Wrenshall School District- Long Range Facility Plan Agenda Building - - PowerPoint PPT Presentation

wrenshall school district long range facility plan agenda
SMART_READER_LITE
LIVE PREVIEW

Wrenshall School District- Long Range Facility Plan Agenda Building - - PowerPoint PPT Presentation

Wrenshall School District- Long Range Facility Plan Agenda Building Walk-Through 4-6 PM Introductions Why Are We Here? Review Overall Process Discussion Cards Adjourn- 8PM Introductions Introductions Katie Hildenbrand Ryan Erspamer Casey


slide-1
SLIDE 1

Wrenshall School District- Long Range Facility Plan

slide-2
SLIDE 2

Building Walk-Through 4-6 PM Introductions Why Are We Here? Review Overall Process Discussion Cards Adjourn- 8PM

Agenda

slide-3
SLIDE 3

Introductions

Introductions

Ryan Erspamer

AIA, Architect, Principal

Katie Hildenbrand

Certifi ed Interior Designer, Principal

Facility Committee

Wrenshall Schools

Casey Nies

Architect

slide-4
SLIDE 4

Introductions

Why Are We Here?

Develop a thoughtful, cost effective, long-term solution for the

Wrenshall School District

that the tax payers and residents will support.

  • Improve learning and working environment
  • Funding solution- Tax impact
slide-5
SLIDE 5

Introductions

Summary of Stakeholder Input

Strengths Challenges

  • Quality teachers and staff
  • Dedicated
  • Specialized education
  • pportunities
  • Programs and offerings
  • Students!
  • “Small school” atmosphere
  • Community
  • Utilization of space
  • Existing infrastructure

technology

  • Age of facility & infrastructure
  • Construction cost
  • Secure facility
  • Equality of space & learning
slide-6
SLIDE 6

Introductions

Needs, Wants, & Wishes

Facility Needs

  • Health & Safety
  • Indoor Air Quality
  • Accessibility
  • Security
  • Deferred Maintenance
  • Energy

Effi ciency

slide-7
SLIDE 7

Introductions

Needs, Wants, & Wishes

Space Needs

  • Square footage based
  • n enrollment
  • Delivery of education
  • Special Education
  • Post Secondary

Education

  • Career/ Tech Ed
  • Student Enrollment Year 2017-2018: Approx. 358 students
  • Existing facility square footage
  • PK-12 school building: 133,479 sf
  • Rec. building: 11,000 sf
  • Total square footage: 144,479 sf

GROSS SQUARE FOOTAGE PER STUDENT GUIDELINES SCHOOL ELEMENTARY MIDDLE LEVEL HIGH SCHOOL STUDENT ENROLLMENT SF SF SF LESS THAN 500 125 - 155 170 - 200 200 - 320 500 - 999 110 - 135 160 - 190 190 - 220 1000-1500 100 - 135 150 - 180 180 - 200 1500-2000 140 - 170 170 - 190 2000 PLUS 150 - 180 FOR POOL, AUDITORIUM, OR

COMMUNITY USE / PARTNERSHIP SPACES ADD SQUARE FOOTAGE AS APPROPRIATE

  • Wrenshall current gross square foot per student: 403 sf

LESS THAN 500 125 - 155 170 - 200 200 - 320

Minnesota Department of Education Guidelines

slide-8
SLIDE 8

Introductions

Needs, Wants, & Wishes

Education Needs

  • Incorporation of

technology

  • Flexibility for future

educational trends

  • Support for future

growth in enrollment

slide-9
SLIDE 9

Indoor Air Quality Safety & Security Updated Technology Activity Space

Introductions

Highest Needs

slide-10
SLIDE 10

Introductions

Needs, Wants, & Wishes

Wants & Wishes

  • Maintain pool
  • Updated career / tech ed space
  • Second gym space
  • Provide more extracurricular
  • pportunities to students
  • More activity space
  • 1 to 1 technology
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15
slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21

Thank you

Wrenshall School District- Long Range Facility Plan

THANK YOU