GENERAL INFORMATION
36" MIN. 18" 48" MIN. 66" MIN. 36" MIN. 18" 48" MIN. 56" MIN. 18" 60" MIN. 56" MIN. 33-36" 12" 12" 36" MIN. 36" MIN. 12" 54" MIN. 19" 33-36" 17-19" 36" 9"MIN. 27" MIN. 29" MIN. 34" MAX. 40" MAX. 30" 17" 4' 19" MAX. 30" 60" MIN. 48" MIN. 60" MIN. 75" MIN. 30" MIN. 15" 24" 33-36" 12" MAX. 12" MIN. 24" 33-36" 12" MAX. 9" 2'-6" 2'-4" MIN. MIN. MIN. MIN. MIN. MAX.
20
CLEAR FLOOR SPACE AT WATER CLOSETS
SCALE: 1/8" = 1'-0"
21
SCALE: 1/8" = 1'-0"
GRAB BARS AT WATER CLOSETS
23
SCALE: 1/8" = 1'-0"
LAVATORY CLEARANCES
22
SCALE: 1/8" = 1'-0"
MIN. MIN. CLEAR FLOOR SPACE
LAVATORY CLEARANCES
MIN. SEAT HEAD FOOT BACK SEAT SEAT
10
SCALE: 1/8" = 1'-0"
MIN. CONTROL AREA MIN. MAX. FOOT BACK HEAD MIN. CONTROL AREA FOOT BACK HEAD
CLEAR FLOOR SPACE AT BATHTUBS
11
SCALE: 1/8" = 1'-0"
GRAB BARS AT BATHTUBS WITH SEAT IN TUB
12
SCALE: 1/8" = 1'-0"
GRAB BARS AT BATHTUBS WITH SEAT AT HEAD OF TUB
4'-0" MINIMUM 4'-0" MINIMUM 2'-0" MIN. 2'-0" MIN. Y= 48" IF THE DOOR HAS A CLOSER Y= 54" IF THE DOOR HAS A CLOSER 60" DIAMETER SPACE 2'-6" 4'-0" PARALLEL APPROACH 5'-0" MIN 3'-0" MIN HAS BOTH A LATCH AND FOWARD APPROACH 4'-0" 2'-6" 4'-0" CLEAR FLOOR SPACE
Y OR 3'-6" MIN 4'-6" MIN.
2'-6" 5'-0" MIN 1'-0" MIN 3'-0" MIN 1'-0" MIN PUSH SIDE A CLOSER NOTE: PULL SIDE Y= 48" MINIMUM IF DOOR NOTE: NOTE: 4'-0" MINIMUM Y OR 4'-0" MIN 5'-0" MINIMUM 18" MIN 3'-6" MIN PULL SIDE PULL SIDE 24" PREFERRED 2'-0" MIN 4'-6" MINIMUM Y OR 3'-6" MIN 4'-0" MINIMUM X PUSH SIDE PUSH SIDE A CLOSER AND A LATCH X=12" IF THE DOOR HAS BOTH NOTE: 3'-6" MINIMUM
30
TWO HINGED DOORS IN SERIES
SCALE: N.T.S. (TYP. CONDITIONS)
31
SCALE: N.T.S. (TYP. CONDITIONS)
FRONT APPROACHES - SWINGING DOORS
32
SCALE: N.T.S. (TYP. CONDITIONS)
LATCH-SIDE APPROACH SWINGING DOORS
33
SCALE: N.T.S. (TYP. CONDITIONS)
HINGE-SIDE APPROACH - SWINGING DOORS
40
SCALE: N.T.S. (TYP. CONDITIONS)
T-SHAPED SPACE FOR 180° TURNS
41
SCALE: N.T.S. (TYP. CONDITIONS)
- MIN. CLEAR FL. SPACE FOR WHEELCHAIRS
43
SCALE: N.T.S. (TYP. CONDITIONS)
FRONT APPROACH - SLIDING & FOLDING DOORS
42
SCALE: N.T.S. (TYP. CONDITIONS)
LATCH-SIDE APPROACH - SLIDING & FOLDING DOORS
44
SCALE: N.T.S. (TYP. CONDITIONS)
SLIDE-SIDE APPROACH - SLIDING & FOLDING DOORS
METAL THREADED INSERTS TO RECEIVE SCREWS SPECIAL REMOVABLE CABINET FRONT, FLOOR & BASE CARRY FLOOR CABINET, AND WALL FINISHES UNDER & BEHIND REMOVABLE CABINET.
