Tyrol Hill Park
Phase 4
Tyrol Hill Park Phase 4 Elementary Campbell Elementary Campbell - - PDF document
Tyrol Hill Park Phase 4 Elementary Campbell Elementary Campbell Park Spaces Open Park Spaces Open Park Spaces Paths Park Spaces Paths Park Spaces Paths Park Spaces Woods Park Spaces Gathering Space Park Spaces Entrance Park
Phase 4
Campbell Elementary
Campbell Elementary
Open
Open
Paths
Paths
Paths
Woods
Gathering Space
Entrance
Courts
Playground
Shelter
Mobile Recreation Van
Phase 4
“ We have a missed opportunity here to have proper water conservation, educational
needs of open green space for
accomplish this and there has got to be a better solution.”
Rocky Run Park
“ Add a second pavilion and picnic tables with barbecue grill stations.”
“ S
even if you get rid of sand volleyball court. I see more kids use it as a sandbox than for
green space next to court usable. Right now the ditch interferes with that stretch of space.”
Restroom………………………………………...30% Stormwater Management……………………...15% Picnic Shelter……………………………………10% Plaza……………………………………………..10% Athletic Equipment……………………………...10% Landscaping…..…………………………………10% Pathways………………………………………...8% Site Furnishings…………………………………7% Construction Budget: 1.2 Million
Conceptual Design/Public Engagement April 2016 Construction Drawings Spring/Summer 2016 Project Out to Bid Fall 2016 Award Contract Fall 2016 Start Construction Spring 2017 End Construction Winter 2017