THE VERMONT RESIDENTIAL ENERGY CODE 2015 WORKSHOP CONTENT T - - PowerPoint PPT Presentation
THE VERMONT RESIDENTIAL ENERGY CODE 2015 WORKSHOP CONTENT T - - PowerPoint PPT Presentation
THE VERMONT RESIDENTIAL ENERGY CODE 2015 WORKSHOP CONTENT T he E ne rg y Co de Ba c kg ro und / Ove rvie w Whic h b uilding s, whe n? Ob lig a tio ns o f the b uilde r Wha t s Re q uire d? Ba sic Re q uire me
WORKSHOP CONTENT
- T
he E ne rg y Co de
- Ba c kg ro und / Ove rvie w
- Whic h b uilding s, whe n?
- Ob lig a tio ns o f the b uilde r
- Wha t’ s Re q uire d?
- Ba sic Re q uire me nts
- Pe rfo rma nc e Re q uire me nts
- F
iling the Pa pe rwo rk
4/7/2015 2
TODAY’S PRESENTATION
Spo nso re d b y
L a Va lle y Building Supply
De live re d b y E ffic ie nc y Ve rmo nt
4/7/2015 3
MAJOR CHANGES FOR 2015
- Co mplia nc e with Stre tc h c o de re q uire d fo r Ac t 250
pro je c ts
- Ne w insula tio n re q uire me nts a nd pa c ka g e s
- ASHRAE
62.2 o ptio n fo r ve ntila tio n
- Ma ke up a ir re q uire me nts fo r e xha ust ho o ds
- Air tig htne ss re duc e d fro m 5 to 3 ACH50
- 75% o f lig hts must b e hig h e ffic a c y
4/7/2015 4
THE LEGISLATION -- ACT 20 OF 1997 “RESIDENTIAL BUILDING ENERGY STANDARDS”
- Ba se d o n I
nte rna tio na l E ne rg y Co nse rva tio n Co de
- Pe rfo rma nc e -b a se d sta nda rd
- So me Ve rmo nt-spe c ific a dditio ns/ e xe mptio ns
- Se lf-c e rtific a tio n b y b uilde r
- T
hre e -ye a r re visio n c yc le
- Pub lic re vie w pro c e ss
- 2015 c o de a pplie s to a ll pro je c ts tha t sta rt
c o nstruc tio n o n o r a fte r Ma rc h 1, 2015
4/7/2015 5
WHICH BUILDINGS MUST COMPLY?
- Ne w c o nstruc tio n, lo w-rise re side ntia l
- One a nd two fa mily dwe lling s
- Multifa mily ho using thre e sto rie s o r le ss
- Do e s no t inc lude c o mme rc ia l b uilding s
- But do e s inc lude re side ntia l pa rt o f mixe d-use
- E
xisting lo w-rise re side ntia l b uilding s
- Additio ns
- Only the a dditio n ne e ds to c o nfo rm
- Re no va tio ns, windo w & e q uipme nt re pla c e me nt
4/7/2015 6
ALTERATIONS & RENOVATIONS
- Applie s to a dditio ns, a lte ra tio ns, re no va tio ns o r
re pa irs to a n e xisting b uilding , b uilding syste m o r po rtio n the re o f (una lte re d po rtio ns ne e d no t c o mply)
- Applie s to c ha ng e o f unc o nditio ne d to c o nditio ne d
spa c e
- Applie s to insula tio n pro je c ts
- Re pla c e me nt windo ws must c o mply
- Sto rm windo ws a nd g la ss re pla c e me nt e xe mpt
4/7/2015 7
ALTERATIONS & RENOVATIONS
- Wa lls e xe mpt if c a vitie s a re no t e xpo se d o r if
the y a re a lre a dy full o f insula tio n
- Re ro o fing e xe mpt unle ss she a thing o r insula tio n is
e xpo se d a nd c a vity is e mpty
- Re pla c e me nt o f le ss tha n 50% o f lig ht fixture s
a nd re pla c e me nt o f b ulb & b a lla st in e xisting fixture s is e xe mpt
4/7/2015 8
LOG HOMES
- Ve rmo nt c o de disting uishe s b e twe e n lo g ho me s
a nd e ve rything e lse
- I
n g e ne ra l, lo g ho me s a re a llo we d to b e le ss e ffic ie nt
- But the re a re mo re string e nt re q uire me nts fo r o the r pa rts o f
the b uilding to pa rtia lly ma ke up fo r the diffe re nc e
4/7/2015 9
EXEMPTIONS
- E
xtre me lo w e ne rg y use
- le ss tha n 1 wa tt pe r sq ua re fo o t pe a k lo a d
- Mo b ile ho me s
- T
itle VI , Na tio na l Ma nufa c ture d Ho using Co nstruc tio n & Sa fe ty Sta nda rds Ac t o f 1974
- Site -c o nstruc te d c o mpo ne nts still must c o mply
- Building s (o r a re a s) no t he a te d o r c o o le d
- Hunting Ca mps
- Histo ric b uilding s c a n a pply fo r e xe mptio n
