The V The V The V The V- - - -30 Drilling Solution 30 Drilling - - PowerPoint PPT Presentation

The V The V The V The V- - - -30 Drilling Solution 30 Drilling Solution 30 Drilling Solution 30 Drilling Solution V-30 BLIND BORING APPLICATION V V V V- - - -30 30 30 30 Blind Raising Blind Raising Blind Raising Blind Raising


slide-1
SLIDE 1

The V The V The V The V-

  • 30 Drilling Solution

30 Drilling Solution 30 Drilling Solution 30 Drilling Solution

slide-2
SLIDE 2

V-30 BLIND BORING APPLICATION

slide-3
SLIDE 3

V V V V-

  • 30

30 30 30 Blind Raising Blind Raising Blind Raising Blind Raising & & & & Down Reaming Down Reaming Down Reaming Down Reaming

slide-4
SLIDE 4

Blind Up Reaming Maximum Blind Up Reaming Maximum Blind Up Reaming Maximum Blind Up Reaming Maximum capacity 35 meters capacity 35 meters capacity 35 meters capacity 35 meters Pushing V Pushing V Pushing V Pushing V-

  • 30 Down Maximum

30 Down Maximum 30 Down Maximum 30 Down Maximum capacity 45 meters capacity 45 meters capacity 45 meters capacity 45 meters Pulling V Pulling V Pulling V Pulling V-

  • 30 up Maximum

30 up Maximum 30 up Maximum 30 up Maximum capacity 75 meters capacity 75 meters capacity 75 meters capacity 75 meters

slide-5
SLIDE 5

The V-30 Solution: Drilling an up hole blind without upper level access

In drilling position with cuttings diverter open

slide-6
SLIDE 6

CANADIAN MINE WITH V-30 APPLICATION

Procon Procon Procon Procon New Gold New Gold New Gold New Gold Cameco Cameco Cameco Cameco Kidd Creek Mine Kidd Creek Mine Kidd Creek Mine Kidd Creek Mine Lac Lac Lac Lac-

  • des

des des des-

  • Iles Mine

Iles Mine Iles Mine Iles Mine Vale Mines Vale Mines Vale Mines Vale Mines Boart Boart Boart Boart Longyear Longyear Longyear Longyear Goldex Goldex Goldex Goldex Mine Mine Mine Mine Laronde Laronde Laronde Laronde Mine Mine Mine Mine Lapa Lapa Lapa Lapa Mine Mine Mine Mine Mattagami Mine Mattagami Mine Mattagami Mine Mattagami Mine Boart Boart Boart Boart Longyear Longyear Longyear Longyear Aurico Aurico Aurico Aurico Mine Mine Mine Mine Westwood Mine Westwood Mine Westwood Mine Westwood Mine Stornoway Mine Stornoway Mine Stornoway Mine Stornoway Mine Niobec Niobec Niobec Niobec Mine Mine Mine Mine Major Drilling Major Drilling Major Drilling Major Drilling

slide-7
SLIDE 7

International

Meters Down Under Meters Down Under Meters Down Under Meters Down Under Yamana Yamana Yamana Yamana -

  • Argentina

Argentina Argentina Argentina Goldcorp Cerro=Negro Mine Goldcorp Cerro=Negro Mine Goldcorp Cerro=Negro Mine Goldcorp Cerro=Negro Mine Cayeli Cayeli Cayeli Cayeli Bakir Bakir Bakir Bakir Bulyanhulu Bulyanhulu Bulyanhulu Bulyanhulu Mine, Tanzania Mine, Tanzania Mine, Tanzania Mine, Tanzania Randgold Randgold Randgold Randgold -

  • Mali

Mali Mali Mali Cementation Cementation Cementation Cementation -

  • Ghana

Ghana Ghana Ghana MATSA MATSA MATSA MATSA Caraiba Caraiba Caraiba Caraiba -

  • Brazil

Brazil Brazil Brazil AUMS AUMS AUMS AUMS -

  • Mali

Mali Mali Mali Capstone Capstone Capstone Capstone -

  • Mexico

Mexico Mexico Mexico AUMS, Tanzania AUMS, Tanzania AUMS, Tanzania AUMS, Tanzania HZL, India HZL, India HZL, India HZL, India JCHX, China JCHX, China JCHX, China JCHX, China Polymetal Polymetal Polymetal Polymetal, Russia , Russia , Russia , Russia Norilsk, Russia Norilsk, Russia Norilsk, Russia Norilsk, Russia

slide-8
SLIDE 8

V-30 Users Worldwide

V V V V-

  • 30 User

30 User 30 User 30 User Type of Head Type of Head Type of Head Type of Head Application Application Application Application Rock Rock Rock Rock Hardness Hardness Hardness Hardness

