1 Todays Agenda Time Agenda Duration Responsible Person/ Action - - PowerPoint PPT Presentation

▶
1 today s agenda
SMART_READER_LITE
LIVE PREVIEW

1 Todays Agenda Time Agenda Duration Responsible Person/ Action - - PowerPoint PPT Presentation

1 Todays Agenda Time Agenda Duration Responsible Person/ Action Item (minutes) Organization From To Welcome and Introductions Lee Royal Beasley / 1 10:00 AM 10:10 AM 0:10 LRB Consulting Group Icebreaker Chris Piazza/ RKK 2 10:10 AM 10:15


slide-1
SLIDE 1

1

slide-2
SLIDE 2

Agenda Item Time Duration (minutes) Action Responsible Person/ Organization From To 1 10:00 AM 10:10 AM 0:10 Welcome and Introductions Icebreaker Lee Royal Beasley / LRB Consulting Group 2 10:10 AM 10:15 AM 0:05 Proj ect Overview and Timeline Chris Piazza/ RKK Matt Wey/ Lochner 3 10:15 AM 10:30 AM 0:15 S ummary of Vision Workshops Heather Coons / RKK Lara Bouck / Lochner 4 10:30 AM 10:45 AM 0:15 S ummary of Findings (S

  • uthern Corridor)

Chris Piazza/ RKK

  • 10:45 AM

10:55 AM 0:10 Break 5 10:55 AM 11:10 AM 0:15 S ummary of Findings (Northern Corridor) Matt Wey / Lochner 6 11:10 AM 11:15 AM 0:05 Nodal Analysis and Evaluation Methodology Jen Musselman / Kittelson 7 11:15 AM 11:55 AM 0:40 Breakout S ession Preliminary Concepts Discussion Heather Coons / RKK Lara Bouck / Lochner 8 11:55 AM 12:00 PM 0:05 Wrap-up and Adj ourn Lee Royal Beasley / LRB Consulting Group

2

Today’s Agenda

slide-3
SLIDE 3

Welcome and Introductions

 Name and Title  Organization

 What did you like best about

the Visioning Workshops or what could we change to make the next round of workshops more effective?

3

slide-4
SLIDE 4

Alternate US 19 Corridor Study

(Park Street North to Pinellas/Pasco County Line)

Agenda Item No. 2 – Proj ect Overview and Timeline

4

slide-5
SLIDE 5

A Systematic Approach

— Collect and Analyze Available Data — Invite All Voices to the Table — Build Informed Consensus

Project Overview

Define Evaluation Measures Develop Future Roadway Cross Sections

Status of Deliverables

— Vision Report — Existing Conditions Report — Design Traffic Technical Memorandum — Corridor Alternatives and Strategies Report

slide-6
SLIDE 6

Project Timeline & PAG Input

6

—

Input on findings to date

—

Input on evaluation measures

—

Input on preliminary concepts

—

Define short vs. long-term

PAG #4

—

Overview of Nodal Analysis concepts

—

Input on concepts

—

Input on prioritization

PAG #5

slide-7
SLIDE 7

Alternate US 19 Corridor Study

(Park Street North to Pinellas/Pasco County Line)

