Waterfront Substation October 29, 2015 Project Update I Pepco Holdinqs Inc 2 ~ ~ Waterfront Substation Project Phase Progress Phase 1: Regulatory authorization and zoning BZA approval received in March 2015 and DC PSC approval


slide-1
SLIDE 1

Waterfront Substation

October 29, 2015

slide-2
SLIDE 2

I Pepco Holdinqs Inc

Project Update

2

slide-3
SLIDE 3

I Pepco Holdings Inc

Waterfront Substation Impacted

d

St<eets

  • "'.

G-,

..

l- )

"O

C

N

QStSW

nc S St SW

.....

VI

.....

~

Buzzard Pt

~

Substation

W;

Waterfront Substation

  • Project Phase Progress
  • Phase 1: Regulatory authorization and zoning
  • BZA approval received in March 2015 and DC PSC

approval in April 2015

  • Phase 2: Substation site preparation
  • Environmental assessment finished and demolition

will complete in early November 2015

  • Phase 3: Design & construction of the substation,

transmission and distribution lines

  • Detail engineering and permitting is underway
  • Distribution construction beginning Nov 2015
  • Transmission construction beginning Dec 2015
  • Substation construction beginning Jan 2016

3

slide-4
SLIDE 4

I Pepco Holdinqs Inc

Waterfront Substation Project Schedule

Prepare Waterfront Site for Construction June – November 2015 Award EPC Contract; Perform Detail Engineering July 2015 – July 2016 Obtain Building Permit January 2016 Construct Substation Building January 2016 – April 2017 Install Electrical Equipment August 2016 – April 2017 Initial Transfer of Electrical Load May 2017 – June 2017

4

slide-5
SLIDE 5

I Pepco Holdinqs Inc

Demolition Update

5

slide-6
SLIDE 6

I Pepco Holdings Inc

Demolition Update

  • Pepco contractor Northstar

performed demolition of existing Lyon Bakery and ANA towing office buildings

  • Demolition phase is nearing

completion

6

slide-7
SLIDE 7

I Pepco Holdings Inc

Demolition – Measures & Controls

  • Water spraying mounted hose and

nozzles for dust suppression

  • Continuous humidity/moisture content in

the construction debris

  • Prevention of dust from becoming

airborne

  • Portable water tanks cover smaller

blanket of airborne dust areas without blowing any water or dust laden mist

  • utside the property limits

Construction vehicles cleaned prior to departing construction site

7

slide-8
SLIDE 8

Pepco Holdings nc

Demolition – Vector Control & Abatement

  • Northstar placed ten bait stations around the perimeter of the site prior to demolition
  • Department of Health bureau of community hygiene and rodent control division

inspected the site on July 28th 2015 and issued clearance certification

  • The contractor also hired Critter Control (Rodent Control company) as secondary

measures

  • Bait stations inspections reveal no evidence of rodents
  • Northstar has requested follow up DOH site inspection post demolition

8

slide-9
SLIDE 9

I Pepco Holdings Inc

Demolition – Site Controls

  • Installation of Stabilized Construction Entrance, silt fence and super silt fence

as part of the Erosion and Sediment control measures

  • Construction debris and Asbestos containing building material segregated,

covered and hauled off site for disposal

9

slide-10
SLIDE 10

I Pepco Holdinqs Inc

Substation Engineering & Construction Update

10

slide-11
SLIDE 11

I Pepco Holdings Inc

Waterfront Substation Construction

January 2016 - April 2017

  • 60% detail design complete
  • Pepco will install up to 20,000 sf of PV Panels on the roof of the substation for station service

11

slide-12
SLIDE 12

I Pepco Holdings Inc

About ABB USA

  • ABB USA is a world leader in power

technology

  • ABB is working with Pepco to enhance

Pepco’s transmission network in Washington DC – improving reliability and efficiency with this advanced substation 12

slide-13
SLIDE 13

About Coakley & Williams Construction, Inc.

