Capital Improvement Plan
- Program funding sources:
– Operating Revenue (utility rates) – Impact Fees
- Capital Improvement Plan addresses need for superior water, wastewater,
irrigation service, and electric.
- Determined by many factors
– Customer base growth – Service improvement – Rehabilitation of aging infrastructure – State and federal requirements – Competitive advantage – Contractual obligations
FY2017 Annual Budget
Water Services - Georgetown
– Water Mains - $6,274,000
- Leander Interconnect - $575,000
– Approximately 2,000 LF of 12” line. – Potential interconnect with Leander water system – Potentially provide up to 6 million gallons per day – Provide redundancy Western District
- West Loop - $2,119,000
– Along SH 29 (Wolf Ranch to DB Wood) – Replace existing 8/12” lines with 24” – Redundancy to Wolf Ranch Development and Pastor Pump Station – Assist with distribution of Round Rock water
- CR 255 - $3,000,000
– Approximately 7 miles (Daniels Mountain tank site to SH 29) – Continuation of Western District line replacement under design and partially funded FY 16 – Maintenance and rehabilitation (multiple breaks, poor bedding, substandard material)
- Street Rehab - $330,000
–
- W. 11th Street (Main-Rock)
- Western District Line Upgrades - $250,000
– As needed to meet TCEQ requirements
FY2017 Annual Budget
Water Services - Georgetown
- Water Treatment - $6,100,000
– Lake Treatment Plant Maintenance - $600,000
- Estimated to need approximately 2 million gallons per/year
- Lake intake maintenance
- Increase intake capacity to almost 38 million gallons
- Additional treatment will be required
- Estimated at $12 million (FY 18/19)
– South Lake Treatment Plant - $1MM
- Site Selection (2017)
- Permits (2018)
- Design (2019-2020)
- New treatment facility (2022-23)
- 5-10 year development plan
- Approximately 12 million gallons initially
- Approximately $35 million total
FY2017 Annual Budget
Water Services - Georgetown
- Water Treatment
– Domel Pump Station - $4,500,000
- Add filtration to Domel Pump Station rehabilitation project
(funded in FY 16).
- Potential risk of losing 3 million gallons per day if certain
contaminants are found.
FY2017 Annual Budget
Water Services - Georgetown
- Water Storage -$6,030,000
– Sun City Elevated Storage Tank - $3,050,000
- Replace existing 400,000 gallon elevated tank
- Construct new 1.5 million gallon elevated tank
- Required to meet growing demands
– Sequoia Ground Storage Tank - $2,500,000
- 3-4 million gallon tank on existing site
- Ground tank instead of elevated in Georgetown Village
- Increased treated water storage to help Lake Plant peak
- Very competitive tank pricing currently available
– Tank Rehabilitation - $480,000
- Repair and rehabilitate existing metal tanks
- Typically required every 12-15 years
- Airport Road Reuse tank (2017)
- Daniels Mountain small tank (2018)
- Daniels Mountain large tank (2019)
FY2017 Annual Budget
FY2017 Annual Budget
Wastewater Services
- Wastewater Improvements - $13,636,000
– Edwards Aquifer Recharge Zone (EARZ) 2015 - $1,500,000
- Continuation of existing program
- Identification and replacement of damaged sewer lines and manholes
– Street Projects - $136,000
- W. 11th Street (Rock – Main)
– Berry Creek Interceptor - $12,000,000
- Initial phase of construction planned for late 2016 (Sun City to Airport Road)
- Airport Road to Pecan Branch Wastewater Treatment Plant
- Proposed funding for potential Public-Private Partnership with Homestead Development
- Provide permanent wastewater capacity to expanded Sun City, Shell Road, and Hwy 195 Corridor
- Ultimately take Sun City Lift Station offline
FY2017 Annual Budget
Wastewater Services
- Lift stations - $4,532,000
– Park Lift Station and Force Main - $3,982,000
- Existing San Gabriel Wastewater Treatment Plant Lift Station
- Required repairs of existing station and capacity expansion for development
– Lift Station Upgrades - $550,000
- TCEQ/SSO plan requirements
- Redundant power
- Electrical/control system upgrades
- Lift stations to be prioritized based on field conditions
- Irrigation System
– No improvements proposed
FY2017 Annual Budget
Wastewater Services
- Plant Upgrades - $10,155,000
– Pecan Branch Wastewater Treatment Plant Expansion - $7,948,000
- 1.5/1.8 million gallons per day to 3.0/3.6 million gallons per day
- TCEQ mandate to initiate construction based on actual plan flows
- Design previously initiated
- 18 month construction schedule (additional $3,600,000 FY 18)
- Ultimate terminus for Berry Creek Interceptor (Sun City, Shell Road, Hwy 195, Berry Creek
areas)
– San Gabriel Wastewater Treatment Plant Belt Press - $2,207,000
- Sludge dewatering currently manual, inefficient, limited capacity, and weather dependent
- Belt press will mechanically & chemically dewater sludge
- Free up drying bed space onsite