- The goals of the early integration pathfinder exercises are - - PowerPoint PPT Presentation

the goals of the early integration pathfinder exercises
SMART_READER_LITE
LIVE PREVIEW

- The goals of the early integration pathfinder exercises are - - PowerPoint PPT Presentation

- The goals of the early integration pathfinder exercises are Overall goal: Ensure that when different instruments, in particular AuxTel, ComCam and Full Camera are installed on the summit TCS/OCS/DM/CCS/DAQ all work as expected - Promote


slide-1
SLIDE 1
slide-2
SLIDE 2
  • The goals of the early integration pathfinder exercises are
  • Overall goal: Ensure that when different instruments, in particular AuxTel, ComCam and

Full Camera are installed on the summit TCS/OCS/DM/CCS/DAQ all work as expected

  • Promote interaction between all principal subsystem control software
  • Perform interface testing
  • Clarify and solidify those interfaces
  • Identify areas of deficiency and address those issues
  • Exercises build on the work of previous ones
  • Test early, test often!
  • A number of pathfinder exercises have been performed over the past 2

years, with more upcoming

  • Valuable lessons have been learned in the process, and will likely continue to be learned in

the future

slide-3
SLIDE 3
  • 1-Visit Night Control Only (Oct 9-10, 2017 @ NCSA)
  • DM Header Service Capability Test (Dec 12, 2017 @ Tucson)
  • DAQ Hardware to Support Wavefront/Guider Testing (Feb 13-14, 2018 @

Tucson)

  • DAQ to DM Files (Mar 1, 2018 @ Tucson)
  • 1-Visit Night with Images AuxTel (April 3-4, 2018 @ NCSA)
  • Manual Control of Multiple Physical Devices on AuxTel (June 7, 2018 @

Tucson)

  • FITS File Assembly at NCSA (June 14, 2018 @ NCSA)
  • ACCS MCM/OCS Bridge for Spectrograph Integration Test (July 17-19,

2018 @ Tucson)

slide-4
SLIDE 4
  • Primary goal is to test software interoperability, this is aided and in some

cases requires that we use the same/similar IT setup as expected on summit

  • A number of areas of overlap have already been identified and are being worked on
  • Need for common OS
  • Centos7 has been adopted as the standard baseline operating system, and is

being used for all pathfinder activities.

  • Need for common installation methodology
  • Puppet has been selected as the software installation tool,
  • Goal is to use puppet for all software installs during pathfinder exercises
  • Need for common identity management and group definitions
  • Work is ongoing in partnership with NCSA to get IDM installed in Tucson using

puppet

  • Need for common documentation and issue tracking tools
  • We are already using JIRA, Confluence and Magic Draw, others to follow
slide-5
SLIDE 5
  • Additional technologies we expect to test in future
  • Configuration management
  • Ensuring we know which versions of software from different subsystems will

interoperate

  • Simulation environments for testing software prior to installation on summit
  • Automatic testing and reporting tools
  • Network infrastructure (IP address, virtual networks, summit/base inter-operability)
  • Shared file systems
  • Remote access technologies and cyber security
  • VPN, ssh, VNC (like) technologies
  • Access control (perhaps basd on location)
  • PTP time standard distribution