Trencher Improvements Critical Design Review Corp 10 Fall 2010 - PowerPoint PPT Presentation
USDA Subsurface Banding Implement Soil Trencher Improvements Critical Design Review Corp 10 Fall 2010 Christina Locklear Alex Peterson Alex Scammell Patrick Smyth Matt Turberville Outline Mission Objective Architectural Design
USDA Subsurface Banding Implement Soil Trencher Improvements Critical Design Review Corp 10 – Fall 2010 Christina Locklear Alex Peterson Alex Scammell Patrick Smyth Matt Turberville
Outline • Mission Objective • Architectural Design • Bill of Materials • Comprehensive Analysis • Questions
“The Trencher” Direction of travel Way, Thomas et al. “Applicator System and Method for the Agricultural Distribution of Biodegradable and Non- Biodegradable Materials.” Patent 7,721,662 B2. 25 May 2010
Mission Objective • Litter Application Component: “To improve or redesign the walls of the poultry litter implement so that litter can be more effectively distributed to the soil, mitigating the clogging that currently occurs during normal operation” • Dirt Recovery Component “To improve or replace the current press -wheel system used on the implement for dirt recovery so that the extricated soil is more effectively replaced over the deposited litter band”
Architectural Design • Final Concept
Architectural Design • Trencher Wall
Architectural Design • Soil Recovery Device
Bill of Materials • Trencher Wall - Parts $ 38.40 - Labor $ 70.00 • Soil Recovery Device - Parts $ 54.06 - Labor $ 140.00 Grand Total $ 302.46
Comprehensive Analysis • Trencher Wall Pressure Measurement • Trencher Wall ANSYS Analysis • Dirt Recovery Mechanism Analysis
Trencher Wall Pressure Analysis Trencher Wall http://content.honeywell.com/sensing/sensotec/pdf_catalog08/008602-1-EN_Model_F.pdf
Trencher Wall Pressure Analysis Oktibbeha Clay Soil, First Run (PASS1.ASC. Data collected 11/5/2010) 45 40 35 P1_Front 30 Pressure (psi) P2_2nd 25 20 P3_3rd 15 P4_Rear 10 5 0 -5 -10 752 753 754 755 756 757 758 759 760 761 762 763 764 765 Time (s) 4 3 2 1
Trencher Wall ANSYS Analysis Mesh • Brick 8Node45 Tetrahedral Boundary Conditions • Structural Displacement • Pressure on Bent Area Pressure • 15 and 30 psi
Trencher Wall ANSYS Analysis Results • 15 psi → 0.091 in deflection • 30 psi → 0.202 in deflection
Preliminary Analysis • Dirt Recovery Mechanism FBD Analysis Component TRENCHER WALL F x = ma x F T2 F y = 0 F 21 M CB = 0 1 2 R Use MATLAB to solve force F G equations and find shear F F stress on pivots F W F B F 12
Conclusions • Redesigned Trencher Walls – Increase thickness to ¼ inch, flare outward at 10 degrees – As proven by ANSYS, deflection will not inhibit poultry litter flow • Soil Recovery Component – Maximum shear in pivots is 14 lbs – Materials chosen are sufficiently strong for intended application
Questions?
Recommend
More recommend
Explore More Topics
Stay informed with curated content and fresh updates.