Boart Longyear Canada 2-RH V-30 Pushing 1-LH V-30 Pulling Up slots 20 -35 m 25-30,000 PSI AUMS Mining Contracting 2-RH V-30 Pushing 2-LH V-30 Pulling Up slots 20 – 25 m Down slots 20 - 25 20-25,000 PSI 20-25,000 PSI Rio Tinto – Diavik Mine 1-RH V-30 Pushing Up slots 20 – 25m 15-20,000 PSI Metres Down Under - Australia 3-LH V-30 Pulling Up slots 20 – 35m Down slots 25 – 45m 25-35,000 PSI MATSA- Spain 1-RH V-30 Pushing Up slots 20 – 25m 15-20,000 PSI Golcorp - Argentina 3-RH V-30 Pushing Up slots 15 – 25m Down Slots – 25m 15-20,000 PSI Cayeli Bakir Isletmeleri - Turkey 2-LH V-30 Pulling Slots 15 – 20 m 10-15,000 PSI Caraiba - Brasil 1-RH V-30 Pushing Up slots 20 – 25m 20-25,000 PSI

slide-9
SLIDE 9

V-30’s in MRI Contracting Division

Customer Customer Customer Customer Type of Head Type of Head Type of Head Type of Head Application Application Application Application Rock Rock Rock Rock Hardness Hardness Hardness Hardness

Vale Inco – Mines 1-RH V-30 Pushing Up Slots 15 – 20 m 25-30,000 PSI Agnico Eagle – Lapa Division 3 RH V-30 Pushing 1 LH V-30 Pulling Up Slots 20 – 25 m Down Slots 20 – 25 m 15 – 20,000 PSI Agnico Eagle – Laronde Division 1-RH V-30 Pushing Up Slots 25 – 30 m 25-30,000 PSI Glencore – Kidd Creek Mine 1-RH V-30 Pushing Up Slots 25 – 30 m 25-30,000 PSI Agnico Eagle – Goldex Mine 1-RH V-30 Pushing Down Slots 50 – 60 m 20-25,000 PSI Glencore – Mattagami Mine 1-RH V-30 Pushing Up Slots 15 – 20 m 25-30,000 PSI Newgold – New Afton Mine 1-RH V-30 Pulshing 18 m up slots for drawbell development 10-15,000 PSI

slide-10
SLIDE 10

30 inch raise hole through fractured ground

slide-11
SLIDE 11

MACHINES ROGER V30 HEAD PASSING THROUGH LEVELS

The V30 can be pulled successfully through adverse drilling conditions as pictured here on the left The V30 can also be pulled or pushed through rock bolts

slide-12
SLIDE 12

REMOVAL REMOVAL REMOVAL REMOVAL OF OF OF OF CUTTINGS CUTTINGS CUTTINGS CUTTINGS

Cuttings normally don’t need to be removed with a scoop on a 25 – 30m raise, provided:

  • The cuttings can be washed away from the drill after every rod.
  • Access to the drill can be maintained so that the drill can easily

be moved once the hole has been completed. If access to the front of the drill is available with a scoop, we do like to remove the cuttings periodically.

slide-13
SLIDE 13

V-30 Operating Costs

Rock Hardness Rock Hardness Rock Hardness Rock Hardness 10 10 10 10-

  • 15,000 PSI

15,000 PSI 15,000 PSI 15,000 PSI 15 15 15 15-

  • 25,000 PSI

25,000 PSI 25,000 PSI 25,000 PSI 25 25 25 25-

  • 35,000 PSI

35,000 PSI 35,000 PSI 35,000 PSI 70 70 70 70 – – – – 100 Kpa 100 Kpa 100 Kpa 100 Kpa 100 100 100 100 – – – – 170 Kpa 170 Kpa 170 Kpa 170 Kpa 170 170 170 170 – – – – 250 Kpa 250 Kpa 250 Kpa 250 Kpa

Drilling Rate 5.0 m/hr 3.0 m/hr 1.5 m/hr

Operating Costs Operating Costs Operating Costs Operating Costs $/m $/m $/m $/m CDN CDN CDN CDN $/m $/m $/m $/m CDN CDN CDN CDN $/m $/m $/m $/m CDN CDN CDN CDN