45
SCALE: N.T.S. (TYP. CONDITIONS)
KITCHEN SINK & REMOVABLE BASE CABINET
18" 18" 42" MIN. 42" MIN. 24" 24" 48" MIN. 15" MAX.
ALL PUBLIC HALLS SHALL BE KEPT FREE AND CLEAR OF ALL DUST, DEBRIS, REFUSE, CONSTRUCTION MATERIALS AT ALL TIMES CONSTRUCTION OPERATIONS WILL NOT INVOLVE INTERRUPTION OF HEATING, WATER, OR ELECTRICAL SERVICES TO OTHER TENANTS OF THE BUILDING WITHOUT REQUIRED NOTICE INSTALL ALL BARRICADES, SIGNS SCAFFOLDING, TEMPORARY LIGHTING, ETC. AS NEEDED. ALL EXITS AND ACCESS AREAS TO BE MAINTAINED FREE AND CLEAR AT ALL TIMES. GENERAL: ALL WORK TO BE IN ACCORDANCE WITH THE NEW YORK CITY BUILDING CODE, ARTICLE 19 AND REGULATIONS OF ALL OTHER AGENCIES HAVING JURISDICTION. FIRE SAFETY:
- A. ALL BUILDING MATERIALS WHICH ARE STORED AT THE
SITE OR ANY AREA OF THE BUILDING ARE TO BE STORED IN A LOCKED AREA ACCESS TO WHICH TO BE CONTROLLED BY THE OWNER AND OR THE GENERAL CONTRACTOR.
- B. ALL MATERIALS TO BE STORED IN AN ORDERLY FASHION.
- C. ALL FLAMMABLE MATERIALS TO BE USED AND STORED
IN AN ADEQUATELY VENTILATED SPACE.
- D. ALL FLAMMABLE MATERIALS TO BE KEPT TIGHTLY
SEALED IN THEIR RESPECTIVE MANUFACTURER'S
- CONTAINERS. SUCH MATERIALS ARE TO BE KEPT
AWAY FROM HEAT.
- E. ALL ELECTRICAL POWER TO BE SHUT OFF WHERE
THERE ARE EXPOSED CONDUITS.
- F. ALL ELECTRICAL POWER IN THE CONSTRUCTION
AREA TO BE SHUT OFF AFTER WORKING HOURS.
- G. CONTRACTOR TO ENSURE AT ALL TIMES THAT
THERE IS NO NATURAL GAS LEAKAGE IN THE BUILDING OR IN ANY FLAMMABLE GAS USED DURING CONSTRUCTION. DUST CONTROL:
- A. DEBRIS, DIRT AND DUST TO BE KEPT TO A MINIMUM AND
TO BE CONFINED TO THE IMMEDIATE CONSTRUCTION AREA.
- B. CONTRACTOR TO ISOLATE CONSTRUCTION AREA FROM
OCCUPIED BUILDING AREA BY MEANS OF TEMPORARY PARTITIONS OR HEAVYWEIGHT DROPCLOTHS.
- C. DEBRIS, DIRT AND DUST TO BE CLEANED UP AND
CLEARED FROM THE BUILDING SITE PERIODICALLY TO AVOID EXCESSIVE ACCUMULATION. NOISE AFTER HOURS
- A. CONSTRUCTION OPERATIONS WILL BE CONFINED TO
NORMAL WORKING HOURS; 8 AM TO 5 PM, MONDAY TO FRIDAY EXCEPT LEGAL HOLIDAYS.