4/7/2015 10
OWNER/BUILDER PROJECTS
- Spe c ific a lly e xe mpte d fro m me e ting the te c hnic a l
re q uire me nts o f the c o de
- Owne r must dire c t the de ta ils o f c o nstruc tio n,
inc luding e ne rg y ite ms, must live in the b uilding
- Must do c a lc ula tio ns, c o mple te a nd file the
Owne r/ Builde r Disc lo sure Sta te me nt
- Must disc lo se in writing to po te ntia l b uye rs b e fo re
purc ha se a nd sa le a g re e me nt
4/7/2015 11
LIABILITY
- Ho me o wne r ma y ta ke c ivil a c tio n a g a inst
pe rso n c e rtifying b uilding
- Da ma g e s ma y inc lude inc re a se d e ne rg y
c o sts a nd c o sts to b ring the b uilding into c o mplia nc e (a s we ll a s c o urt, a tto rne ys’ fe e s)
- Cla ims must b e file d within six ye a rs
4/7/2015 12
THERMAL REQUIREMENTS
- T
he ne xt fe w slide s o utline the the rma l re q uire me nts
- f the ne w c o de
- F
- r a ve ra g e ho use s, insta lling the se le ve ls will me e t
the c o de
- But the c o de re q uire s o ve ra ll pe rfo rma nc e , a nd
the re a re ma ny wa ys to g e t the re
- So yo u c a n insta ll a sse mb lie s le ss e ffic ie nt tha n this,
b ut yo u ha ve to ma ke up fo r it so me whe re e lse in the b uilding , a nd yo u ha ve to use a me tho d tha t a c c o mmo da te s tha t tra de -o ff
4/7/2015 17
WINDOWS
- F
e ne stra tio n (e xc e pt skylig hts)
- Ma ximum 0.32 U-va lue (0.30 fo r lo g ho me s)
- Skylig hts
- Ma ximum 0.55 U-va lue
- Gla zing a re a
- Ma ximum 20%
- Up to 15 sq ft o f g la zing a nd o ne do o r is e xe mpt
4/7/2015 18
Thermal Requirements
INSULATION
- Ce iling s
- Minimum R-49
- F
- r fla t c e iling s, R-38 de e me d to me e t R-49 if full he ig ht
unc o mpre sse d o ve r to p wa ll pla te
- Slo pe d c e iling s OK
@ R-30 if no t mo re tha n 500 sq ft o r 20%
- f c e iling a re a , whic he ve r is le ss
- I
nsta lle r must c e rtify de ta ils, sig n, po st in c o nspic uo us lo c a tio n. De pth ma rke rs re q uire d fo r b lo wn a ttic s
4/7/2015 19
Thermal Requirements
INSULATION
- Wo o d fra me wa lls
- Minimum R-25
- R-13 c a vity insula tio n plus R-10 insula te d she a thing de e me d
to c o mply.
- Ma ss wa lls
- Minimum R-15
- R-20 re q uire d if mo re tha n ha lf o f the insula tio n is o n the
inte rio r
- (L
- g ho me s e xe mpt fro m wa ll R-va lue re q uire me nt)
4/7/2015 20
Thermal Requirements
INSULATION
- F
lo o rs
- Minimum R-30 (R-38 fo r lo g ho me s)
- Minimum R-20 OK
if it fills the who le c a vity
- Must ma inta in pe rma ne nt c o nta c t with unde rside o f
sub flo o r
4/7/2015 21
Thermal Requirements
INSULATION
- Ba se me nt wa lls
- Minimum R-15 c o ntinuo us o r R-20 c a vity
- F
ro m to p o f wa ll to 10 ft b e lo w g ra de o r to b a se me nt flo o r, whic he ve r is le ss
- E
xte rio r insula tio n must ha ve pro te c tive c o ve ring
4/7/2015 22
Thermal Requirements
INSULATION
- Unve nte d c ra wl spa c e :
- Minimum R-15 c o ntinuo us o r R-20 inte rio r c a vity
- Pe rma ne ntly fa ste ne d to wa ll do wn to flo o r a nd the n
ve rtic a lly a nd/ o r ho rizo nta lly fo r a t le a st a n a dditio na l 24 inc he s
- Must ha ve Cla ss I
va po r b a rrie r o n flo o r, a tta c he d to wa ll, se a ms ta pe d
- No ve nts to o utside
- Ve nte d c ra wl spa c e
- I
nsula te flo o r a b o ve
4/7/2015 23
Thermal Requirements
INSULATION
- Sla b e dg e
- Minimum R-15 pe rime te r
- F
- ur fe e t hig h o r hig h + wide to ta l
- He a te d sla b
- Minimum R-15 unde rne a th c o ntinuo us
- E
xpo se d e xte rio r insula tio n must ha ve a pro te c tive c o ve ring
4/7/2015 24
Thermal Requirements
WHAT’S REQUIRED?