Bits 70.43 $ 72,73 $ 187,80 $ Rods 5.41 $ 6,24 $ 12,16 $ Parts & Maintenance 34.32 $ 44,00 $ 114,39 $ Drilling 6’’ Pilot 4.45 $ 5,87 $ 13,34 $ Reaming 6’’ to 10’’ 14.13 $ 24.22 $ 42,39 $

Total Operating Total Operating Total Operating Total Operating Costs Costs Costs Costs 128.74 128.74 128.74 128.74 $ $ $ $ 152,56 152,56 152,56 152,56 $ $ $ $ 370,08 370,08 370,08 370,08 $ $ $ $

V V V V-

  • 30 Sheduled

30 Sheduled 30 Sheduled 30 Sheduled Overhaul Overhaul Overhaul Overhaul After After After After 1500 1500 1500 1500 meters meters meters meters After After After After 1000 1000 1000 1000 meters meters meters meters After After After After 800 800 800 800 meters meters meters meters V-30 Hammers 38.69 $ 58,04 $ 72,54 $ Overhaul 17,36 $ 33,76 $ 42,21 $ Overhaul Cost Overhaul Cost Overhaul Cost Overhaul Cost 56.05 56.05 56.05 56.05 $ $ $ $ 91,80 91,80 91,80 91,80 $ $ $ $ 114,75$ 114,75$ 114,75$ 114,75$ Please note that the costs above do not include the capital costs of purchase of the V-30, nor do they include the cost of labour or costs related to the drill.

slide-14
SLIDE 14

V-30 Operating Parameters

Rock Rock Rock Rock Hardness Hardness Hardness Hardness 10 10 10 10-

  • 15,000 PSI

15,000 PSI 15,000 PSI 15,000 PSI 70 70 70 70 – – – – 100 100 100 100 Kpa Kpa Kpa Kpa 15 15 15 15-

  • 25,000 PSI

25,000 PSI 25,000 PSI 25,000 PSI 100 100 100 100 – – – – 170 170 170 170 Kpa Kpa Kpa Kpa 25 25 25 25-

  • 35,000 PSI

35,000 PSI 35,000 PSI 35,000 PSI 170 170 170 170 – – – – 250 250 250 250 Kpa Kpa Kpa Kpa Drilling Rate Drilling Rate Drilling Rate Drilling Rate 5.0 m/hr 5.0 m/hr 5.0 m/hr 5.0 m/hr 3.0 m/hr 3.0 m/hr 3.0 m/hr 3.0 m/hr 1.5 m/hr 1.5 m/hr 1.5 m/hr 1.5 m/hr Rotation Speed Rotation Speed Rotation Speed Rotation Speed 22 22 22 22-

  • 26 RPM

26 RPM 26 RPM 26 RPM 20 20 20 20 – – – – 24 RPM 24 RPM 24 RPM 24 RPM 15 15 15 15 -

  • 20 RPM

20 RPM 20 RPM 20 RPM Rotation Torque Rotation Torque Rotation Torque Rotation Torque 1800 1800 1800 1800 – – – – 2400 PSI 2400 PSI 2400 PSI 2400 PSI 1800 1800 1800 1800 – – – – 2400 PSI 2400 PSI 2400 PSI 2400 PSI 1800 1800 1800 1800 – – – – 2400 PSI 2400 PSI 2400 PSI 2400 PSI Feed Pressure Feed Pressure Feed Pressure Feed Pressure – – – – Pushing Up Pushing Up Pushing Up Pushing Up 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI Feed Pressure Feed Pressure Feed Pressure Feed Pressure – – – – Pushing Pushing Pushing Pushing Down Down Down Down 300 to 500 PSI 300 to 500 PSI 300 to 500 PSI 300 to 500 PSI 300 to 500 PSI 300 to 500 PSI 300 to 500 PSI 300 to 500 PSI 300 to 500 PSI 300 to 500 PSI 300 to 500 PSI 300 to 500 PSI Feed Pressure Feed Pressure Feed Pressure Feed Pressure – – – – Pulling Up Pulling Up Pulling Up Pulling Up 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI 1500 to 2300 PSI Hammer Upper Bolt Torque Hammer Upper Bolt Torque Hammer Upper Bolt Torque Hammer Upper Bolt Torque 1250 ft. lbs. 1250 ft. lbs. 1250 ft. lbs. 1250 ft. lbs. 1250 ft. lbs. 1250 ft. lbs. 1250 ft. lbs. 1250 ft. lbs. 1250 ft. lbs. 1250 ft. lbs. 1250 ft. lbs. 1250 ft. lbs. Hammer Lower Bolt Torque Hammer Lower Bolt Torque Hammer Lower Bolt Torque Hammer Lower Bolt Torque 260 ft. lbs. 260 ft. lbs. 260 ft. lbs. 260 ft. lbs. 260 ft. lbs. 260 ft. lbs. 260 ft. lbs. 260 ft. lbs. 260 ft. lbs. 260 ft. lbs. 260 ft. lbs. 260 ft. lbs. Hammer Lubrication Hammer Lubrication Hammer Lubrication Hammer Lubrication 5 liters/hr. 5 liters/hr. 5 liters/hr. 5 liters/hr. 5 liters/hr. 5 liters/hr. 5 liters/hr. 5 liters/hr. 5 liters/hr. 5 liters/hr. 5 liters/hr. 5 liters/hr. Centraliser Wear Limit Centraliser Wear Limit Centraliser Wear Limit Centraliser Wear Limit 8 inches 8 inches 8 inches 8 inches 8 inches 8 inches 8 inches 8 inches 8 inches 8 inches 8 inches 8 inches