Agenda Item No. 3 – S ummary of Corridor Visioning Workshops

7

slide-8
SLIDE 8

Visioning Workshops

Rolling PowerPoint

Rank the Guiding Principles

Streetmix Exercise

WikiMapping Tool

8

slide-9
SLIDE 9

Visioning Workshop Summary – Southern Corridor

9

December 7th, 2017, 6-8pm

Largo Performing Arts Center

17 Attendees

slide-10
SLIDE 10

Rank the Guiding Principles - Southern Corridor

10

Guiding Principles

Corridor-Wide Seminole Largo

MATCH the Character

2 3 4

INCREASE Safety

1 1 1

BALANCE User Needs

3 2 3

ENHANCE the Networks

4 4 2

CELEBRATE the Unique Assets

5 5 5

slide-11
SLIDE 11

Streetmix Exercise – Southern Corridor

11 

S ummary

— Bike lanes — Dedicated bus and/ or

light rail

— Wide sidewalks

slide-12
SLIDE 12

WikiMap Tool & Roll Plots – Southern Corridor

12

slide-13
SLIDE 13

Visioning Workshop Summary – Northern Corridor

December 5th, 2017, 6-8pm

Hale Senior Activity Center

90 Attendees

13

slide-14
SLIDE 14

Rank the Guiding Principles – Northern Corridor

14

Guiding Principles

Corridor- Wide Clearwater Dunedin Palm Harbor Tarpon Springs

MATCH the Character

2 2 2 3 3

INCREASE Safety

1 1 1 1 1

BALANCE User Needs

3 5 3 2 4

ENHANCE the Networks

5 4 5 5 5

CELEBRATE the Unique Assets

4 3 4 4 2

slide-15
SLIDE 15

Streetmix Exercise – Northern Corridor

15

Summary

— 2 lanes or 2 + TWLTL — Bike lanes — Wide sidewalks — Multi-use paths — Redesignation

slide-16
SLIDE 16

WikiMapping Tool & Roll Plots – Northern Corridor

16

S ummary

—

Reroute ALT 19 to MLK Jr Ave and Douglas Ave (Clearwater)

—

Add dedicated turn lanes through Downown Clearwater

—

Reroute ALT 19 to Douglas Ave OR Union S treet to Patricia Ave or Keene Rd (Dunedin)

—

High crash locations on either side of Anclote River Bridge; no bike/ ped facilities (Tarpon)

—

Better/ more lighting and sidewalks throughout

—

Improve crossing opportunities for bikes/ peds across ALT 19 and to/ from Pinellas Trail: more crosswalks, ped- controlled signals

—

Providing bus turn outs, particularly in two- lane segments

—

Reduce traffic speeds throughout

—

Roundabouts recommended at various locations

slide-17
SLIDE 17

Alternate US 19 Corridor Study

(Park Street North to Pinellas/Pasco County Line)

Agenda Item No. 4 – S ummary of Findings (S

  • uthern Corridor)

17

slide-18
SLIDE 18

Seminole Hot Topics

18

S afety Report

—

Add bike lanes

—

Mid-block crossings

—

Add backplates to signals

—

Right turn bays at signals

Traffic Report

—

Add turn lanes at Park Blvd.; widen roadway

—

Add turn lanes at 100th Way; widen roadway

—

Review signal approaches and optimize signals

Public Comment

—

Add EB and WB through lanes across Long Bayou Bridge

—

Sidewalks narrow/ too close to street near Lake Seminole Estates

—

Add bike lanes

—

Add bus turn-out lanes

slide-19
SLIDE 19

Largo Hot Topics

19

Safety Report

—

Add bike lanes

—

Mid-block crossings

—

Add backplates to signals

—

Consider lane reduction

Traffic Report

—

Add turn lanes at Belleair Road, Rosery Road, and W/ E Bay Drive

—

Review signal approaches and optimize signals

Public Comment

—

Pedestrian safety at Walsingham Road, 8th Ave S W/ S E, and W/ E Bay Drive intersections

—

Jaywalking across Alternate US 19 occurs near Largo High S chool and shopping centers south of Rosery Road; add mid-block crossings

—

S idewalks narrow/ too close to street

—

Add dedicated right turn lane to Alternate US 19 from Ulmerton Road

—

Add bike lanes

—

Add bus turn-out lanes

slide-20
SLIDE 20

Alternate US 19 Corridor Study

(Park Street North to Pinellas/Pasco County Line)

BREAK

20

slide-21
SLIDE 21

Alternate US 19 Corridor Study

(Park Street North to Pinellas/Pasco County Line)

Agenda Item No. 5 – S ummary of Findings (Northern Corridor)

21

slide-22
SLIDE 22

Northern Corridor Hot Topics

Screenshot of KMZ

22

slide-23
SLIDE 23

Clearwater Hot Topics

Safety Report

— S

afer pedestrian crossings, especially adj acent to PS TA stops

— Improve/ add lighting — Mid-block crossings at Turner S

treet, Railroad Avenue

— Median treatments/ access management — Consider lane reduction study and roundabouts at signalized intersections, specifically

at Drew S treet

Traffic Report

— Coordinated signals — Add turn lanes at Belleair Road & Court S

treet

Public Comment

— S

afer school crossing at Belleair Elementary

— Improved trail connections and mid-block crossings

23

slide-24
SLIDE 24

Dunedin Hot Topics

S afety Report

—

Roundabout or other intersection treatment at Main and Marina

—

Mid-block crossings, specifically across Edgewater Drive connecting to the waterfront

