THEME: Enabling Tomorrow’s Connected Infrastructure
Mieczyslaw (Mitch) Boryslawki Co-Founder Executive Director EcoDomus
1 – 2 November 2018 Novotel Amsterdam City, The Netherlands
THEME: Enabling Tomorrows Connected Infrastructure Mieczyslaw - - PowerPoint PPT Presentation
1 2 November 2018 Novotel Amsterdam City, The Netherlands THEME: Enabling Tomorrows Connected Infrastructure Mieczyslaw (Mitch) Boryslawki Co-Founder Executive Director EcoDomus BIM Cloud Worksharing for Integrated Project Delivery:
THEME: Enabling Tomorrow’s Connected Infrastructure
Mieczyslaw (Mitch) Boryslawki Co-Founder Executive Director EcoDomus
1 – 2 November 2018 Novotel Amsterdam City, The Netherlands
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Building Information Model (BIM)
Autodesk Revit, Bentley AECOsim, Graphisoft ArchiCAD, Tekla, IFCs
Geographical Information System (GIS)
ESRI ArcGIS, Google Maps , Oracle Spatial
Building Automation System (BAS)
Honeywell EBI, Siemens Apogee, Schneider Electric StruxureWare, OPC, BACnet, etc.
Maintenance Management (CMMS)
IBM Maximo, Oracle Unifier FMRE, FSI, TMA, AssetWorks, Anacle, etc.
Space Management (CAFM/IWMS)
Oracle Unifier, TRIRIGA, ARCHIBUS, Planon, Manhattan, etc.
Project Management (PM) Oracle Unifier, Procore, PMWeb Aconex, Prolog, e-Builder, etc. Enterprise Resource Planning (ERP)
Oracle Financials, SAP R/3, NetSuite, IFS, Microsoft Dynamics, Infor, etc.
Electronic Document Management Systems (EDMS) Documentum, Alfresco, Lascom, Autodesk A360, Aconex, ProjectWise, etc.
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Bi-Directional Transfer of Meta Data via API
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
iPaD EcoDomus Mobile Interface
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Smart Phone EcoDomus Mobile Interface
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Client Meta Data Delivery Requirements
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
A Living Lab. Exploring the Future of Buildings EMPA/NEST
Laser scan of the Mechanical Space
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
EMPA/NEST
Digital Model of the Mechanical Space
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
EMPA/NEST
Jump to any location within the building using viewpoints. See the real-time and historical values from the corresponding sensors.
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
55 742 M.Square
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
Laboratory Electrical Chillers HVAC Boilers IT
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
Existing Drawings Fabrication Models Laser Scanning Technical Documentations META DATA
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
Having the Exhaust System in BIM, separated into colored subsystems (subsystem 100 is purple, subsystem 200 is red), allows the Janelia Facilities Group to easily identify which parts of the system deliver air flow to specific spaces.
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
Having the Exhaust System in BIM, separated into colored subsystems (subsystem 100 is purple, subsystem 200 is red), allows the Janelia Facilities Group to easily identify which parts of the system deliver air flow to specific spaces.
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
Having the Exhaust System in BIM, separated into colored subsystems (subsystem 100 is purple, subsystem 200 is red), allows the Janelia Facilities Group to easily identify which parts of the system deliver air flow to specific spaces.
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
Balance of Details, Information and accuracy.
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
Saturating model with information to provide clear Data visualization
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
Interconnecting Model with P&ID Diagrams and sensors
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
Building Information Model (BIM) Environment Classic Database Integrated Database Ecosystem
PAST PRESENT FUTURE
Creating Robust Data Structure that can be utilized next 30 - 40 years.
Howard Hughes Medical Institute
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Illustrating Energy Control Procedures (ECP) documents When included in an ECP, this BIM of a chiller can help technicians in the field quickly locate and safely repair equipment.
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Howard Hughes Medical Institute
platform to provide value in operations and maintenance. Their BIM vision goes beyond transferring BIM data to computerized maintenance management software (CMMS) and integrated workplace management system (IWMS) platforms. Instead, (HHMI) creates and maintains FM-capable BIM, utilizes the models to solve
ways, including engineering analysis for heating, ventilation and air conditioning (HVAC), electrical and plumbing; building automation systems (BAS) analysis; operational impact analysis; and BIM-aided
Grace Wang, Mark Philip and Mark McKinley
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Grace Wang, Mark Philip and Mark McKinley
Driven by its BIM vision, the Facilities Group maintains a BIM strategic planning process to prioritize organizational goals and establish BIM
detailed planning process helps the Group achieve improved clarity of key BIM competencies and priorities. Janelia developed a BIM roadmap with actionable tasks and defined milestones. The Facilities Group is working on a Construction Operations Building information exchange (COBie)-based BIM and CMMS integration, as well as utilizing BIM for space management. The Group also is exploring shutdown scheduling via 4D simulation of shutdown impacts on related systems, asset management integration to enable asset allocation and tracking and visualization of condition assessment information.
BIM Cloud Worksharing for Integrated Project Delivery: BIM Integration with IoT sensors
Thank you. Questions?
Mieczyslaw (mitch) Boryslawki Co-Founder Executive Director EcoDomus mitch@ecodomus.com +14157067200 USA +48696203343 EU +971503491665 UAE