slide-15
SLIDE 15

Developing primary slots with V Developing primary slots with V Developing primary slots with V Developing primary slots with V-

  • 30

30 30 30 and and and and Cubex Cubex Cubex Cubex ITH Drill ITH Drill ITH Drill ITH Drill

Primary slots can be developed using Machines Rogers’ V-30 boring head and a conventional ITH drill. The 762mm diameter V-30 hole provides the relief required into which to blast the helper holes required to achieve the required slot dimensions. A typical 25 meter slot can be achieved in 1 to 3 shots depending on drilling accuracy and blaster proficiency.

0,80M 2 3 0,80M 1 0,40m 1,8m 5 4 1,8m

A typical 1,8M x 1,8M , 25 meter length slot can be completed in 8 to 9 shifts. The use of an ITH drill will ensure drilling accuracy over long hole lengths. The V-30 can be used to develop 35 meter slots when drilling up, and 45 meters when drilling down.

slide-16
SLIDE 16

Developing primary slots with V Developing primary slots with V Developing primary slots with V Developing primary slots with V-

  • 30 and

30 and 30 and 30 and cubex cubex cubex cubex ITH drill ITH drill ITH drill ITH drill

0,80M 2 3 0,80M 1 0,40m 1,8m 5 4 1,8m

Setting up the ITH drill in the stope in preparation for V-30 drilling does not require any special installation such as concrete pad or slashing the back. An experienced ITH driller will readily learn and master V-30 drilling. Training the local personnel can be achieved easily in relatively short time frame. In addition to developing the slots, the ITH drill can be used for all other drilling requirements such as: Production drilling Service hole drilling Paste fill hole drilling

slide-17
SLIDE 17

Advantages of utilising the V- 30 boring head for slot development

Assurance that the slot will be successful ,with low risk of failure ,such as associated with conventionally blasted slots Ease of use and operator training relatively simple. Ability to use the ITH drill to accomplish other drilling requirements; production & service hole drilling. Speed by which the primary slots can be developed in comparison to other methods. Equipment setup and moving without special installations such as required for Raise Boring (concrete base) or Alimaks. Capacity to develop blind slots (drilling up) without the requirement for an upper level. Disadvantages Disadvantages Disadvantages Disadvantages The method still requires the drilling and blasting

  • f relief holes in order to achieve the required

slot dimensions.

slide-18
SLIDE 18

Slot development using Alimak method

  • The development of slot raises using the Alimak

method requires specialised equipment and an experienced labor force.

  • The installation of Alimak equipment is

complicated and labour intensive.

  • Miners experienced in Alimak mining are difficult

to find and/or train and require:

  • Specialised training with Alimak installation.
  • Experience using ‘Stopper’ drills.
  • Experience in raise blasting.
  • Completing a typical 2,0M x 2,0M, 25 meter

length slot can require 20– 22 shifts depending

  • n the type of installation chosen.
slide-19
SLIDE 19

Slot development using a conventional Raise Bore

  • Slot development using a conventional raise boring

machine involves sophisticated equipment requiring a specialised labour force.

  • Raise bore machines are normally operated by a mining

contractor with highly trained raise bore operators.

  • Training a proficient raise bore operator is a lengthy

process..

  • Training the local work force on the use of this type of

equipment is a long a repetitious

  • The equipment is expensive and will be uniquely

dedicated to the slot development. This equipment will not be used for other drilling requirements such as; production drilling.

