 x (cm) D 10 20 30 40 50 60 Number of tracks Data, Single CRT, Front 100

  • 80
  • 60
  • 40
  • 20
  • 20

40 60 80 100 x (cm) D 50 100 150 200 250 300 350 Number of tracks

Data, Double CRT, Front

slide-7
SLIDE 7

Anode piercing tracks t0

  • Main developer: Josh Thompson, Leigh Whitehead
  • Port similar algorithm from MicroBooNE to reconstruct t0 for

anode piercing tracks.

  • https://indico.fnal.gov/event/18681/session/13/contribution/158/

material/slides/0.pdf

  • First available on July 23. Finalized on Aug 13 after several

minor bug fixes.

8/14/19

  • T. Yang | Production II

7

  • d a flux of selected tracks of 1.4 per event.

5 10 15 20 25 30 35

Data

4000

  • 3000
  • 2000
  • 1000
  • 1000 2000 3000 4000

s) µ Pandora t0 ( 4000

  • 3000
  • 2000
  • 1000
  • 1000

2000 3000 4000 s) µ Anode Piercing t0 (

Data

slide-8
SLIDE 8

Space charge calibration

  • Main developer: Mike Mooney, Hannah Rogers
  • First version of data driven map available on May 21.
  • Mike made several corrections to the space charge service on

an airplane on July 1.

  • Results looked much improved.
  • Second version of data driven map available on July 3 to

improve the boundary issue.

  • Tianle Liu and Ajib Paudel found a bug in simulation of SCE on

Aug 6, which was fixed by Mike on the same day.

  • Aaron Higuera found an issue in his electron analysis. The was

improved in the third version (latest) of data driven map on Aug 9.

8/14/19

  • T. Yang | Production II

8

slide-9
SLIDE 9

Latest SCE simulation and calibration results

8/14/19

  • T. Yang | Production II

9

MC

1 2 3 4 5 6 7 8 9 10 dE/dx (MeV/cm) Arbitrary Units MC Data dE/dx at the beginning of the shower (median)

1 GeV electrons Cosmic ray muons Ajib Aaron

slide-10
SLIDE 10

Conclusions

  • Huge amount of efforts over the past several months.
  • Achieved a much better understanding of the SCE and

developed many new tools.

  • Many young people have gained a lot of experience with data

analysis in LArTPC and are well prepared for DUNE.

  • Validation, validation, validation…
  • Code included in production needs to be thoroughly tested.
  • Thanks to many people who are always ready to look at new

samples to find problems: Ajib, Heng-Ye, Aaron, Steve, and many

  • thers.
  • Will tag release v08_27_01 for production soon.

8/14/19

  • T. Yang | Production II

10