Summary of preparation for Production II
- T. Yang (FNAL)
Summary of preparation for Production II T. Yang (FNAL) ProtoDUNE - - PowerPoint PPT Presentation
Summary of preparation for Production II T. Yang (FNAL) ProtoDUNE DRA Meeting Aug 14, 2019 Introduction ProtoDUNE-SP Production II was proposed on Mar 20, 2019 - https://indico.fnal.gov/event/20215/contribution/3/material/slides/0.pdf
8/14/19
2
8/14/19
3
New PD geometry
8/14/19
4
8/14/19
5
8/14/19
6
100
40 60 80 100 x (cm) D 10 20 30 40 50 60 Number of tracks Data, Single CRT, Front 100
40 60 80 100 x (cm) D 50 100 150 200 250 300 350 Number of tracks
Data, Double CRT, Front
8/14/19
7
5 10 15 20 25 30 35
Data
4000
s) µ Pandora t0 ( 4000
2000 3000 4000 s) µ Anode Piercing t0 (
Data
8/14/19
8
8/14/19
9
MC
1 2 3 4 5 6 7 8 9 10 dE/dx (MeV/cm) Arbitrary Units MC Data dE/dx at the beginning of the shower (median)
1 GeV electrons Cosmic ray muons Ajib Aaron
8/14/19
10