- B. CONTRACTOR MUST OBTAIN WRITTEN PERMISSION
FROM ALL AFFECTED PARTIES TO WORK OTHER THAN REGULAR HOURS. CONSTRUCTION WILL BE CONFINED TO THE APARTMENT INTERIOR AND WILL NOT CREATE DUST, DIRT OR OTHER SUCH INCONVENIENCES TO THE OTHER APARTMENT UNITS WITHIN THE BUILDING THERE WILL BE NO ONE OCCUPYING THE PREMISES TO BE RENOVATED DURING THE COURSE OF CONSTRUCTION. 11. 10. 9. 6. 5. 4. 3. 2. 1. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
GENERAL CONSTRUCTION NOTES
TENANT SAFETY NOTES BUILDING DEPARTMENT NOTES
2. 3. 4. 5. 6. 7. 8. 9. ALL WORK SHALL COMPLY WITH ALL APPLICABLE BUILDING, PERFORMANCE AND FIRE SAFETY CODES. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE NEW YORK CITY BUILDING CODE FIRE DEPARTMENT REGULATIONS, UTILITY COMPANY REQUIREMENTS AND THE BEST PRACTICES. ALL EXIT DOORS TO BE INCOMBUSTIBLE ALL WOOD TO BE FIREPROOF, AS PER SECTION C-26-502.6, C-26-1901.3b (3) TABLE 3-5 ALL MATERIALS, ASSEMBLIES AND FORMS, METHODS OF CONSTRUCTION AND SERIES EQUIPMENT SHALL MEET THE FOLLOWING REQUIREMENTS:
- A. IS ACCEPTABLE FOR USE BY THE NYC BUILDING LAWS
- B. HAS BEEN ACCEPTED FOR USE BY M.E.A. OR UNDER TEST
METHODS APPROVED FOR USE BY THE COMMISSION OF BUILDINGS.
- C. HAS BEEN APPROVED FOR USE BY THE BOARD OF
STANDARDS APPEALS. ALL INTERIOR FINISHES SHALL COMPLY WITH THE REQUIREMENTS OF THE NYC BUILDING LAWS, SECTION C26-504.10 REGARDING FLAME SPREAD RATING, SMOKE DENSITY, TOXICITY, ETC.... THE SPACE AROUND CONDUIT PIPES, ETC, PENETRATING CONCRETE SLABS SHALL NOT EXCEED 1 /2" AND SHALL BE PACKED SOLID WITH APPROVED FIRESTOP SEALANT OR APPROVED MATERIAL, AS REQUIRED BY NYC BUILDING LAWS C26-504.5 (24-343). ALL FLOOR/WALL PIPING, ELECTRICAL RO HVAC PENETRATIONS MUST BE FIRESTOPPED. 10. FIRESTOPPING SHALL BE AS REQUIRED BY NYC BUILDING LAWS, SECTION C26-502.7 ALL WOODWORK TO BE FIRE RETARDANT, AS PER NYC BUILDING LAWS, SECTION C26-502.6 BATHROOM FLOOR AREA TO BE MECHANICALLY VENTILATED, AS PER ARTICLE 12, ARTICLE B AND RS-13
SPECIAL & PROGRESS
THE FOLLOWING CONTROLLED INSPECTIONS ARE REQUIRED. ALL CONTROLLED INSPECTIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE ADMINISTRATIVE CODE. ALL CONTROLLED INSPECTIONS SHALL BE PERFORMED BY A LICENSED PROFESSIONAL OR A QUALIFIED PERSON REPRESENTING HIM AND APPROVED BY THE ARCHITECT OF RECORD. 2. FINAL INSPECTION DIRECTIVE 14
SMOKE DETECTOR
