VCWRF High Rate Clarification: From Drought to Peak Flow and Beyond - - PowerPoint PPT Presentation

vcwrf high rate clarification from drought to peak flow
SMART_READER_LITE
LIVE PREVIEW

VCWRF High Rate Clarification: From Drought to Peak Flow and Beyond - - PowerPoint PPT Presentation

VCWRF High Rate Clarification: From Drought to Peak Flow and Beyond Russe ll Re dde r, P.E . 1 February 13, 2018 T OPICS Ba c kg ro und Pa st (T he Go o d Old Da ys) Pre se nt (Hig h Ra te Cla rific a tio n) F uture (Pe


slide-1
SLIDE 1

Russe ll Re dde r, P.E .

February 13, 2018

1

VCWRF High Rate Clarification: From Drought to Peak Flow and Beyond

slide-2
SLIDE 2

2

T OPICS

– Ba c kg ro und – Pa st (T

he Go o d Old Da ys)

– Pre se nt (Hig h Ra te Cla rific a tio n) – F

uture (Pe a k F lo w a nd Be yo nd? )

slide-3
SLIDE 3

3

BACKGROUND

– VCWRF

is the o nly WWT P fo r F

  • rt

Wo rth a nd Custo me r Citie s

– Co nve ntio na l Ac tiva te d Sludg e – Pe rmitte d ADF

  • f 166 MGD

– Pe rmitte d Pe a k F

lo w o f 367 MGD

– Outfa ll in T

rinity Rive r

– Adde d HRC in 2005 – Co nstruc te d PF

B in 2016-2017

slide-4
SLIDE 4

VCWRF AE RI AL

slide-5
SLIDE 5

T HE GOOD OL D DAYS

slide-6
SLIDE 6

T HE GOOD OL D DAYS

slide-7
SLIDE 7

HI GH RAT E CL ARI F I E R ARRI VE S: 2005

Disc ha rg e to I nte rna l Outfa ll (CCB) if F lo ws a re a b o ve 255 MGD

slide-8
SLIDE 8

… AND SE L DOM GOT USE D

HRC Disc ha rg e s to I nte rna l Outfa ll

  • Ma rc h 2006: 2 Da ys
  • June 2007: 1 Da y
  • Oc to b e r 2009: 4 Da ys
  • Ma rc h 2010: 2 Da ys
  • Ja nua ry 2012 : 2 Da ys
  • Ma rc h 2012: 2 Da ys
slide-9
SLIDE 9

T E XAS DROUGHT MAP SE PT . 2011

Ye ar Pr e c ip.

2005 18.97” 2006 29.75” 2007 50.05” 2008 27,10” 2009 40.89” 2010 31.70” 2011 25.88” 2012 31.26” 2013 29.40” 2014 21,32”

slide-10
SLIDE 10

2015: WE T T E ST YE AR I N HI ST ORY:

62.61” PRE CI PI T AT I ON AT DF W AI RPORT

HRC Disc ha rg e s to I nte rna l Outfa ll

  • Ma y 10-12 : 74 MG
  • Ma y 14 : 30 MG
  • Ma y 17-18 : 60 MG
  • Ma y 21-22 : 30 MG
  • Ma y 24-June 2 : 480 MG
  • Oc to b e r 25-26: 61 MG
  • Oc to b e r 31-No ve mb e r 1: 60 MG
  • No ve mb e r 27-De c e mb e r 2: 343 MG
  • De c e mb e r 27-30: 171 MG
slide-11
SLIDE 11

PE AK F L OW ST ORAGE BASI NS

11

  • F

ind a L

  • c a tio n to Sto re L

a rg e Vo lume s o f Wa ste wa te r fo r T re a tme nt L a te r.

  • I

nsta ll a n 84” Pipe line fro m Bo x OO to Ca rry Wa ste wa te r fro m the Hig h Ra te Cla rifie r (HRC) to Pe a k F lo w Sto ra g e .

  • Utilize Ne w a nd E

xisting Pipe line s to Co nne c t Bo x OO to PE PS 2 fo r Re turn F lo ws.

  • I

nsta ll a Ne w Pump a t the HRC to I nc re a se F lo wra te .

slide-12
SLIDE 12

12

WHE RE CAN WE ST ORE L ARGE VOL UME S?

SL UDGE ONL Y L ANDF I L L (SOL )

slide-13
SLIDE 13

13

PE AK F L OW BASI NS: 275 MG

2 CE L L S, GRASS-L I NE D

slide-14
SLIDE 14

PE AK F L OW ST ORAGE BASI NS

14 84” Pipe line : E xc a va tio n thro ug h No rth L e ve e

slide-15
SLIDE 15

PE AK F L OW ST ORAGE BASI NS

15 84” Pipe line : Cro ssing the T rinity Rive r

slide-16
SLIDE 16

PE AK F L OW ST ORAGE BASI NS

16 84” F lo wme te r

slide-17
SLIDE 17

COMPL E T E D PE AK F L OW ST ORAGE

17

slide-18
SLIDE 18

PE AK F L OW ST ORAGE BASI NS

18 T e sting the Spillwa y

slide-19
SLIDE 19

PE AK F L OW ST ORAGE BASI NS

19

Alte rna te use : Diurna l F lo ws

slide-20
SLIDE 20

PE AK F L OW ST ORAGE BASI NS

20

F uture Use : F la tte n Diurna l Curve ?

Be ne fits

  • Physic a l, Che mic a l, a nd Bio lo g ic a l Pro c e sse s

wo uld Be ne fit fro m Ste a dy F lo ws Cha lle ng e s

  • Sta ffing a nd Running HRC a t Nig ht
  • Co sts o f Che mic a ls a nd E

le c tric ity

  • Hydra ulic s b e twe e n F

a c ilitie s

  • E

ro sio n o f PF Bs fro m Co nsta nt Use

  • Odo rs a t PF

Bs

slide-21
SLIDE 21

ACK NOWL E DGE ME NT S:

21

  • CDM-Smith
  • CP&Y
  • Mc Ca rthy Co nstruc to rs
  • F

a rida Go de rya

  • Ana J. Pe na -T

ije rina

slide-22
SLIDE 22

QUE ST I ONS?

22 Russe ll Re dde r, P.E . Russe ll.re dde r@ fo rtwo rthte xa s.g o v