- Ba sic Re q uire me nts
- Pe rfo rma nc e Re q uire me nts -- T
hre e Me tho ds
“F
a st T ra c k” me tho d
RE
Sc he c k So ftwa re
Ho me E
ne rg y Ra ting
- Ce rtific a tio n
4/7/2015 27
WHEN TO DO THE ANALYSIS
- No t re q uire d until a fte r, b ut...
- Sho uld de te rmine whe re yo u
sta nd b e fo re c o mmitting to a de sig n
- Or e spe c ia lly, b e fo re fra ming &
b a c kfilling
4/7/2015 28
BASIC REQUIREMENTS
- Air T
ig htne ss
- Va po r Re ta rde r
- Duc ts
- T
he rmo sta ts
- So lid F
ue l Applia nc e s
- Ve ntila tio n & Co mb ustio n Air
- Windo w U-va lue
- Pipe I
nsula tio n
- L
ig hting
- E
q uipme nt Sizing
4/7/2015 29
AIR LEAKAGE
- Air le a ka g e lo c a tio ns must b e se a le d
- Applie s to le a ka g e po ints b e twe e n:
- Co nditio ne d spa c e a nd o utside
- Co nditio ne d a nd unc o nditio ne d spa c e s
- T
e sting o ptio n
- L
e ss tha n 3 ACH @ 50 Pa
- E
ve rything o pe n e xc e pt c himne y da mpe rs, c o ntinuo usly
- pe ra ting ve nt syste m, a djusta b le pa ssive ve nts
- Visua l inspe c tio n o ptio n
4/7/2015 31
Basic Requirements
VISUAL AIR BARRIER INSPECTION
- Co ntinuo us, dura b le a ir b a rrie r
- Bre a ks o r jo ints in the a ir b a rrie r se a le d
- Spa c e b e twe e n fe ne stra tio n ja mb s a nd fra ming
se a le d with minimum e xpa nding fo a m
- All plumb ing a nd wiring pe ne tra tio ns sha ll b e se a le d
to the a ir b a rrie r
4/7/2015 32
Basic Requirements
VISUAL AIR BARRIER INSPECTION
- Junc tio ns o f the fo unda tio n a nd sill pla te , sill pla te
a nd rim-b a nd, a nd rim b a nd a nd sub flo o r, a nd to ps
- f wa lls se a le d
- Whe n a ir pe rme a b le insula tio n is insta lle d a t the rim
jo ist, a dura b le , rig id inte rio r a ir b a rrie r sha ll b e insta lle d
- Air b a rrie r sha ll b e insta lle d a t a ny e xpo se d e dg e o f
flo o r insula tio n.