—

Lighting improvements at Curlew Road intersection

Traffic Report

—

Improvements to Main and Marina

—

Add second southbound left at Skinner Boulevard intersection

—

Add westbound left at Curlew Road

Public Comment

—

Mid-block crossings, specifically across Edgewater Drive connecting to the waterfront

—

Traffic calming/ slow traffic

—

Consider a roundabout at Main and Marina

—

Golf cart crossings in downtown Dunedin

—

Address gaps in sidewalks

—

Heavy congestion at Curlew Road due to Honeymoon Island, improve bike/ ped conditions

24

slide-25
SLIDE 25

Palm Harbor Hot Topics

Safety Report

— Roundabout at Virginia Avenue, Florida Avenue, Crystal Drive — Replace TWLTL with a raised median from Tampa Road –

New Y

  • rk Avenue

— Install/ add lighting

Traffic Report

— Improvements to Tampa Road and Klosterman Road

Public Comment

— Intersection and mid-block crossing enhancements adj acent to Downtown Palm

Harbor; consider roundabouts

— Install raised medians — S

ignificant flooding

— Congestion issues at Alderman & Klosterman; consider roundabout

25

slide-26
SLIDE 26

Tarpon Springs Hot Topics

Safety Report

— Install bike lanes and sidewalks

Traffic Report

— Add turn lanes at Meres Boulevard

Public Comment

— Address sidewalk gaps — Add bike/ ped facilties on Anclote River Bridge — Coordinate traffic signals — Heavy congestion — Flooding issues

26

slide-27
SLIDE 27

Alternate US 19 Corridor Study

(Park Street North to Pinellas/Pasco County Line)

Agenda Item No. 6 –

Nodal Analysis and Evaluation Methodology

27

slide-28
SLIDE 28

Nodal Analysis

What is a nodal analysis?

— Examinat ion of a series of parcels in each j urisdict ion that were identified in

comments.

— Examines opportunities to align the current/ future planning efforts with the GPs . — Intended to: S

erve all users + help guide area towards higher walkability & livability.

Schedule

— North S

egment coordination meetings 3/ 6 – 3/ 13

— S

  • uth S

egment meeting – to be scheduled

— Results presented at PAG Meeting #5

Outputs are high-level concept plans that:

— Are not prescriptive, or indicat ive of future policy — Consider adding additional network (over time) — Provide recommendations for developing land uses — S

how how land-use and transportation can work together to create great places

28

slide-29
SLIDE 29

Evaluation Methodology

Corridor-Wide and Segment Strategies

— Corridor-Wide examples include coordinat ion with PS

TA to consolidate bus stops and improve ADA accessibility, coordinate with local j urisdict ions to improve lighting, landscaping, and street furniture, and optimize signal timing where appropriate.

— S

egment examples include adding street parking, sidewalks/ wider sidewalks, and/ or bicycle lanes to portions of the corridor.

Intersection/ Spot Improvements and Safety Improvements

— Examples include bus pull outs, mid-block crossings, crosswalk treatments, etc. — Many can be implemented as standalone proj ects to address near-term needs.

Alternative Evaluation

— Alternatives will be developed at the segment or intersection level — Evaluation matrices will be developed to evaluate how well various segment or

intersection alternatives meet the needs associated with the five Guiding Principles.

29

slide-30
SLIDE 30

Alternate US 19 Corridor Study

(Park Street North to Pinellas/Pasco County Line)

Agenda Item No. 7 –

Breakout S ession

30

slide-31
SLIDE 31

Breakout Session

 One station for each j urisdiction  Aerials with callouts identifying preliminary

improvement options

 Pinellas County, FDOT

, PS TA, Forward Pinellas will float between stations

— Any questions specifically for floaters, Lee will write down on the

Parking Lot boards

31

slide-32
SLIDE 32

Closing Remarks and Adjourn

Agenda Item No. 8

32

slide-33
SLIDE 33

Next Steps

P AG Meeting Number 5: Wednesday, July 11, 2018 10:00 AM-12:00 PM Clearwater Public Library – Main Branch 100 North Osceola Avenue Clearwater, Florida 33755

33

► Review Nodal Analysis Concepts ► Review Short- and Long-Term Improvement

Alternatives

► Discuss format of Alternatives Public Workshops in

September

slide-34
SLIDE 34

Thank You for Your Participation!

34