Updated on reconstruction of ProtoDUNE – DP data
Vyacheslav Galymov IP2I Lyon
Updated on reconstruction of ProtoDUNE DP data Vyacheslav Galymov - - PowerPoint PPT Presentation
Updated on reconstruction of ProtoDUNE DP data Vyacheslav Galymov IP2I Lyon Matching in 3D problem Have been using the proper PDDP geometry, i.e., with the drift along Y and 3D matching was not failing completely (0 matchted
Vyacheslav Galymov IP2I Lyon
Y and 3D matching was not failing completely (0 matchted clusters between views)
matching started to work
is Y for DP with normal drift orientation
coordinate is not correct unless the rotated geometry of ProtoDUNE DP is used (with drift in X)
numbering (Geometry/gdml/generate_protodunedphase_v2.pl)
2
3
e drift along is along X which is horizontal axis
Cryogenics Entrance DOOR HV FT 1 10
CRP1 CRP2 CRP4 (anodes 2x2)
1 2 3 4 5 6 7 8 9 10 10 11 11 12 12
Z Origin Y is up
Many trajectories are broken up (missing hits, LEM borders … ) Visually could identify a number
assigned to the wrong track in the other) To be optimized
4
View X View Z These channels would be masked by ChannelStatus, but there would also be a gap on otherwise active channels in the
dead space
5
6
These channels are masked by channel status service In this view, the gap is too large and the track is broken
(drift along X)
effects
between views
LEM gain
never part of the simulation
implemented
7