4/7/2015 33
Basic Requirements
VISUAL AIR BARRIER INSPECTION
- Duc t sha fts, utility pe ne tra tio ns, a nd flue sha fts
- pe ning to e xte rio r o r unc o nditio ne d spa c e sha ll b e
a ir se a le d
- Air se a ling sha ll b e pro vide d b e twe e n the g a ra g e
a nd c o nditio ne d spa c e s
- E
xte rio r wa lls a dja c e nt to sho we rs a nd tub s sha ll ha ve a dura b le , rig id a ir b a rrie r se pa ra ting the e xte rio r wa ll fro m the sho we r a nd tub s
4/7/2015 34
Basic Requirements
VISUAL AIR BARRIER INSPECTION
- Air b a rrie r e xte nds b e hind e le c tric a l o r
c o mmunic a tio n b o xe s o r a ir se a le d type b o xe s sha ll b e insta lle d o r c re a te d
- Air b a rrie r sha ll b e insta lle d in c o mmo n wa ll
b e twe e n dwe lling units. Co mmo n wa lls sha ll b e se a le d a t junc tio ns with o utside wa lls a nd a t the to p pre ssure pla ne o f the ho use
- HVAC re g iste r b o o ts tha t pe ne tra te b uilding
the rma l e nve lo pe sha ll b e se a le d to sub flo o r o r drywa ll
- L
- g ho me s ha ve the ir o wn c rite ria (I
CC-400)
4/7/2015 35
Basic Requirements
RECESSED LIGHTS
- Must b e I
C (I nsula tio n Co nta c t) ra te d
- Must b e a ir tig ht o r lo w le a ka g e fixture s
- No pe ne tra tio ns b e twe e n the inside o f the re c e sse d fixture
a nd c e iling c a vity; se a le d o r g a ske te d to pre ve nt a ir le a ka g e
4/7/2015 36
Basic Requirements
ACCESS HATCHES
- Ac c e ss do o rs must b e we a the rstrippe d a nd
insula te d to a le ve l e q uiva le nt to the insula tio n o n the surro unding surfa c e s.
- Ac c e ss must b e pro vide d to a ll e q uipme nt tha t
pre ve nts da ma g ing o r c o mpre ssing the insula tio n.
- A wo o d fra me d o r e q uiva le nt b a ffle o r re ta ine r is
re q uire d whe n lo o se fill insula tio n is insta lle d.
4/7/2015 37
Basic Requirements
VAPOR RETARDER
- Cla ss I
- r I
I (a luminum fo il, po ly, kra ft fa c ing ) re q uire d o n fra me wa lls
- E
xc e pt b a se me nt wa lls & b e lo w g ra de wa lls
- Cla ss I
I I (pa int) a llo we d if:
- Ve nte d c la dding o ve r fib e rb o a rd o r g ypsum
- I
nsula te d she a thing R-7.5 o n 2x4 wa ll
- I
nsula te d she a thing R-11.25 o n 2x6 wa ll
4/7/2015 38
Basic Requirements
DUCTS
- Duc ts o utside the rma l e nve lo pe must b e insula te d
to the sa me R-va lue a s re q uire d fo r imme dia te ly a dja c e nt surfa c e s
- All duc ts must b e a ir se a le d
- Ca n’ t use b uilding c a vitie s a s supply duc ts. Ma y b e
use d a s re turn duc ts, b ut o nly inte rio r c a vitie s
4/7/2015 39
Basic Requirements
DUCTS
- I
f a ir ha ndle r o r a ny duc two rk is lo c a te d o utside c o nditio ne d spa c e , duc ts must b e te ste d a nd ha ve :
- L
e ss tha n 4 CF M@ 25 Pa le a ka g e to o utdo o rs pe r 100 sq ft o f c o nditio ne d flo o r a re a (po stc o nstruc tio n), o r
- L
e ss tha n 3 CF M@ 25 Pa to ta l le a ka g e pe r 100 sq ft o f c o nditio ne d flo o r a re a (ro ug h-in)
4/7/2015 40
Basic Requirements
HEATING CONTROLS
- Pro g ra mma b le the rmo sta t re q uire d if furna c e , he a t
pump o r b o ile r
- No t re q uire d fo r so lid fue l o r spa c e s se rve d b y
ra dia nt flo o rs
4/7/2015 41
Basic Requirements
COMBUSTION AIR FOR GAS & OIL
- All c himne y-ve nte d g a s a nd o il a pplia nc e s
(Ca te g o ry l o r Ca te g o ry ll) must ha ve c o mb ustio n a ir a s spe c ifie d in the g a s a nd o il c o de s (NF PA 54 & 31), e ve n if tho se c o de s ha ve no t b e e n a do pte d in the lo c a l a re a .
