1 1
Successful Implementation & Improved Operation
The Future is Digital But which bus goes where? 1 1 Successful - - PowerPoint PPT Presentation
The Future is Digital But which bus goes where? 1 1 Successful Implementation & Improved Operation Topics Instrumentation Reducing Footprint and Wiring Even Further Smart Discrete Devices Flexibility to Handle Changes
1 1
Successful Implementation & Improved Operation
2 2
Successful Implementation & Improved Operation
Instrumentation
Smart Discrete Devices Flexibility to Handle Changes Reducing Device Count Eliminating the Last Proprietary Protocols Motor controls SIS
3 3
Successful Implementation & Improved Operation
4 4
Successful Implementation & Improved Operation
JB
CONTROLLERS MARSHALLING JB
FTA FTA FTA FTA FTA FTA
& I/O & POWER
5 5
Successful Implementation & Improved Operation
FPS FPS FPS FPS FPS FPS
CONTROLLERS & INTERFACES MARSHALLING & POWER JB JB FIELDBUS
6 6
Successful Implementation & Improved Operation
CONTROLLERS & INTERFACES WITH POWER JB JB FIELDBUS
7 7
Successful Implementation & Improved Operation
8 8
Successful Implementation & Improved Operation
ON/OFF I/O MARSHALLING DO (DC) DI (DC) AO (mA) AI (mA) DO (AC) DI (AC)
FTA FTA FTA FTA FTA FTA
VALVE
9 9
Successful Implementation & Improved Operation
PT TT LT FT
FIELDBUS I/O FF (H1) ON/OFF VALVE FIELDBUS
S
10 10
Successful Implementation & Improved Operation
P T
OPERAT. CONSOLE x F F D O D I FIELDBUS DEVICE MGMT
P T
OPERAT. CONSOLE F F FIELDBUS DEVICE MGMT
S S
HARDWIRED
11 11
Successful Implementation & Improved Operation
12 12
Successful Implementation & Improved Operation
ON/OFF I/O MARSHALLING DO (DC) DI (DC) AO (mA) AI (mA) DO (AC) DI (AC)
FTA FTA FTA FTA FTA FTA
VALVE
13 13
Successful Implementation & Improved Operation
FTA FTA FTA FTA FTA FTA
I/O MARSHALLING DO (DC) DI (DC) AO (mA) AI (mA) DO (AC) DI (AC) CONTROL VALVE
14 14
Successful Implementation & Improved Operation
FTA FTA FTA FTA FTA FTA
I/O MARSHALLING DO (DC) DI (DC) AO (mA) AI (mA) DO (AC) DI (AC) MOTOR OPERATED VALVE (MOV)
15 15
Successful Implementation & Improved Operation
ON/OFF I/O FF (H1) VALVE FIELDBUS
16 16
Successful Implementation & Improved Operation
I/O FF (H1) CONTROL VALVE FIELDBUS
17 17
Successful Implementation & Improved Operation
I/O FF (H1)
MOTOR OPERATED VALVE FIELDBUS
18 18
Successful Implementation & Improved Operation
19 19
Successful Implementation & Improved Operation
JB
20 20
Successful Implementation & Improved Operation
FIELDBUS TMP.XMT TMP.XMT
21 21
Successful Implementation & Improved Operation
22 22
Successful Implementation & Improved Operation
I/O MARSHALLING DI (DC) DO (AC) AI (mA) AO (mA) DI (DC) DO (DC) OPEN COMMAND STOP COMMAND CLOSE COMMAND OPENED FEEDBACK CLOSED FEEDBACK AVAILABLE OVER-TORQUE OVERHEAT TORQUE LOCAL LOW BATTERY POSITION STOPPED RUNNING ELECTRIC
FTA
ACTUATOR
FTA FTA FTA FTA FTA
23 23
Successful Implementation & Improved Operation
I/O MARSHALLING
DI (DC) DO (AC) AI (mA) AO (mA) DI (DC) DO (DC)
FTA FTA FTA FTA FTA FTA
M ELECTRIC ACTUATOR
I/O
FF-H1
M ELECTRIC ACTUATOR
TT LT FT PT
24 24
Successful Implementation & Improved Operation
M P T M M P T M
M.O.V. CONFIG. DEVICE MGMT F F M B M B F F GATEWAY FIELDBUS MODBUS PROPRIETARY OPERAT. CONSOLE
M P T M M P T M
DEVICE MGMT F F F F FIELDBUS OPERAT. CONSOLE
25 25
Successful Implementation & Improved Operation
FIELD DISPLAY POWER
LEVEL TEMP & WATER FIELDBUS PRESSURE GAUGE TEMP & WATER BUS PRESSURE BOTTOM BOTTOM FIELD DISPLAY
26 26
Successful Implementation & Improved Operation
FIELDBUS H1
OPERAT. GC MODBUS CONSOLE CONFIG. OPERAT. DEVICE CONSOLE MGMT. SHELTER GC FIELD GC
TT PT FT
SAMPLING SYSTEM
27 27
Successful Implementation & Improved Operation
OPERAT. GC
MODBUS FIELDBUS H1 SAMPLING LINE CONSOLE CONFIG. OPERAT. DEVICE CONSOLE MGMT. SHELTERED GAS CHROMATOGRAPH FIELD GAS CHROMATOGRAPH
TT PT FT
SAMPLING SYSTEM
28 28
Successful Implementation & Improved Operation
29 29
Successful Implementation & Improved Operation
I/O MARSHALLING DI (DC) DO (AC) AI (mA) AO (mA) DI (DC) DO (DC) START COMMAND STOP COMMAND REVERSE/FORWARD SPEED 2 SPEED 3 RUNNING LOCAL ALARM TORQUE FAULT SPEED 1 CURRENT
`
AT SPEED ENABLE VARIABLE
FTA
SPEED
FTA FTA FTA FTA FTA
M
DRIVE
30 30
Successful Implementation & Improved Operation
I/O MARSHALLING
DI (DC) DO (AC) AI (mA) AO (mA) DI (DC) DO (DC)
`
VARIABLE SPEED
M
DRIVE
I/O
PROFIBUS-DP M M M M
VARIABLE SPEED DRIVEs
31 31
Successful Implementation & Improved Operation
32 32
Successful Implementation & Improved Operation
`
ESD (ON/OFF) PST PST (HART) S
PT
PV (4-20 mA / HART) ESD VALVE
33 33
Successful Implementation & Improved Operation
Reducing footprint and wiring further than ever Smart discrete devices Flexibility to handle changes Reduce device count Eliminating the last proprietary protocols Motor controls SIS