EACH DWELLING SHALL BE EQUIPPED WITH AN APPROVED TYPE SMOKE DETECTOR DEVICE RECEIVING PRIMARY POWER FROM THE BUILDING WIRING W/ NO SWITCHES IN THE CIRCUIT OTHER THAN THE OVER CURRENT DEVICE PROTECTING THE BRANCH CIRCUIT AS PER SECT. C26-1705.3. SUCH SMOKE DETECTOR MUST BE EITHER THE IONIZATION CHAMBER TYPE OR THE PHOTOELECTRIC DETECTOR TYPE AS PER SECT. C26-1705.3. ALL SMOKE DETECTORS MUST BE INSTALLED WITHIN 15'-0" OF THE ENTRANCE TO ANY SLEEPING ROOM - WALL OR CLG. MTD. AND INDICATED ON PLAN AS PER NFPD #74-1980. A "CERTIFICATE OF SATISFACTORY INSTALLATION FOR SMOKE DETECTORS" MUST BE FILED WITH THE DIVISION OF CODE ENFORCEMENT HPD 10 DAYS AFTER THE INSTALLATION. 12. 13. MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER CONSTRUCTION OF ANY PARTS OF THE WORK SHALL BE INCLUDED AS IF THEY WERE INDICATED IN THE DRAWINGS. THE CONTRACTOR SHALL COORDINATE ALL WORK PROCEDURES WITH REQUIREMENTS OF LOCAL AUTHORITIES AND BUILDING MANAGEMENT. SHUT DOWN OF THE BUIDLING SYSTEMS, IF NECESSARY, SHOULD BE COORDINATED WITH MANAGEMENT AND THE BUIDLING SUPERINTENDENT, AT LEAST 5 DAYS IN ADVANCE THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL CONDITIONS AND MATERIALS WITHIN THE PROPOSED CONSTRUCTION AREA. THE CONTRACTOR SHALL DESIGN AND DETAIL ADEQUATE SHORING AND BRACING FOR ALL STRUCTURAL OR REMOVAL TASKS. THE CONTRACTOR SHALL HAVE SOLE RESPONSIBILITY FOR ANY DAMAGE OR INJURIES CAUSED BY AND DURING THE EXECUTION OF THE WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING THE WORK, AND SHALL REPORT ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS TO THE ARCHITECT. THE CONTRACTOR SHALL LAY OUT HIS OWN WORK, AND SHALL PROVIDE ALL DIMENSIONS REQ'D. FOR OTHER TRADES (PLUMBING, ELECTRICAL, ETC.) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING ALL LINES, GRADES AND BENCHMARKS NECESSARY FOR THE PROPER WORK, ALL GIVEN SURVEY DATA SHALL BE VERIFIED BY THE CONTRACTOR. 7. PLUMBING AND ELECTRICAL WORK SHALL BE PERFORMED BY PERSONS LICENSED IN THEIR TRADES, WHO SHALL ARRANGE FOR AND OBTAIN INSPECTIONS OF REQUIRED SIGN-OFFS. 8. THE CONTRACTOR SHALL DO ALL CUTTING, PATCHING, REPAIRING AS REQUIRED TO PERFORM ALL THE WORK INDICATED ON THE DRAWINGS, AND ALL OTHER WORK THAT MAY BE REQUIRED TO COMPLETE THE WORK. ALL PIPING AND WIRING SHALL BE REMOVED TO THE POINT OF CONCEALMENT AND SHALL BE PROPERLY CAPPED OR PLUGGED. REFER TO SPECIFICATIONS FOR ADDITIONAL CONTRACT REQUIREMENTS. IN THE CASE OF DISCREPANCIES BETWEEN DRAWINGS AND SPECIFICATIONS, THE MORE STRINGENT CONDITIONS SHALL APPLY. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. NO CHANNELING OF ANY STRUCTURAL SLAB, DEMISING WALLS AND EXTERIOR WALLS OR PIPE CHASE / SHAFT ENCLOSURE WALLS WILL BE PERMITTED DURING THE COURSE OF ANY WORK. NO REMOVAL OF MASONRY BACK UP MATERIAL AT EXTERIOR OR SHAFT WALLS IS PERMITTED FOR INSTALLATION OF JUNCTION BOXES, ETC. 14. NO REDUCTION IN THE FIRE-RATING OF THE COLUMN ENCLOSURES WILL BE
- PERMITTED. (IF ANY FIREPROOFING IS DISTURBED IT MUST BE REPLACED.)