  • This type of equipment does not typically have the

capacity of drilling blind up holes.

slide-20
SLIDE 20

Slot development using a conventional Raise Bore

  • Development of a typical 1,8M x 1,8M, 25 meter in

length slot using a 42’’ reamer can require 10 – 12 shifts:

  • Site preparation, installation of concrete base

and equipment installation: 3 shifts.

  • Drilling pilot hole and installing reamer head:

1 shift.

  • Reaming to 42 inches: 3 shifts.
  • Drilling 4 ½’’ holes: 2 shifts.
  • Blasting: 2 shifts.
  • Demobilisation: 1 shift.
slide-21
SLIDE 21

SLOT DEVELOPMENT USING CONVENTIONAL DRILLING AND BLASTING

  • The development of a primary slot using

this method requires an experienced labour force.

  • The success of a slot using this method

will first of all be driven by the accuracy of drilling.

  • This method requires attentive

drillers and the right choice of drilling equipment.

  • If slots are longer than 15 meters

serious consideration should be given to choosing an ITH drill.

  • Hole deviation of more than 3% will

increase the possibility of failure.

  • Blasting the slot using this method will require an experienced

blasting team.

  • Blasting a slot is not an exact science, and the blaster will have to

adjust his method and bring required changes after each blast.

1,8 M 1,8 M 1,8 M

slide-22
SLIDE 22

SLOT DEVELOPMENT USING CONVENTIONAL DRILLING AND BLASTING

  • A typical 1,8M x 1,8M, 25 meter slot will

require 8 to 10 blasts, depending on the proficiency of the blaster.

  • The total slot development will re quire

13 – 15 shifts, provided no major problems are encountered.

  • A missed blast will require specific and

detailed operating procedures in order to attempts to recover the slot.

  • Standard operating procedures will need to be developed in order

to minimise the recovery risk.

  • When explosives remnants are suspected to be present, all drillng

required to recover the slot will have to be carried out with remote drilling.

  • In certain situations, a failed slot will have to be abandoned and re-

drilled at another location.

1,8 M 1,8 M 1,8 M

slide-23
SLIDE 23

Comparison of Slot Development Methods – 25 m Slot

Development Development Development Development with with with with V V V V-

  • 30

30 30 30 Development Development Development Development with with with with Alimak Alimak Alimak Alimak Development Development Development Development with with with with Raise Raise Raise Raise Bore Bore Bore Bore Development Development Development Development with with with with Conventional Conventional Conventional Conventional D & B D & B D & B D & B

V-30/Cubex ITH Alimak Raise Bore Elec/Hyd Drill

Characteristics Characteristics Characteristics Characteristics

  • Quick & simple setup
  • Economical
  • Low training requirements
  • Multifunctional equipment
  • Capability of blind up &

down reaming

  • Stope delivered quickly
  • High success rate

Cost : $1,380.00/m Cost : $1,380.00/m Cost : $1,380.00/m Cost : $1,380.00/m Characteristics Characteristics Characteristics Characteristics

  • Lengthy, expensive setup
  • Requires specialised labour

force

  • Solution slow and expensive
  • Lengthy training

requirements

  • High success rate

Cost: $2,200.00/m Cost: $2,200.00/m Cost: $2,200.00/m Cost: $2,200.00/m Characteristics Characteristics Characteristics Characteristics

  • Expensive setup
  • High capital cost
  • Requires specialised labour

force

  • Unifunctional equipment
  • Difficult to drill up
  • High success rate

Cost: $1,680.00/m Cost: $1,680.00/m Cost: $1,680.00/m Cost: $1,680.00/m Characteristics Characteristics Characteristics Characteristics

  • Quick & simple setup
  • Most economical solution
  • Requires experienced labour

force

  • Solution with highest failure

rate

  • Presents highest safety

concerns Cost: $1,160.00/m Cost: $1,160.00/m Cost: $1,160.00/m Cost: $1,160.00/m Success rate: 98% Success Rate: 100% Success rate: 98% Success Rate: 80%

0,8 M 0,4M 1,8 M 0,8 M 1,8 M Typical 1,8m x 1,8 meter slot - 115 mm relief holes V-30 Slot - 30'' 1,8 M 1,8 M 0,9 M 0,4M 1,8 M 0,9 M 1,8 M Ouverture de 1,8m x 1,8 m slot - trou d'abatage de 115mm Trou Alésé - 42''
slide-24
SLIDE 24