Founded in 1961 CREBA Recently Ranked Us Best Contractor Award Winning Technology Services Sustainable Construction 215 Industry Awards Strong, Local Relationships

2

13

slide-14
SLIDE 14

2

About Coakley & Williams Construction, Inc.

14

slide-15
SLIDE 15

I Pepco Holdings Inc

i

t:i

~

(J)

z

N

PEPCO WATERFRONT SUBSTATION #223

Waterfront Substation Landscape

15

slide-16
SLIDE 16

SlR((T

mr

IIMNO) 1• 1''•1"

  • r- •. -+- 6'

l

PLA~T!NG AIIEA Sl()(WAI.IC TREE 10Nr

,.

..•.

'

APPROX - LOCATIOt~ OFPOW£R

u~u

"-NCilt CAOltUGttr 11· s· lRSTP.Ul.SW

'

\

.J

f)I (l(C llM

'

Ul"4WArtP.LINt.

  • U. 4'

GAS I.IN( (ABNO I (X 1\"SI.NIT,U't'UNf

tlt!UC UN(

, STREETSCAPE SECTION · 1ST STREET, SW - SOUTH

01"00 , 1,lfl·. 1 ·.o·

DIST MANtlOLF (SU UT1ll1" OAAWINGS) PLANTING NOOk SJOl WAUC STRUT TR(( (BEVONOt

..

  • ,.

..

  • · -

I \

'"5Tflll5U110N LINt

I.SU UTIUfY PlAAS) CONCR[T( l)UCT BAN• cm VTIIJTV.._.N~)

STREETSCAPE SECTION · 1ST STREET, SW · NORTH

0 1<• 001 119· • 1 · o·

I Pepco Holdings Inc

APPROX l,OCAllON 0,POW(R UNO SI..C.(E

Gl06C LIGHT

lM"

I.MSJIIIHT, SW

'

rx.a~wAm~w..ir

()( IS~SANITAAYUkE.

II'

8IOR(TE,,,.10N P\ANllt.G

a·,

..

'

APPROX LOCATION Of POWCR UN(S Jl'.!,''

In

STRUT.SW

'

lX-EUtLINE

()C rl[C.UNf

'

()( l"WATEl\llNl 2

STREETSCAPE SECTION - 1ST STREET, SW - MIOBLOCK

014001 118"• t',O"

S[CURfT'Y FENC(

\

APPAO)( --. LOCATION

  • r POWER

LINtS

.,. ..

CONCIIICT!' oucr flANl(S fl'YPJ j5£[ UllllTYPIANS)

  • STREETSCAPE SECTION · 0 STREET, SW

0t4 001 1,r

  • 1'• O"

JJ' f," QSTRUI SW

,, ' '

\

lX.

I"

WAftfl LINE (X, 21" $A.~n'AA'f llNt E< 4" QA$ LINE (A81t01

£)(. 2•" SANlf.U.Y UN!

Waterfront Substation Landscape

16

slide-17
SLIDE 17

..

_.;r

P,1.V1~

  • 111tr

IBffl>NDI ft.OYo"ER~ TI!H ,OU'DNDI Slll([T TR(£ IIICYONOI

  • ~
  • 8' -+- 6' -

'

'

  • lAANSMrWDNllNCS.

1su unurr PIAN~

""""°'

lOCATIOff ()fl'()W(O UNU

lndSTREET,SW

... '

U.2.I4Y-.hJTAATural:

EX t2•SAJrcfTAAVU,ME cx.a•wATLllUNI

0.

  • J• SANllu." UNC

£X EUCTlllCU"-£

STREETSCAPE SECTION· 2ND STREET, SW· NORTH

ii

  • I

OMOQZ 118' • 1'·0"

! """'°'

I

lOCAnON

  • r POwfA

"""

n• ,~

  • 9'·.J~

10

PR[{AST PloV(llS

.....

MfM,IM

'ff"-rn

811ClllACK

"'"

t8CVONOt 14' P.:,U~rrr. SW [)( [LCC.UN( TIW,SMISSIC>N Ui;fS iSHU'f11WfPI.AN1)

I ,.

