ue
Technology Integration Enhancing Safety & Productivity
MICHAEL PLACE Unit Manager: Projects
Granny Smith Gold Mine, Western Australia
Technology Integration Enhancing Safety & Productivity MICHAEL - - PowerPoint PPT Presentation
ue Technology Integration Enhancing Safety & Productivity MICHAEL PLACE Unit Manager: Projects Granny Smith Gold Mine, Western Australia Looking Forward Statement Certain statements in this document constitute forward looking statements
ue
MICHAEL PLACE Unit Manager: Projects
Granny Smith Gold Mine, Western Australia
2
Certain statements in this document constitute “forward looking statements” within the meaning of Section 27A of the US Securities Act of 1933 and Section 21E of the US Securities Exchange Act of 1934. In particular, the forward looking statements in this document include among others those relating to the Damang Exploration Target Statement; the Far Southeast Exploration Target Statement; commodity prices; demand for gold and other metals and minerals; interest rate expectations; exploration and production costs; levels of expected production; Gold Fields’ growth pipeline; levels and expected benefits of current and planned capital expenditures; future reserve, resource and other mineralisation levels; and the extent of cost efficiencies and savings to be achieved. Such forward looking statements involve known and unknown risks, uncertainties and other important factors that could cause the actual results, performance or achievements of the company to be materially different from the future results, performance or achievements expressed or implied by such forward looking statements. Such risks, uncertainties and other important factors include among others: economic, business and political conditions in South Africa, Ghana, Australia, Peru and elsewhere; the ability to achieve anticipated efficiencies and other cost savings in connection with past and future acquisitions, exploration and development activities; decreases in the market price of gold and/or copper; hazards associated with underground and surface gold mining; labour disruptions; availability terms and deployment of capital or credit; changes in government regulations, particularly taxation and environmental regulations; and new legislation affecting mining and mineral rights; changes in exchange rates; currency devaluations; the availability and cost of raw and finished materials; the cost of energy and water; inflation and other macro-economic factors, industrial action, temporary stoppages of mines for safety and unplanned maintenance reasons; and the impact of the AIDS and other occupational health risks experienced by Gold Fields’ employees. These forward looking statements speak only as of the date of this document. Gold Fields undertakes no obligation to update publicly or release any revisions to these forward looking statements to reflect events or circumstances after the date of this document or to reflect the occurrence of unanticipated events.
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
3
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
WHY? HOW? WHAT?
4
Large scale underground mine
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
5
WHY do we need to Innovate and Integrate Technology?
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
MINING Intensity ENERGY Intensity CASH Profitability CAPITAL Intensity PEOPLE Intensity Environment Economics Society
HOW do we add Value?
6
Automation & autonomous
Horizon 3 “Future” Horizon 2 “Tomorrow” Horizon 1 “Today”
Data on a integrated platform Increased data from sensors Visualized UG
Upgraded data backbones
integrated
process integration
full value stream
planning & scheduling
centres
mobile equipment
solutions
predictive maintenance
through connected remote sensors
workforce solutions
twin
Modernise & Visualised Integrated & Optimised
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
WHAT ARE WE DOING TO ADD VALUE? The three key focus pillars are: Technology, Culture & Lean
7
Granny Smith - Enhance Health & Safety
RCT Surface Capability; RCT Guidance
Remote Bogging
Auto Dig
2nd Surface Chair; Point to Point Kits
Explosives Emulsion
Production Development
Ties into Live Activity Information: Next Slide
Electric Drive loader Newtrax Proximity Detection 2 High Hazard Job Remote Monitoring Paste Fill Barricades Monitoring
RCT P2P Live RCT P2P Operational
Increase Storage Capability 2nd Rig arrives 3rd Rig arrives
Underground Fibre backbone upgrade
Newtrax “Man down”
RCT Digital Upgrade Multi- Machine Control
Newtrax VMTR Vehicle & Personnel Tracking Newtrax MineHop Network Expansion Newtrax Cap Lamp & MineEvac System
Horizon 1: “Today” Horizon 2: “Tomorrow” Horizon 3: “Future”
HTOA & Remote Trucking Trial Scope ‘Haul Truck Operator Assist’ (HTOA) guidance system
Technology Integration Enhancing Safety & Productivity | Michael Place| 25th October 2018
Newtrax Proximity Detection 1 COMPLETE IN PROGRESS / PLANNED
Legend
8
Task Management System Trial - Mine Control conversion Paste Fill
Granny Smith - Enhance Productivity (Sustain & Grow Cash Margin)
Watering down
water truck