Comparison of Slot Development Methods – 25 m Slot

Development Development Development Development with with with with V V V V-

  • 30

30 30 30 Development Development Development Development with with with with Alimak Alimak Alimak Alimak Development Development Development Development with with with with Raise Raise Raise Raise Bore Bore Bore Bore Development Development Development Development with with with with Conventional Conventional Conventional Conventional D & B D & B D & B D & B

V-30/Cubex ITH Alimak Raise Bore Elec/Hyd Drill

Time (hrs) Installation: 4 Drill pilot 6 ½: 4 Ream 6 ½ à 10’’: 4 Ream to 30’’: 24 4 ½’’ Drilling 16 Blasting: 16 Demobilisation: 4 Total 72 Cost : $1,380.00/m Time (hrs) Installation: 54 Drilling & Blasting

  • 8 to 10 , 2m cycles 72

Demobilisation 40 Total 166 Cost: $2,200.00/m Time(hrs) Installation 24 Drill Pilot 8 Installation of head 4 Reaming to 42’’ 20 41/2’’ Drilling 16 Blasting 16 Demobilisation: 8 Total 96 Cost: $1,680.00/m Time (hrs) Installation: 4 4 ½’’ Drilling: 44 Ream 4 ½ à 6’’: 12 Blasting: 40 Demobilisation: 4 Total 104 Cost: $1,160.00/m Success rate: 98% Success Rate: 100% Success rate: 98% Success Rate: 80%

0,8 M 0,4M 1,8 M 0,8 M 1,8 M Typical 1,8m x 1,8 meter slot - 115 mm relief holes V-30 Slot - 30'' 1,8 M 1,8 M 0,9 M 0,4M 1,8 M 0,9 M 1,8 M Ouverture de 1,8m x 1,8 m slot - trou d'abatage de 115mm Trou Alésé - 42''
slide-25
SLIDE 25
slide-26
SLIDE 26
slide-27
SLIDE 27

V-30 Cuttings Diverter Open V-30 Cuttings Diverter Closed

slide-28
SLIDE 28

Orion DHH Orion DHH Orion DHH Orion DHH Uphole drilling in drift

slide-29
SLIDE 29

Side view Side view Side view Side view

slide-30
SLIDE 30
slide-31
SLIDE 31

On site training by experienced driller/trainer

slide-32
SLIDE 32

From Contracts Carried out by Machines From Contracts Carried out by Machines From Contracts Carried out by Machines From Contracts Carried out by Machines Roger International Contracts Division Roger International Contracts Division Roger International Contracts Division Roger International Contracts Division Notes: 1) Cost Plus Hours is time (man hours) charged to the mine due to delays that prevented drilling such as; lack of air or water, no electricity, poor ventilation, unsafe workplace etc. 2) Cost Plus Hours were also used to calculate Percentage Utilisation.

Case Studies of the V-30 / ITH Drilling Solution

slide-33
SLIDE 33

Case Study1: Hecla Mine

  • Application

Application Application Application :

  • V-30 Blind Boring – slot drilling up
  • Production drilling
  • Client

Client Client Client : Hecla Mine

  • Equipment

Equipment Equipment Equipment used used used used : : : :

  • Cubex

Cubex Cubex Cubex : 1 - ITH Drill : Megamatic 5200 Booster Compressor: Cubex R-110

  • MACHINES ROGER

MACHINES ROGER MACHINES ROGER MACHINES ROGER : 1 - V-30 RH Blind Boring Head

slide-34
SLIDE 34

Case Study No 1: Hecla Mine

Parameters Parameters Parameters Parameters : : : :

  • Diameter of pilot hole :

6 ½” ( 165 mm)

  • Diameter of reamed hole :

10” (254 mm)

  • Diameter of V-30 raise :

30” ( 762 mm )

  • Average length of V-30 raise :

15.5 mts

  • Access drift diameter :

4.2 x 4.0mts

  • Air requirement :

1400 scfm

  • Average drilling pressure :

240 psi

  • Number of shifts per day:

2 – 7 days

  • Effective hours worked per shift: 9,5
  • Total available hours:

12 300 hrs per year

  • Percentage Utilisation:

51.8% Percentage Availability 93% Annual Performance Annual Performance Annual Performance Annual Performance

  • V-30 Up hole drilling:

1270 meters

  • 250mm service hole drilling:

650 meters

  • 165mm Service hole drilling:

950 meters

  • Cost Plus hours:

6050

slide-35
SLIDE 35

Case Study 2: Glencore Div 1

  • Application :

Application : Application : Application :