I

[lC.Jt•~ITAII.VUN( tll J"C,ASLIN(

, STREETSCAPE SECTION· R STREET, SW · WEST

0 14001 111' • 1'·0"

I Pepco Holdings Inc

~ APPfK>)I,

~ !

UXATION

  • rPQWc11

i

UNB

'

I

MCDIUMS'TIIEIT l~H ltlfVOND) rLOW(rtlNG Sl"KiUGLOM T"1£ UGHT (IE'f'ONDI

,s·r

....

IIAl'ito PlANTlll

  • 10

··-

  • --:,.

T]

M

SIO[WAL(

110.C U111UT.1W CX (t£C,U.N(

""''

"

I

'

\'AULl TIIANSMoSSIONLINfS

  • EX. ll"SAN lAScV

UN[

I

(\H

UIH,H\' PLAN$~

IX 1"0.UUN~

, STREETSCAPE SECTION • R STREET, SW · WEST

0 14002 , •••• 1'·0"

'

1ndSTRE.ET S.W

'

fX CO¥M.l1Nl

'

ut

2l"SNtl1AA¥U,.,_t. EX Jl"'S,,tJt1T4RYU~E

cx.rwAtutUNr

  • t

CZ'"SAkrTNIT IJ..HE

U ELKTRICLNE

STREETSCAPE SECTION· 2ND STREET. SW· SOUTH

014 0Q2 111"'•1'·0' 24'1' PR[CA!.TPA'/[RS

[I

m,o,

~,~

J~

llN[S .....

I ~~~'~'?°''" c-~ I ~;:;-

4,.,.ux,

..

  • TR[(

..

,

  • -1
  • STREETSCAPE SECTION • R STREET, SW • EAST

01•00:l ,..-. 1 ·.o·

lllitkm,!.w

'

(X.[l{C.L,H(

'

  • Cx. ll"SAM'TMV UN[

ltl'G.ASI.IN( rMHs~,s~HUNf. C!.E£Ulllll'fPV.Nli)

Waterfront Substation Landscape

17

slide-18
SLIDE 18

I Pepco Holdings Inc

Waterfront Substation Landscape

Plant Palette 18

slide-19
SLIDE 19

I Pepco Holdinqs Inc

Transmission Engineering & Construction Update

19

slide-20
SLIDE 20

I Pepco Holdings Inc

Overall Underground Transmission and Distribution

  • Map on slide 20 was removed

from the original presentation for publication on website

  • Underground Transmission (Under

Construction)

  • Underground Transmission Lines Phase 1
  • Underground Transmission Lines Phase 2
  • Future Ductbank on New Bridge
  • Underground Distribution Lines

20

slide-21
SLIDE 21

I Pepco Holdinqs Inc

Underground Transmission Lines

138kV Underground Lines between Buzzard Point Substation and Waterfront

  • Map on slide 21 was removed from

the original presentation for publication on website Substation. Construction: December 2015  March 2017 Ductbank for future Underground Transmission Feeders Construction: March 2016  July 2017

21

slide-22
SLIDE 22

I Pepco Holdinqs Inc

Underground Transmission Installation Video

www.pepco.com/Underground-Construction.aspx

22

slide-23
SLIDE 23

I Pepco Holdinqs Inc

Distribution Engineering & Construction Update

23

slide-24
SLIDE 24

I Pepco Holdinqs Inc

Distribution Conduit Phase 1:

November 2015 - April 2016

  • Map on slide 24 was removed from the
  • riginal presentation for publication on

website

24

slide-25
SLIDE 25

·-

  • ~

Traffic Control

25

slide-26
SLIDE 26

I Pepco Holdings Inc

Potential Yard Disturbance

  • Map on slide 26

was removed from the original presentation for publication on website

26

slide-27
SLIDE 27

I Pepco Holdinqs Inc

Distribution Conduit Phase 2: 2017 and beyond

  • Map on slide 27 was removed from the
  • riginal presentation for publication on

website

27

slide-28
SLIDE 28

I Pepco Holdinqs Inc

Questions

28

slide-29
SLIDE 29

I Pepco Holdinqs Inc

Appendix

29