Main Access to avoid coming through new estate. Access via the Stanway Western bypass Communication with local residents via social media, letter drops and site clinics. Deliveries to be co-ordinated with Lovell who are


slide-1
SLIDE 1

Pedestrians Site Welfare All construction traffic Works Boundary Outline of site

New 2FE Primary School Lakelands, Colchester

Drg No: BCE 4540 /001 Proposed Site Layout

Traffic Routes & Segregation

  • Main Access to avoid coming through

new estate. Access via the Stanway Western bypass

  • Communication with local residents

via social media, letter drops and site clinics.

  • Deliveries to be co-ordinated with

Lovell who are constructing the neighbouring development

  • Delivery size to be limited due to tight

access road

slide-2
SLIDE 2

School users/pedestrians Site Welfare All construction traffic Works Boundary Selwyn Access Points Hazard (neighbouring site)

Access & Egress to site

Traffic Routes & Segregation

Construction Traffic access via newly constructed road Site Welfare units with controlled pedestrian and visitor access to site. Early construction of material lay down and site parking to mitigate impact

  • n local roads, parking and

general access Regular dialogue with local contractors constructing residential areas around the school, particularly with reference to utilities works and road construction

New 2FE Primary School Lakelands, Colchester

Drg No: BCE 4540 /002

slide-3
SLIDE 3

Access & Egress to site

Site Welfare

Prior to starting on site, we will register the project with Considerate Constructors. We will ensure that the site boundaries are robust, clean and signage clearly denotes access, egress and contact details for the site team. Our sites are tidy, clean and crucially a safe environment for work. Site Frontage & pedestrian entrance. All visitors to sign in and be inducted in Site Welfare.

New 2FE Primary School Lakelands, Colchester

Drg No: BCE 4540 /003

slide-4
SLIDE 4

Construction Zones

  • Clear signage to be installed.
  • Muster & Fire Points

reviewed and adapted as project develops

  • Site welfare to remain in

same area

  • Regular engagement with

neighbours and contractors

  • All vehicles entering school

will be escorted to their designated places of work

  • Vehicle size limited where

possible to mitigate effects

  • n local environment
  • Term dates to be confirmed

New 2FE Primary School Lakelands, Colchester

Drg No: BCE 4540 /004 Narrow access road (Wagtail Mews) Main Access to Site Via Wagtail Mews