15. NO OFFSET OF RISERS (PLUMBING, GAS, ETC.) WILL BE PERMITTED. 16. ACCESS TO RISER SHUT-OFFS MUST BE MAINTAINED. 17. ACCESSIBILITY COMPLIANCE: ALL NEW RENOVATION WORK SHOULD COMPLY WITH THE 2008 NYC BUILDING CODE REQUIREMENTS IN CHAPTER 11, APPENDIX P AND ANSI/ICC A 117.1. 18. ALL PLUMBING WORK WILL BE DONE BY A NEW YORK CITY LICENSED PLUMBER AND ALL ELECTRICAL WORK BY A NEW YORK CITY LICENSED ELECTRICIAN. 19. ALL VENT OPENINGS TO BE SEALED DURING CONSTRUCTION TO PREVENT CARRY OVER OF DUST TO OTHER TENANCIES.
PROJECT INFORMATION
DRAWING LIST 01 G-100.00 GENERAL INFORMATION 02 DM-100.00 DEMO PLAN 03 A-100.00 PROPOSED PLAN 04 A-200.00 DETAILS/ RISER DIAGRAM 05 X-001.00 LANDMARKS 06 X-002.00 LANDMARKS 07 EN-100.00 ENERGY ANALYSIS/ ELECTRICAL PLAN 1. 2. 3. 4.
CARBON MONOXIDE NOTES
CARBON MONOXIDE SHALL COMPLY WITH RS 17-13 AND INSTALLED IN ACCORDANCE WITH RS 17-14. IT SHALL BE PROVIDED IN EVERY DWELLING UNIT WITHIN FIFTEEN FEET OF THE PRIMARY ENTRANCE OF EACH BEDROOM 5.
BLOCK PLAN
SCALE: NTS
ZONING MAP
SCALE: NTS
40-02 44TH STREET SUNNYSIDE QUEENS NY 11104
2008 NYC BUILDING CODE TENANT PROTECTION PLAN
ALL UNITS IN THE BUILDING WILL REMAIN OCCUPIED DURING CONSTRUCTION 1. ALL REQUIRED RATINGS WILL BE MAINTAINED DURING CONSTRUCTION AND NO TEMPORARY FIRE WALLS WILL BE REQUIRED. ALL WORK IS TO BE CONFINED WITHIN THE APARTMENT. 2. DUST WILL BE KEPT TO A MINIMUM AS WORK WILL BE CONFINED WITHIN THE APARTMENT. CLEAN UP WILL OCCUR AT THE END OF EACH WORK DAY BY THE GENERAL CONSTRACTOR. 3. ALL REQUIRED EGRESS WILL BE MAINTAINED AT ALL TIMES WITH NO OBSTRUCTIONS. NO MODIFICATION TO EGRESS WILL BE REQUIRED FOR THIS PROJECT. 4. ANY EXISTING FIRE PROTECTION ELEMENTS WILL BE MAINTAINED. 5. HEALTH REQUIREMENTS SPECIFIED IN THE 2008 CODE WILL BE COMPLIED WITH. 6. ALL WORK WILL COMPLY WITH ALL APPLICABLE LAWS RELATING TO ASBESTOS AND LEAD PAINT REMOVAL. 7. ALL WORK WILL COMPLY WITH ALL APPLICABLE PORTIONS OF NYC, HMC, AND NYC MDL. 8. NO STRUCTURAL WORK SHALL BE DONE THAT MAY ENDANGER THE OCCUPANTS. 9. NOISE LEVELS WILL COMPLY WITH ALL APPLICABLE ASPECTS OF NOISE CONTROL CODE 10.