  • V-30 Blind Boring – Up hole slot drilling
  • Client :

Client : Client : Client : Glencore Division 1

  • Equipment

Equipment Equipment Equipment used used used used : : : :

  • CUBEX

CUBEX CUBEX CUBEX : 1 - ITH Drills : Megamatic 6200 1 - Booster Compressor: Cubex R-110

  • MACHINES ROGER

MACHINES ROGER MACHINES ROGER MACHINES ROGER : 1 - V-30 RH Blind Boring Heads

slide-36
SLIDE 36

Case Study 2: Glencore Div 1

Parameters Parameters Parameters Parameters : : : :

  • Diameter of pilot hole :

6 ½” ( 165 mm)

  • Diameter of reamed hole :

10” (254 mm)

  • Diameter of V-30 raise :

30” ( 762 mm )

  • Average length of V-30 raise :

25 mts

  • Access drift diameter :

4.5 x 4.5 mts

  • Air requirement :

1400 scfm

  • Average drilling pressure :

180 - 200 psi

  • Number of shifts:

1 – 7 days

  • Effective hours worked per shift: 10 hrs
  • Total hours available:

7550 hrs per year

  • Percentage utilisation:

73.5 %

  • Percentage Availability

90 %

Annual Performance Annual Performance Annual Performance Annual Performance

  • V-30 Up hole drilling:

1800 meters

  • 165mm Production drilling:

1200 meters

  • 115mm Production drilling:

700 meters

  • Cost Plus hours:

2000 hrs

slide-37
SLIDE 37

Case Study 3: Agnico Eagle Div 2

  • Application :

Application : Application : Application :

  • V-30 Blind Boring – Slot drilling up & down
  • Production Drilling
  • Client :

Client : Client : Client : Agnico Eagle Div 2

  • Equipment

Equipment Equipment Equipment used used used used : : : :

  • CUBEX

CUBEX CUBEX CUBEX : 4 - ITH Drills : Megamatic 6200 & 5200 4 - Booster Compressor: Cubex R-110 & R-55

  • MACHINES ROGER

MACHINES ROGER MACHINES ROGER MACHINES ROGER : 2 - V-30 RH Blind Boring Heads and 1 Conventionnal LH Pulling Head

slide-38
SLIDE 38

Case Study 3: Agnico Eagle Div 2

Parameters Parameters Parameters Parameters : : : :

  • Diameter of pilot hole :

6 ½” ( 165 mm)

  • Diameter of reamed hole :

10” (254 mm)

  • Diameter of V-30 raise :

30” ( 762 mm )

  • Average length of V-30 raise :

26 mts

  • Access drift diameter :

4.2 x 4.5 mts

  • Air requirement :

1400 scfm

  • Average drilling pressure :

220 psi

  • Number of shifts:

2

  • Effective hours worked per shift: 10
  • Total hours available:

56,000 hrs per year

  • Percentage utilisation:

75.9%

  • Percentage Availability:

92 %

Annual Performance Annual Performance Annual Performance Annual Performance

  • V-30 Up hole drilling:

2400 meters

  • 165mm Production drilling:

155 meters

  • 115mm Production drilling:

38495 meters

  • Cost Plus hours:

13495 hrs

slide-39
SLIDE 39

Case Study 4: Agnico Eagle – Div 3

  • Application :

Application : Application : Application :

  • V-30 Blind Boring – Slot drilling Up
  • Production Drilling
  • Client :

Client : Client : Client : Agnico Agnico Agnico Agnico Eagle Eagle Eagle Eagle – – – – Division Division Division Division 3 3 3 3

  • Equipment

Equipment Equipment Equipment used used used used : : : :

  • CUBEX

CUBEX CUBEX CUBEX : 1 - ITH Drill : Megamatic 6200 1 - Booster Compressor: Cubex R-110

  • 1

1 1 1 -

  • MACHINES ROGER

MACHINES ROGER MACHINES ROGER MACHINES ROGER : 1 - V-30 RH Blind Boring Head

slide-40
SLIDE 40

Case Study 4: Agnico Eagle – Div 3

Parameters Parameters Parameters Parameters : : : :

  • Diameter of pilot hole :

6 ½” ( 165 mm)

  • Diameter of reamed hole :

10” (254 mm)

  • Diameter of V-30 raise :

30” ( 762 mm )

  • Average length of V-30 raise :

35 mts

  • Access drift diameter :

4.2 x 4.5 mts

  • Air requirement : 1

400 scfm

  • Average drilling pressure :

