WASMI HOLDING
Company Profile Presentation
WASMI HOLDING Company Profile Presentation Wasmi Holding - - PowerPoint PPT Presentation
WASMI HOLDING Company Profile Presentation Wasmi Holding Established in 1975 by Wasmi Hamad Al Khaleeb Company was named Wasmi Holding in 2012 Capable of meeting any requirement in the field of general construction, civil
Company Profile Presentation
∗ Established in 1975 by Wasmi Hamad Al Khaleeb ∗ Company was named Wasmi Holding in 2012 ∗ Capable of meeting any requirement in the field of general construction, civil construction, mechanical construction and rental equipment ∗ Safe Working Conditions ∗ Quality Management System
∗ Wasmiholding ∗ Human Resources ∗ Pipeline Construction ∗ Road Construction ∗ Tower Construction ∗ Machine Maintenance ∗ Rental Equipment ∗ Equipment Fleet ∗ Quality Assurance & Control ∗ Health, Safety & Environment ∗ Current Projects ∗ Completed Projects ∗ Pipeline Construction Gallery ∗ Our Clients
Team Number Engineer 11 Supervisor 18 Inspectors 15 Surveyors 16 General foreman 40 Steel fixer 18 Carpenters 12 Plumbers 18 Electricians 6 Mason 21 Store keeper 11 Structural steel erectors 12 Operator / Driver 24 Helpers 20 Labor 30 Welder 25 Pipefitter 15 Operator 130 Driver 128 Side boom operator 12
Unique set of pipeline services provided by us include :
The pipeline construction services provided by us include:
crude oil stabilization of the berm
We provide maintenance, rehabilitation and installation of piping and facilities services to the oil and gas transmission industry. We offer customers the following pipeline integrity services:
Our services include all aspects of Road and Highway Construction for the public sector as well as large parking areas and airport runways for the private
Our work and experience expands from site-development and construction, to maintenance and inspection of pre-existing sites. The company provides turnkey construction services for the telecommunications and broadcast industries.
∗ Machine tool repair and maintenance Services include tool leveling and alignment, way and spindle taper grinding, calibration, and hydraulic and lubrication system upgrade with various specifications and capacities. ∗ We have the necessary tools, equipment and expertise to rebuild and aid in repair of all kinds of equipment as required by our customers.
∗ Wasmiholding has built up a wide ranging fleet of heavy construction equipment. Our product line includes everything from small hand held tools to large earthmovers. ∗ While having a wide variety of tools and equipment is important, making sure they are all operating correctly is most important. We understand that our fleet is the cornerstone of our business and we stand behind the quality equipment we rent.
Vehicle Type Number Sedan Car 35 Pickup 18 Bus (15 Seats) 17 Bus (25 Seats) 10 Excavator 35 Loader 16 Roller Compactor 12 Plate Compactor 4 Dozer 51 Crane 4 Dump Truck 45 Water Tanker 24 Grader 12 Flat Bed 20 Low Bed Hydraulic 12 Trailer 25 Electric Generator 16 Truck 19 Boom Truck 5T & 10T 21 Side Boom 12
It is the policy of Wasmiholding to comply fully with all applicable laws and regulations concerning construction activities on campus. We have Safety Plans that are adequate to protect the safety of people and property within the construction site and the surrounding area.
Manager Operations Services Department Construction Department Safety Manager Quality Control Manager Project Manager Maintenance Dept. President General Manager Construction Officer Project Engineer 2 Project Engineer 1 Safety Supervisor Safety Engineer Quality Control Supervisor Quality Control Engineer Project Control And Support Planning Dept. Procurement Dept. Estimation Dept. Equipment Rental Division Coordinator Logistics And Transport Officer Workshop Incharge Mechanic/ Layman
GOSP-3 Pipeline
Pipelines
Pipelines Between NGL, GOSP-1 And GOSP-4 Including Valve Hydro Testing.
Pipelines
GOSP-2 Pipelines
Pipelines
WesternGeco
Project: Pipeline construction project Start Date: June 1st , 2007
Saudi Aramco
Project: Design and construction of communication link , tower and associated facilities at Al- Uqair beach Start Date: Dec 1st, 2013 Completion Date: May 28th , 2014
ARGAS
Project : Equipment rental & services Start Date: Sept 1st , 2010
ARGAS
Project : Drilling Project Start Date: May 28th , 2011
Sinopec
Project: Equipment maintenance Start Date: Aug 19th , 2009
Makamin Petroleum
Project: Construction of PDHMS and E&I for 8 HWYH and HRDH wells, SSV/SSV surface panels installation for 13 UTMN wells Start Date: Dec 13th , 2011 Completion Date: June 30th , 2014
Makamin Petroleum
Project: Installation of four water injection centrifugal pumps in ABQ area Start Date: Sept 20th , 2011 Completion Date: Sept 10th , 2014