- All ne w ho me s a re “unusua lly tig ht c o nstruc tio n”
a s de fine d in the g a s & o il c o de s, so a ir must b e supplie d, re g a rdle ss o f the vo lume o f the spa c e
- Also , ta king c o mb ustio n a nd dilutio n a ir fro m
a ttic s o r c ra wl spa c e s is spe c ific a lly pro hib ite d
4/7/2015 42
Basic Requirements
CHIMNEYS
- All c himne y-ve nte d e q uipme nt must e sta b lish spill-
fre e dra ft within 2 minute s unde r wo rst-c a se c o nditio ns
4/7/2015 43
Basic Requirements
SOLID FUEL COMBUSTION
- Must ha ve g a ske te d do o rs with c o mpre ssio n c lo sure
- r c o mpre ssio n la tc h syste m
- So lid fue l c o mb ustio n a ir must b e de live re d dire c tly
to the fire b o x (e xc e pt o lde r sto ve s whe re no t po ssib le )
- Site -b uilt e xte rio r a ir inle t must me e t de ta ile d
insta lla tio n re q uire me nts
4/7/2015 44
Basic Requirements
MECHANICAL VENTILATION
- Who le ho use ve ntila tio n
- I
nc luding lo c a l e xha ust
- Auto ma tic c o ntro ls
- Minimum flo w ra te s
- I
nsta lla tio n re q uire me nts
4/7/2015 45
Basic Requirements
HOW MUCH AIR?
- T
wo wa ys to c o mply with c o de
- Pre sc riptive
- I
nsta ll re q uire d minimum ra te d c a pa c ity
- Pe rfo rma nc e
- Ha ve syste m te ste d
4/7/2015 46
Basic Requirements
MINIMUM RATED CAPACITIES
Number of Bedrooms Minimum Rated Capacity (CFM) Minimum Number of Fans (if not central system) 1 50 1 2 75 1 3 100 1 4 125 2 5 150 2 > 3000 sq ft 0.05 x sq ft 2
4/7/2015 47
Basic Requirements
PERFORMANCE TESTING
- Me a sure d flo w must b e a t
le a st 15 CF M plus 15 pe r b e dro o m
- 2 b e dro o m – 45 CF
M
- 3 b e dro o m – 60 CF
M
- 4 b e dro o m – 75 CF
M
- 5 b e dro o m – 90 CF
M
4/7/2015 48
Basic Requirements
LOCAL VENTILATION
- Ba thro o ms must ha ve e xha ust
- 50 CF
M c a pa c ity fo r inte rmitte nt
- 20 fo r c o ntinuo us
- Ca n use the who le -ho use syste m o r a se pa ra te fa n
- K
itc he n e xha usts o ve r 400 CF M must ha ve ma ke -up a ir
4/7/2015 49
Basic Requirements
NOISE
- Quie t is impo rta nt
- Or o c c upa nts will turn it o ff
- E
q uipme nt within 4 fe e t o f lo uve rs, g rills o r o pe ning s must b e ra te d no mo re tha n 1.5 so ne s
- Re mo te ly-mo unte d e q uipme nt must b e a c o ustic a lly
iso la te d fro m fra ming a nd iso la te d fro m duc ting b y sho rt (1-2 ft) runs o f insula te d fle x duc t
4/7/2015 50
Basic Requirements
CONTROLS
- Co de re q uire s c o ntinuo us o pe ra tio n o r
a uto ma tic c o ntro l (no re lia nc e o n huma ns)
- Co ntinuo us o pe ra tio n
- Must ha ve la b e le d, re mo te ly-mo unte d switc h
- No lo c a l wa y o f turning o ff
- Auto ma tic Co ntro l
- Must ha ve time r o r o the r fully a uto ma tic c o ntro l
- Cra nk time rs, de humidista ts, switc he s no t a llo we d
4/7/2015 51
Basic Requirements
VENTILATION DUCTWORK
- F
a n ho using s a nd inle t g rills must b e se a le d to c e iling o r wa ll
- Duc t runs o ve r 8 fe e t must b e a smo o th wa ll
ma te ria l
- Duc ts in unhe a te d lo c a tio ns must b e insula te d
- F
a ns must b e c o nne c te d to duc ts with me c ha nic a l fa ste ne rs
- Jo ints & c o nne c tio ns must b e a ir se a le d
4/7/2015 52
Basic Requirements
BATH FAN SELECTION
- Must b e ra te d fo r “c o ntinuo us duty”
- Must no t e xc e e d 50 wa tts
- As liste d b y ma nufa c ture r
- F
a n po we r o nly, no t lig hts, he a te r, e tc
- F
a ns unde r 20 wa tts a va ila b le
- Must b e no mo re tha n 1.5 so ne s
- F
a ns unde r 1 so ne a va ila b le
4/7/2015 53
Basic Requirements
WINDOW EFFICIENCY
- T
he a ve ra g e a re a -we ig hte d U-va lue o f windo ws ma y no t e xc e e d 0.32
- Skylig hts ma y no t e xc e e d U-0.55
4/7/2015 54
Basic Requirements
HOT WATER PIPES
- Me c ha nic a l syste m piping in unc o nditio ne d spa c e s
c a pa b le o f c a rrying fluids a b o ve 105 de g re e s F must b e insula te d to a minimum R-3
- Applie s to spa c e he a ting pipe s o nly, no t do me stic
ho t wa te r
4/7/2015 55
Basic Requirements
LIGHTING EFFICIENCY
- At le a st 75% o f lig hting fixture s must b e hig h-
e ffic ie nc y la mps
- CF
L
- r e q uiva le nt
4/7/2015 56
Basic Requirements
SYSTEM SIZING
- He a t lo a d c a lc ula tio n must b e do ne
- Ma nua l J o r o the r a ppro ve d me tho do lo g y
- Air c o nditio ne rs a nd he a t pumps must no t b e
- ve rsize d b y mo re tha n 15%
- F
ue l-fire d a pplia nc e s must no t b e o ve rsize d b y mo re tha n 40%
- Or use sma lle st a va ila b le unit
4/7/2015 57
Basic Requirements
WANNA SHORT BREAK?
