SLIDE 4 Electromechanical installations
- HVDC-plants and installations
- High-voltage transformers
- Hydro electric power plants
- Transformer stations
Electromechanical installations
2002-2004 Installation of DC-busbars, rebuild 20 kV, high voltage effjciency switches and rails at Elkem Aluminium ANS Mosjøen. Customer: ABB Industri AS 2003-2004 Installation of rectifjer and DC-busbars at Hydro Aluminium Sunndal. Customer: ABB Industri AS 2004-2005 Installation of rectifjer and DC-busbars at Hydro Aluminium Årdal. Customer: ABB Industri AS 2004-2006 Installation of rectifjer and DC-busbars at Hydro Aluminium Karmøy. Customer: ABB Industri AS and Hydro Aluminium Karmøy 2007 Installation at Feda: convertor station, cooling system, generator, indoor and outdoor systems, transformers, switch system etc. and fjre seal. Customer: ABB HVDC AB 2008 Installation at the power station at Tryland. Customer: ABB Kraft AS 2008 Installation at Ullandshaug 300 kV system. Customer: Lyse AS 2009 Installation at the Valhall convertor station at Elkem Aluminium Lista, 150 kV. Customer: ABB HVDC AB 2009-2010 Installation at the Valhall convertor station module in Lowestoft, England. Customer: ABB HVDC AB 2010-2012 Installation at Borwin Alpha, offshore Germany (HVDC offshore substation). Customer: ABB HVDC AB 2010 Installation of 132 kV equipment at Jørundland power station, all high voltage equipment. Customer: ABB Kraft AS 2010-2012 Installation at the power station at Brokke, Etne, Iveland, Mauranger, Mæl and Mår. Customer: ABB Kraft AS 2012 Installation at the power station at Austadvika. Customer: ABB AS 2012 Installation at power stations in Kongo (Inga and Kolwezi). Customer: ABB AB 2012 Planning and installation at Dolwin Alpha (HVDC offshore substation) Customer: ABB HVDC AB
Extensive electromechanical experience Reference projects
electromechanical engineering and installations