Updates on the FBK and HPK SiPMs and summary of the meeting in - - PowerPoint PPT Presentation

updates on the fbk and hpk sipms and summary of the
SMART_READER_LITE
LIVE PREVIEW

Updates on the FBK and HPK SiPMs and summary of the meeting in - - PowerPoint PPT Presentation

Updates on the FBK and HPK SiPMs and summary of the meeting in Milano-Bicocca Francesco Terranova PDS Consortium meeting 14 Jan 2020 More details in: A. Montanari, F. Terranova, Planning for the SiPM tests in the DUNE pre-production phase


slide-1
SLIDE 1

Updates on the FBK and HPK SiPMs and summary of the meeting in Milano-Bicocca

Francesco Terranova PDS Consortium meeting 14 Jan 2020

More details in: A. Montanari, F. Terranova, “Planning for the SiPM tests in the DUNE pre-production phase” to appear in docdb

slide-2
SLIDE 2

Hamamatsu (HPK)

  • Order for the production of four splits (25 sensors per split)

funded by the University of Milano-Bicocca and placed in October OK

  • Order for the production of 250 sensors per split funded by the

Czech DUNE group. Placed at CERN OK

  • Frequent contacts between DUNE and Hamamatsu Japan

(through the Italian and US HPK branches) to define the details of the splits. Completed in Dec 2019. OK

  • Delivery date: officially confirmed by HPK on 23 Dec 2019: the

25 sensors of the four splits will be delivered in the first half

  • f April
  • 250 sensors: TBD (most likely in June)

2

slide-3
SLIDE 3
  • All splits will be based on the S13360 chip (Vbk = 50 V

at 300 K), terminal capacitance 1.28 nF per sensor, 61.4 nF per 48 sensors.

  • All splits will be based on the HWB technology
  • Packaging:

we asked HPK to perform a thermomecanical study on epoxy versus silicon resin (see below). Results indicate that silicon resin is slightly

  • better. We chose silicon resin.
  • Cell pitch: 50 and 75 mm

[already fixed in July]

  • Quenching resistance:

HQR= 4 LQR.

The four HPK spilts:

3

slide-4
SLIDE 4
  • Order for the production of twelve wafers (about 3000 sensors in

total) funded by INFN and placed OK

  • This order include the packaging of 25 sensors per split for early

tests and 250 sensors per split for the reliability tests OK

  • Frequent contacts between DUNE and FBK to define the details
  • f the splits. Decision taken in Dec 2019. OK
  • “Standard DUNE split”: 30 mm cell pitch, 6x6 mm2 sensors in

NUV-HD-Cryo. Packaging: epoxy resin in SMD package. Most conservative option (DarkSide-like) fulfilling all DUNE specs

  • “Triple trench split” 50 mm, low cross-talk due to additional SiO2

trenches.

  • To save time and validate the full chain, the wafer will be

produced by LFoundry (subcontractor of FBK), as for the DUNE mass production.

FBK

4

slide-5
SLIDE 5

FBK

Delivery schedule: Wafer production: january-march Packaging of 25 sensors per split in FBK at single SiPM level: April. Delivery of 250 sensors: TBD, most likely in June In a nutshell: both FBK and HPK can provide the 25 sensors per split in time for the 60% readiness review (end of May)

5

slide-6
SLIDE 6

Meeting in Milano-Bicocca

On Dec 12-13, we held in Milano-Bicocca the first meeting of all European groups involved in the PDS. We put special emphasis

  • n the activities that may be carried on in Spain (Madrid, Valencia

and Granada), which joined the Consortium very recently. Aim of the workshop:

  • Provide a general overview of the status of the PDS and

especially photosensors, cold electronics, warm electronics, integration

  • Prepare for the characterization of the splits (see above) and

the sharing of the responsibilities

  • Distribute information on the cold electronics in order to set up

standards for

  • The characterization of the splits
  • The optimization of the cold electronics for FBK and HPK

6

slide-7
SLIDE 7
  • Distribute information on the mechanics of the modules to

prepare the design of the SiPM board and signal lead board

  • Discuss integration issues and start the process to identify the

engineer in charge of integration Outcome:

7

slide-8
SLIDE 8

Contents:

  • Identification of the measurements for the 25 sensor split and

sharing of the samples

  • Standardization
  • f

the procedure for cooling and characterization (instruments and precision)

  • Identification of the measurements for the 250 sensor splits

(mostly I-V curves and thermal tests in sensors directly embedded in the SiPM board developed by Milano-Statale)

  • Ganging tests with sensors in catalog (e.g. S13360 TSV – Spain
  • or S14160 in HWB – Italy) while waiting for the DUNE splits
  • Test of final configuration and of a full X-Arapuca by summer
  • Test of a half-module by the 90% readiness review

We plan to discuss all these items in a dedicated session (PDS-photosensors) at the next Collaboration Meeting

8