4/7/2015 58
COMPLIANCE METHODS
“F a st T ra c k” Me tho d So ftwa re Me tho d Ho me E ne rg y Ra ting
4/7/2015 59
FAST TRACK METHOD
- Adva nta g e s
- Simple st me tho d
- Minima l c a lc ula tio ns
- L
- w c o st (do it yo urse lf)
4/7/2015 60
FAST TRACK METHOD
Dra wb a c ks
- L
e a st fle xib le , limite d type s o f ho me s
- Gla zing a re a c a nno t e xc e e d 20% o f wa ll a re a
- Ca nno t use fo r me ta l fra ming in e xte rio r wa lls
- Must c o mply with c o nditio ns
- Attic ha tc h insula te d e q ua l to a ttic flo o r
- Ba se me nt wa ll insula tio n full-he ig ht
- Spe c ifie d de pth fo r sla b , c ra wl spa c e insula tio n
4/7/2015 61
FAST TRACK: PROCESS
Ca lc ula te g la zing pe rc e nt a re a F ind the rig ht F a st T ra c k ta b le fo r yo ur b uilding type Cho o se de sire d pa c ka g e Co mple te a nd file Ce rtific a te a fte r b uilding is finishe d
62
GLAZING PERCENTAGE
THE ONE MAIN CALCULATION FOR THE FAST TRACK METHOD
4/7/2015 63
- 124 perim x 18 (includes 2 band joists) = 2232 sq ft gross wall
- 16 windows x 15 sq ft = 240 sq ft
- 4 bmt windows x 4.5 sq ft = 18 sq ft
- Total window area = 258 sq ft
- 258 / 2232 = .116, or 11.6%
36’ 26’ 18’
Fast Track Method
FOUNDATION INSULATION
- F
- r ta b le s, b a se me nt wa ll insula tio n must e xte nd
fro m the to p o f the wa ll to the flo o r
4/7/2015 65
Fast Track Method
CRAWLSPACE INSULATION
- Ve nte d c ra wlspa c e :
- T
he flo o r a b o ve a ve nte d c ra wlspa c e must b e insula te d
- Must b e se pa ra te d fro m c o nditio ne d b a se me nt
- Unve nte d c ra wlspa c e w/ wa ll insula tio n:
- Wa ll insula tio n must g o fro m to p o f wa ll to a t le a st 12”
b e lo w g ra de
4/7/2015 66
Fast Track Method
CRAWLSPACE WALL INSULATION
4/7/2015 67
“a” must be 12” minimum (inside or
- utside frost wall)
a
Fast Track Method
SLAB-ON-GRADE FLOORS
- I
nsula tio n is re q uire d whe n to p o f sla b is:
- At o r a b o ve g ra de
- L
e ss tha n 12” b e lo w g ra de
- I
nsula tio n re q uire me nt a pplie s to wa lk o ut po rtio n o f c o nditio ne d b a se me nt (inc lude s unhe a te d b a se me nt b e lo w a n uninsula te d flo o r)
- I
nsula tio n de pth (o r to ta l o f de pth + width) must b e a t le a st 48”
4/7/2015 68
Fast Track Method
SLAB INSULATION--EXAMPLE 1
4/7/2015 69
“a” must be 48” (inside
- r outside frost wall)
a
Fast Track Method
SLAB INSULATION--EXAMPLE 2
4/7/2015 70
a+b must total 48” (other configurations possible)
a b
Fast Track Method
FLOORS
- I
f e xpo se d flo o r (o ve r o utdo o rs):
- Ce iling R-va lue s a pply
- I
f o ve r unc o nditio ne d spa c e (b a se me nt, c ra wl spa c e o r g a ra g e ):
- F
lo o r R-va lue s a pply
4/7/2015 71
Fast Track Method
ATTIC INSULATION AT THE EAVES
- T
a b le a ssume s diminishe d insula tio n a t e a ve s
- R-49 re q uire d
- I
f full R-va lue e xte nds to a b o ve o utside fa c e
- f e xte rio r wa ll, o nly R-38 re q uire d
4/7/2015 72
Fast Track Method
RAISED TRUSS EXAMPLES
4/7/2015 73
