Test & Measurements – TEM The multi rotor turbine

Project Manager, Søren O. Lind 17-11-2016

This material is not for public distribution. Any use of the material must be given the appropriate reference: “Source: DTU Wind Energy”. For users other than the SARETEC Study Tour members visiting DTU 15 and 17 November 2016, prior permission must be obtained before using this material.

slide-2
SLIDE 2

09 March 2016 DTU Wind Energy, Technical University of Denmark

in Footer via ”Insert”; ”Header & Footer”

Turbines through time

Bonus 600kW

2

Vestas 225kW Bonus 1300kW Siemens 3600kW Vestas V164 8MW

slide-3
SLIDE 3

09 March 2016 DTU Wind Energy, Technical University of Denmark

in Footer via ”Insert”; ”Header & Footer”

So why!

3

Test activity on DTU, Campus Risø. The Vestas Babylon concept turbine.

slide-4
SLIDE 4

09 March 2016 DTU Wind Energy, Technical University of Denmark

in Footer via ”Insert”; ”Header & Footer”

4

Well, let’s look at nature!!

The square cube law

slide-5
SLIDE 5

09 March 2016 DTU Wind Energy, Technical University of Denmark

in Footer via ”Insert”; ”Header & Footer”

Argentavis

5

But Why!!

The biggest known flying bird Argentavis magnificens Weight 70 kg Wind span 7 m

slide-6
SLIDE 6

09 March 2016 DTU Wind Energy, Technical University of Denmark

in Footer via ”Insert”; ”Header & Footer”

6

That’s why!

slide-7
SLIDE 7

09 March 2016 DTU Wind Energy, Technical University of Denmark

in Footer via ”Insert”; ”Header & Footer”

4 times area, 4 times nacelle and blade weight!

7

Test activity on DTU, Campus Risø. The Vestas Babylon concept turbine.

slide-8
SLIDE 8

09 March 2016 DTU Wind Energy, Technical University of Denmark

in Footer via ”Insert”; ”Header & Footer”

Vestas statement

Challenges

  • One of the main aims is to find ways to circumvent the negative

consequences linked to the infamous square-cube law. 20/4-2016, Windpower Monthly

slide-9
SLIDE 9

09 March 2016 DTU Wind Energy, Technical University of Denmark

in Footer via ”Insert”; ”Header & Footer”

Thank you!