US 27 at SR 60 Interchange Polk County 1 2 Project Overview - - PowerPoint PPT Presentation

us 27 at sr 60 interchange
SMART_READER_LITE
LIVE PREVIEW

US 27 at SR 60 Interchange Polk County 1 2 Project Overview - - PowerPoint PPT Presentation

US 27 at SR 60 Interchange Polk County 1 2 Project Overview Single Point Urban US 27 Limits: Interchange Lake Altamaha to CSX Railroad crossing north of Central Ave. SR 60 Limits: Central Ave. to Martin Luther King Blvd.


slide-1
SLIDE 1

US 27 at SR 60 Interchange

Polk County

1

slide-2
SLIDE 2

2

slide-3
SLIDE 3

Single Point Urban Interchange

Project Overview

  • US 27 Limits:

Lake Altamaha to CSX Railroad crossing north of Central Ave.

  • SR 60 Limits:

Central Ave. to Martin Luther King Blvd.

  • Central Ave. Limits:
  • Approx. 800-FT west of US 27 to Miami St.
  • US 27 / SR 60 Interchange:

Replace existing bridges with a single wider and longer bridge Reconfigure the interchange to a Single Point Urban Interchange (SPUI) 3

slide-4
SLIDE 4

Proposed SPUI Interchange

4

slide-5
SLIDE 5

Single Point Urban Interchange

Advantages of a Single Point Urban Interchange

  • Increases sight distance

under the bridge due to no median bridge pier on US 27-improves safety by increasing sight distance

  • Increases the volume of

vehicles traveling through the intersection within a single traffic signal phase

  • Increase intersection

efficiency by reducing signal phases from four phase to three phases

  • Accommodates larger left

turn radii for larger design vehicles

  • Eliminates the long loop

ramps and distanced traveled by the traveling public

  • Increased turn lane queue

storage 5

slide-6
SLIDE 6

6

slide-7
SLIDE 7

7

slide-8
SLIDE 8

8

slide-9
SLIDE 9

Right-of-Way Acquired

Right-of-Way Acquired

9

slide-10
SLIDE 10

Noise Barrier Location

LIME AVE S MIAMI ST SHARP ST Construct Noise Barrier

10

slide-11
SLIDE 11

Noise Barrier Description

  • Barrier Height – 16 Feet
  • 585 Feet in Length
  • Placed 5 Feet Inside FDOT Right-
  • f-Way
  • Color – Light Beige
  • Texture – Ashlar Stone Panels

With Smooth Posts

11

slide-12
SLIDE 12

45 57

12

slide-13
SLIDE 13

Construction Detours

Detour Plan for Project

  • Detours will only be used during night-time work (11 PM – 5 AM)
  • Most detours will be associated with single night operations
  • Detours at Central Ave will be more frequent to construct concrete pavement

13

slide-14
SLIDE 14

Construction Detour

Detour Plan for Frontage Road & SR 60 Closure

  • SR 60 Eastbound
  • W. Central Ave. (EB)
  • US 27 (SB)
  • SR 60 (EB)
  • SR 60 Westbound (Reverse movements as Eastbound detour)
  • Frontage Rd Eastbound
  • Mulberry St. (SB)
  • Oak Ave (EB)
  • US 27 (SB)
  • US 27 (NB) utilizes median U-turn
  • Frontage Rd Westbound
  • SR 60 (WB)
  • W. Central Ave. (EB)
  • US 27 (NB or SB)

Work Zone

Mulberry St Oak Ave

14

slide-15
SLIDE 15

Construction Detour

Detour Plan for US 27 Closure

  • US 27 Southbound
  • W. Central Ave. (WB)
  • SR 60 (EB)
  • US 27 (SB)
  • US 27 Northbound
  • SR 60 (EB)
  • S. 1st St. (NB)
  • W. Central Ave. (WB)
  • US 27 (SB)

Work Zone

S 1st St

15

slide-16
SLIDE 16

Construction Detour

Detour Plan for US 27 Closure South of SR 60

  • US 27 Southbound
  • SR 60 (EB)
  • S. 1st St. (SB)
  • Winston Ave. (EB)
  • SR 17 (SB)
  • Hunt Brothers Rd. (WB)
  • US 27 (SB)
  • US 27 Northbound
  • Reverse movements as Southbound detour
  • US 27 Northbound (between SR 60 & Hunt Brothers Rd.)
  • US 27 (NB) utilizes median U-turn to Hunt Brothers Rd.

Work Zone

Winston Ave S 1st St

16

slide-17
SLIDE 17

Construction Detour (Commercial Vehicle)

Detour Plan for US 27 Closure

  • US 27 Southbound
  • Mountain Lake Cutoff Rd. (EB)
  • SR 17 (SB)
  • Hunt Brothers Rd. (WB)
  • US 27 (SB)
  • US 27 Northbound
  • Reverse movements as Southbound detour

Mountain Lake Cutoff Rd Hunt Brothers Rd

Work Zone 17

slide-18
SLIDE 18

Frontage road area Gibson Ave. & S. Sharp St. 18

slide-19
SLIDE 19

Gibson Avenue and South Sharp Street will be closed and rerouted.

19

slide-20
SLIDE 20

Frontage Road along SR 60 to aid the access management to local businesses

20

slide-21
SLIDE 21

Design – Complete Right-of-Way Acquisition – Complete Start of Construction – September 2020 Construction Completion – Early 2025

21