Raised heel truss Rigid foam Raised rafter (engineered)
Fast Track Method
OTHER CONDITIONS FOR TABLES
- 1% o f windo w a re a a nd up to o ne do o r e xe mpt
fro m U-va lue re q uire me nts
- Still must inc lude sq ua re fo o ta g e in g la zing pe rc e nta g e
- Allo ws use o f de c o ra tive windo w o r do o r
4/7/2015 74
Fast Track Method
FAST TRACK TABLE
4/7/2015 76
Fast Track Method
FAST TRACK TABLE – STRETCH CODE
4/7/2015 77
FAST TRACK: THINGS TO REMEMBER
Gla zing a re a pe rc e nt o f gr
- ss wa ll a re a
- Must a lso inc lude windo ws o f c o nditio ne d b a se me nt (e ve n
if the wa ll the y a re in is no t c o nsid e re d a b o ve -g ra de ) a nd skylig hts
F lo o rs o ve r o utside a ir use c e iling R-va lue Me e t c o nditio ns o f the ta b le
4/7/2015 78
Fast Track Method
SOFTWARE METHOD
Adva nta g e s
- E
a sy to try va ria tio ns, upda te c ha ng e s
- Re duc e s c a lc ula tio n time a nd e rro rs
- Use fo r wide va rie ty o f de sig ns
- Do -it-yo urse lf, with b a sic c o mpute r skills
- Ge ne ra te s re po rt a uto ma tic a lly
4/7/2015 79
DEFINITION: BUILDING ENVELOPE
- Co mpo ne nts tha t se pa ra te c o nditio ne d
spa c e s fro m o utdo o rs, o r fro m unc o nditio ne d spa c e s
4/7/2015 81
Sun room Basement 1st floor Garage 2nd fl
Software Method
MEASURING BUILDING COMPONENTS
- Gro ss wa ll a re a : e xte rio r dime nsio ns, inc luding windo ws
a nd do o rs; inc luding b a nd jo ists b e twe e n insula te d wa lls. I nc lude s slo pe s within 30 de g re e s o f ve rtic a l.
- Windo w, Skylig ht, Do o r: use ro ug h o pe ning size
- Ba se me nt wa lls: T
re a t e a c h wa ll se pa ra te ly. F
- r
c o nditio ne d b a se me nts, wa lls tha t a re mo stly a b o ve g ra de a re inc lude d with the o the r a b o ve -g ra de wa lls
4/7/2015 82
Software Method
BASEMENTS
- Conditione d -- he a te d b a se me nt, o r unhe a te d
b a se me nt b e lo w a n uninsulate d flo o r:
- F
- unda tio n wa lls must b e insula te d
- Duc ts a nd pipe s do no t ne e d insula tio n o r se a ling
- Unc onditione d -- unhe a te d b a se me nt b e lo w a n
insulate d flo o r:
- F
- unda tio n wa lls ne e d no t b e insula te d
- I
nsula te wa lls o f b a se me nt sta irs, sta irs to se c o nd flo o r
- I
nsula te duc ts a nd pipe s
4/7/2015 83
Software Method
MEASURING CONDITIONED BASEMENTS
- I
nc lude fo unda tio n wa lls tha t a re 50% o r mo re a b o ve g ra de with o the r e xte rio r wa lls
- F
- unda tio n wa lls tha t a re mo re tha n 50%
b e lo w g ra de , a re c o nside re d “b a se me nt wa lls” (lo we r R-va lue re q uire me nt)
- I
f the b a se me nt is c o nditio ne d, inc lude a ll windo ws a nd do o r a re a s fro m b a se me nt wa lls
4/7/2015 84
Software Method
WALKOUT BASEMENT EXAMPLE
- A, B a nd C a re “b a se me nt wa lls” (mo stly b e lo w g ra de )
- D is a dde d to “g ro ss wa ll a re a ” a nd insula te d a s suc h
- Sla b e dg e insula tio n is re q uire d fo r e xpo se d e dg e a t wa ll D
4/7/2015 85
Grade line Wall A Wall D (wood frame) Wall C Wall B