INSPECTION NOTES
20. REMOVAL OF CONCRETE FIREPROOFING AT EXISTING STRUCTURAL BEAMS AND COLUMNS IS TO BE AVOIDED. 21. ANY STRUCTURAL STEEL BEAMS AND COLUMN EXPOSED DURING THE OUCRSE OF THE WORK MUST BE FIREPROOFED REGARDLESS OF THEIR HAVING BEEN PREVIOUSLY FIREPROOFED. 22. THE INTERIOR FACE OF ALL EXPOSED EXTERIOR MASONRY WALLS MUST BE DAMP PROOFED PRIOR TO INSTALLATION OF NEW WALL FINISHES. 1. ENERGY CODE COMPLIANCE INSPECTION (TR-8) BLOCK: 182 LOT: 106 BUILDING OCCUPANCY: R4 - RESIDENTIAL, PLANNED COMMUNITY PRESERVATION BUILDING USE: USE GROUP 2 CONSTRUCTION CLASSIFICATION: 1; FIREPROOF ZONING MAP: 9B ZONING DISTRICT: R4 PROJECT ADDRESS: BETH LIEBERMAN GENERAL ZONING INFORMATION SIGNATORY.: BETH LIEBERMAN CLIENT/ SHAREHOLDER: CONTACT: 40-02 44TH STREET QUEENS NY 11104
G-100.00
PLOT PLAN SCALE: NTS
TR-1: SPECIAL & PROCESS INSPECTION ITEMS: TR-8: ENERGY CODE COMPLIANCE INSPECTION ITEMS:
TENANT SAFETY NOTES CONT.
THIS PROPERTY IS NOT WITHIN A SPECIAL FLOOD HAZARD AREA AND NOT SUBJECT TO FLOOD ZONE REGULATIONS
40-02 44TH STREET SUNNYSIDE QUEENS, NY 11104
UPDATED FEMA FLOOD HAZARD DATA FEMA FLOOD HAZARD DATA CURRENTLY AVAILABLE FOR COASTAL AREAS OF NEW YORK AND NEW JERSEY IS PROVIDED BELOW TO HELP YOU UNDERSTAND THE CURRENT FLOOD RISK TO YOUR PROPERTY AND TO GUIDE SANDY RECOVERY AND REBUILDING EFFORTS. NOTE: THIS TOOL PROVIDES FLOOD ZONE AND BASE FLOOD ELEVATION (BFE) INFORMATION FOR AREAS AFFECTED BY COASTAL FLOOD RISK. HOWEVER, RIVERINE FLOOD ZONE INFOMRATION WILL ALSO BE RETURNED BY THE TOOL INCOMMUNITIES WHERE PRELIMINARY FIRMs HAVE BEEN RELEASED.
ATTRIBUTE NAME ATTRIBUTE VALUE WHAT IS THE MOST RECENT FEMO FLOOD HAZARD DATA SOURCE AVAILABLE FOR THIS LOCATION PRELIMINARY FLOOD INSURANCE RATE (FIRM) WHAT IS MY PROPERTY BASE FLOOD ELEVATION (BFE)? N/A WHAT IS MY PROPERTY FLOOD ZONE? N/A WHAT IS MY ESTIMATED GROUND ELEVATION AT THIS LOCATION? 59 - 60 ft (NAVD88)
NEW YORK CITY PRELIMINARY FIRM MAP (2013)
1.
NEW YORK CITY FIRM MAP (2007)
THIS MAP PRINT OUT IS INTENDED FOR INFORMATIONAL PURPOSES. PRELIMINARY FLOOD INSURANCE RATE MAP PANEL COLLECTED FROM FEMA MAPS SERVICE CENTER.
MECHANICAL SYSTEMS 3. 40-02 44TH STREET BLOCK:182 LOT:106 FIRESTOP, DRAFTSTOP, AND FIREBLOCK SYSTEMS 4. LIGHT IN DWELLING UNITS LIGHTING CONTROLS 2. 3. 4. 5. HVAC AND SERVICE WATER HEATING EQUIPMENT HVAC AND SERVICE WATER SYSTEM CONTROLS AIR SEALING AND INSULATION- VISUAL INSPECTION 40-02 44TH STREET QUEENS NY 11104 (347) 731-3247