Planning/Schedule
Underground live feed –
tablet trial Citec Primary Fan Control Maestro Primary Fan Monitoring Water Truck Delivery Minnovare Production Optimiser
Newtrax Secondary Vent On Demand LTE 4G Underground Trial LTE 4G Underground Conversion Surface PITRAM Data Centre Upgrade Orica CEBS Blaster 3000 Upgrade Deswik Ops System Development
Deswik Ops System Implementation - Task Management System Scope
Downhole Survey blast hole QAQC UG Power Monitoring Citec fixed plant monitoring (Pumping, Air)
Seismic Sensor Expansion Underground Fibre backbone upgrade Underground live feed –
tablet full deployment RCT Tele-Remote Drilling Trial UG Wireless Access points
Live Activity Information
Improve Stope Recovery Improve Blasting reliability. Scope CEBS Upgrade Increase Resource Recovery Power reduction Reduce spinning reserve
Horizon 1: “Today” Horizon 2: “Tomorrow” Horizon 3: “Future”
Auto Dig
RCT P2P Live RCT P2P Operational RCT Digital Upgrade Multi- Machine Control HTOA & Remote Trucking Trial Scope ‘Haul Truck Operator Assist’ (HTOA) guidance system
RCT Surface Capability; RCT Guidance
Technology Integration Enhancing Safety & Productivity | Michael Place| 25th October 2018
COMPLETE IN PROGRESS / PLANNED
Legend
10
Enhance Safety & Productivity, Sustain & Grow Cash Margin
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
1 3 2
11
Current Digital Backbone Underground
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
Z250 Z60 Z70 Z80 Z90 Z100
WHAT? 24 Core Fibre Backbone & Fibre Switches 1200m HOW? Integration of technology communications from UG to Surface WHY? Lift the lid from underground mining enhancing Safety & Productivity
12
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
LTE Network Underground Proof of Concept planned for late 2018 Seamlessly integrate people & vehicles from above to below ground without losing connection
14
Phase 1 of the Newtrax system at Granny Smith is the Safety System
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
1 3 2
15
16
Lone Worker Safety – Newtrax Enabled Cap Lamps Deployed at Granny Smith in 2018
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
Electronic Display Emergency Warning ID Pairing Electronic Tag Board Know who is in the mine and their location via their Cap Lamp.
17
Evacuation & Rescue – Mine Evacuation (MineEvac) Over Leaky Feeder Deployed at Granny Smith in 2018
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
18
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
Proximity Warning System Deployed in 2018 – Main Heavy Equipment - Phase 1 Planned for 2019 - Remainder Heavy Equipment & Light Vehicles - Phase 2
19
Remote Control Technology Pty Ltd Safety
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
1 3 2
20
Independent Guidance (Point to Point) Tele-remote Bogging (Semi-autonomous loader) Combined with Multi-Machine Control through a digital network
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
Independent Guidance (Point to Point) Multi-Machine Control G-Dash – Real Time Information Surface Operating Room (SOR)
22
Phase 2 – Enhance Productivity, Sustain & Grow Cash Margin
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
1 3 2
23
Vehicle Monitoring Tracking Reports (VMTR) & Mobile Equipment Telemetry (MET) System (ISAAC) Trial Deployed in 2018 – Currently being undertaken Planned for 2019 – Remainder Main Heavy Equipment
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
AMT, Deswik Dashboards
24
Ventilation On Demand (VOD) & Atmospheric Monitoring System (AMS) Planned for 2019
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
Wireless Gas Monitor (AMS) Wireless Node (IN) Wireless Node (OUT) Wireless Node connected to Ethernet Gateway Ethernet Gateway located at comm's hut connected to fibre backbone Wireless I/O Controller connected to Secondary Fan Starter Secondary Fan Secondary Fan Starter Return Air Rise Operating Heavy Equipment Personnel & Light Vehicles
25
Ventilation On Demand (VOD) Cost Saving Example
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
26
Enhance Productivity, Sustain & Grow Cash Margin
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
1 3 2
27
Reduce blast hole deviation, Reduce over-break/under-break and secondary drill and blasts
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
28
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
Performance Comparison Proven to deliver more reliable set up and improved drilling effectiveness
29
At the end of the day, goals are simple: Enhance Safety and Productivity An Innovation and Technology Strategy is Key
Technology Integration Enhancing Safety & Productivity | Michael Place| 31st October 2018
Integrated Technical Services Install IT Backbone Control Rooms Install Data & Comm’s Backbone Real Time Task Mgmt. Systems
Planning Integration
Culture and Front End Loading
Design Architecture
Data Highway
Decision Assistance
Live Data Capture & Monitoring
Operational Technology (OT)
Integrated IT/OT standard with visualisation of the production value stream
Visualise Operation
Lift the lid from underground mining enhancing Safety & Productivity
Va Varian ance Feed edba back