SLIDE 3 3
Distribution Statement A: Approved for Public Release; Distribution Unlimited. This Brief is provided for Information Only and does not constitute a commitment on behalf of the U.S. government to provide additional information and / or sale of the system.
Notional UMV Plan
FY16 FY17 FY18 FY19 FY20 FY21 FY22 Knifefish AUP/ XLUUV
XLUUV design/fab UUV Supporting Technologies (energy, payloads, C2)
LDUUV RMMV AQS-20
MHU Operations in 5th Fleet MHU 5 & 6 - build
MHU
CUSV+Sweep
(UISS)
U
S
V U U V
CUSV MCM
EDM/Payload Construction & Testing UOES Deploy IRT Decision Point Block 2 Production IOC TECHEVAL/ IOT&E Integration, DT/OA IOT&E MS C IOC,FRP
5 6 3 4 EDMs
Operations MS C IOC EDM Construction LRIP Construction IOT&E FRP
4 4 4 6
Gate 4 ADM PD Assess CD Assess Phase 1 Design Phase 1 Fab PDR Test Phase 2 Design Phase 2 Fabrication CDR MUA EDM Dev IRT Decision Point
Extended Range Knifefish (TREK)
Int & Test Deploy UOES
SBD Initiation
Mission Opportunity V6.0 Upgrades
Prep / LCS Deployment
IRT Decision Point DT&OA Depot Overhauls
6 6 3 6
FRP