200 - 220 psi

  • Number of shifts:

2 – 7 days

  • Effective hours worked per shift: 9.5 or 11.5
  • Total hours available:

4,200 hrs per year

  • Percentage utilisation:

51 %

  • Percentage Availability:

93 %

Annual Annual Annual Annual Performance Performance Performance Performance

  • V-30 drilling:

270 meters

  • 165mm Production drilling: 10400 meters
  • 115mm Production drilling:

5700 meters

  • Cost Plus hours:

2055

slide-41
SLIDE 41

Case Study 5: Agnico Eagle – Div 1

  • Application :

Application : Application : Application :

  • V-30 Blind Boring – Slot drilling
  • Production Drilling
  • Service Hole Drilling
  • Client :

Client : Client : Client : Agnico Agnico Agnico Agnico Eagle Eagle Eagle Eagle – – – – Division Division Division Division 1 1 1 1

  • Equipment

Equipment Equipment Equipment used used used used : : : :

  • CUBEX

CUBEX CUBEX CUBEX : 1 - ITH Drill : Megamatic 6200 1 - Booster Compressor: Cubex R-110

  • 1

1 1 1 -

  • MACHINES ROGER

MACHINES ROGER MACHINES ROGER MACHINES ROGER : 1 - V-30 RH Blind Boring Head

slide-42
SLIDE 42

Case Study 5: Agnico Eagle – Div 1

Parameters Parameters Parameters Parameters : : : :

  • Diameter of pilot hole :

6 ½” ( 165 mm)

  • Diameter of reamed hole :

10” (254 mm)

  • Diameter of V-30 raise :

30” ( 762 mm )

  • Average length of V-30 raise :

25 mts

  • Access drift diameter :

4.2 x 4.5 mts

  • Air requirement : 1

400 scfm

  • Average drilling pressure :

200 - 220 psi

  • Number of shifts:

2 – 7 days

  • Effective hours worked per shift:

9.5

  • Total hours available:

6500 hrs per year

  • Percentage utilisation:

49 %

  • Percentage Availability:

81 %

Annual Annual Annual Annual Performance Performance Performance Performance

  • V-30 drilling:

570 meters

  • 250 mm Service hole drilling:

3400 meters

  • 165mm Service hole or Production drilling:14400 meters
  • 115mm Service hole or Production drilling: 4800 meters
  • Cost Plus hours:

3260 hrs

slide-43
SLIDE 43

Case Study 6: Richmont Mine

  • Application :

Application : Application : Application :

  • V-30 Slot drilling
  • Service Hole Drilling
  • Client :

Client : Client : Client : Richmont Richmont Richmont Richmont Min Min Min Mine e e e

  • Equipment

Equipment Equipment Equipment used used used used : : : :

  • CUBEX

CUBEX CUBEX CUBEX : 1 - ITH Drill : Megamatic 6200 1 - Booster Compressor: Cubex R-110

  • 1

1 1 1 -

  • MACHINES ROGER

MACHINES ROGER MACHINES ROGER MACHINES ROGER : 1 - V-30 RH Blind Boring Head

slide-44
SLIDE 44

Case Study 6: Richmont Mine

Parameters Parameters Parameters Parameters : : : :

  • Diameter of pilot hole :

6 ½” ( 165 mm)

  • Diameter of reamed hole :

10” (254 mm)

  • Diameter of V-30 raise :

30” ( 762 mm )

  • Average length of V-30 raise :

16 mts

  • Access drift diameter :

4.2 x 4.5 mts

  • Air requirement : 1

400 scfm

  • Average drilling pressure :

180 - 200 psi

  • Number of shifts:

2 – 7 days

  • Effective hours worked per shift:

9.5

  • Total hours available:

4,800 hrs per year

  • Percentage utilisation:

63 %

  • Percentage Availability:

80 %

Annual Annual Annual Annual Performance Performance Performance Performance

  • V-30 drilling:

460 meters

  • 300mm Service hole drilling:

700 meters

  • 250mm Service hole drilling:

1000 meters

  • 165mm Service hole drilling:

1700 meters

  • Cost Plus hours:

1770 hrs

slide-45
SLIDE 45

Typical V-30 Slot Design 1,8M x 1,8M (100mm – 115mm corner holes)

0,8 M 0,4M 1,8 M 0,8 M 1,8 M

slide-46
SLIDE 46

Typical V-30 Slot Design 3,0M x 3,0M (100mm – 115mm holes)

3M 3M V-30 00,76M

slide-47
SLIDE 47