Software Method
86
SOFTWARE METHOD: THINGS TO REMEMBER
Use g ro ss c e iling a nd wa ll a re a s Diffe re nt R-va lue s within the sa me c o mpo ne nt type a re e nte re d se pa ra te ly I nc lude a ll b a se me nt windo ws a nd do o rs in a c o nditio ne d b a se me nt E nte r a c c e ss ha tc he s a s se pa ra te a re a s if R-va lue is diffe re nt fro m surro unding a re a
4/7/2015 88
Software Method
HOME ENERGY RATING
Adva nta g e s
- Hig h de g re e o f fle xib ility
- Ca lc ula tio ns do ne b y e ne rg y spe c ia list
- Give s c re dit fo r a ir se a ling a nd pa ssive so la r g a ins (c a n b e
e a sie r to pa ss)
Dra wb a c ks
- Co mple te b uilding de sig n re q uire d
Ca n pa y fo r the ra ting , b ut mo st a re do ne a s pa rt o f E ffic ie nc y Ve rmo nt’ s Re side ntia l Ne w Co nstruc tio n pro g ra m
4/7/2015 89
HOME ENERGY RATING: PROCESS
Se nd in ske tc h o r pla ns with dime nsio ns, fill o ut she e t with insula tio n, he a ting pla ns Re vie w re po rt, de c ide o n a ny c ha ng e s T wo inspe c tio n, o ne pre -drywa ll, o ne upo n c o mple tio n F ina l re po rt inc lude s e ne rg y c o de c e rtific a te , fille d o ut a nd re a dy fo r sig na ture
4/7/2015 90
THE CERTIFICATE
- Pro vide s:
- De ta ils a b o ut the ho use
- Builde r’ s wo rd tha t ho use
me e ts c o de
- F
ill o ut & file
- Po st in ho use , file with to wn,
c o py to sta te
4/7/2015 91
CERTIFICATION
- Ce rtific a te s a re a va ila b le fro m E
ne rg y Co de Assista nc e Ce nte r; o the rs a re a c c e pta b le if sub sta ntia lly simila r
- Must b e sig ne d a nd po ste d o n o r ne a r he a ting
- r c o o ling e q uipme nt o r e le c tric a l se rvic e pa ne l
- Co pie s must b e se nt to the De pa rtme nt o f
Pub lic Se rvic e , a nd re c o rde d in the to wn la nd re c o rds within 30 da ys o f c o mple tio n
4/7/2015 92
OWNER-BUILDER DISCLOSURE STATEMENT
- Ve ry simila r to c e rtific a te
- Must me e t c e rta in c o nditio ns to q ua lify
- Owne r must a c tua lly b e in c ha rg e o f c o nstruc tio n
- Owne r must live in b uilding
- Owne r must disc lo se no n-c o mplia nc e (with de ta ils) to
po te ntia l b uye r, a nd file Owne r/ Builde r Disc lo sure Sta te me nt with DPS a nd to wn la nd re c o rds within 30 da ys o f sa le
4/7/2015 93
SUMMARY -- WHAT’S REQUIRED?
- Ba sic Re q uire me nts
- Pe rfo rma nc e Re q uire me nts -- T
hre e Me tho ds
“F
a st T ra c k” Me tho d
So ftwa re Me tho d Ho me E
ne rg y Ra ting
- Ce rtific a tio n
4/7/2015 94
RESOURCES
- E
ffic ie nc y Ve rmo nt
- Re side ntia l Ne w Co nstruc tio n pro g ra m
- Ho me Pe rfo rma nc e with E
NE RGY ST AR
- Ve rmo nt Gre e n Ho me Allia nc e
- L
E E D fo r Ho me s, Ve rmo nt Builds Gre e ne r, Na tio na l Gre e n Building Sta nda rd, Pa ssive Ho use
4/7/2015 95
ENERGY CODE ASSISTANCE CENTER
- I
nfo rma tio n o n pro duc ts a nd te c hniq ue s
- Co pie s o f ha ndb o o k, c e rtific a te s, so ftwa re
- Re fe rra ls to o the r pro g ra ms
4/7/2015 96