A need t to push for
- rward t
the d development
- f c
compatible joi
- ints b
between d different cable ma manuf ufactur urers
TGEG’19, Technologies for Global Energy Grid
A need t to push for orward t the d development of c compatible - - PowerPoint PPT Presentation
TGEG19, Technologies for Global Energy Grid A need t to push for orward t the d development of c compatible joi oints b between d different cable ma manuf ufactur urers An obs bser ervation: n: t the d demand nd for offs
TGEG’19, Technologies for Global Energy Grid
Workshop AGP’21, Thursday 27th of June, 2019
for E Europe pe)
88 1865 2145 3305 1000 2000 3000 4000 Length of installed HVAC offshore connections Length of installed HVDC offshore connections
EVOLUTION OF INSTALLED OFFSHORE CONNECTIONS
Before 2009 2009-2018
This demand i is associated w with: Installation of more offshore generation Capability of submarine links to withstand higher transit and higher voltages Increase of the average length of each link because generation is distant from the shore (AC and DC)
18 179 75 49 197 140 50 100 150 200 250 Average length of installed HVAC offshore connections Average length of installed HVDC MIND offshore connections Average length of installed HVDC synthetic offshore connections
EVOLUTION OF AVERAGE LENGTH OF INSTALLED OFFSHORE CONNECTIONS
Before 2009 2009-2018
Workshop AGP’21, Thursday 27th of June, 2019
Challenge N°1
the loss of generated energy the associated financial losses the associated claims
the development of long interconnectors in AC and in DC Outcome
Challenge N°2
regardless of the cable manufacturers, for repairing and building Solution
Workshop AGP’21, Thursday 27th of June, 2019
Pre-study & Development tests
ellec ectual al proper erty i y issues es
investigation tests
materials
joints
Cable design - Operation
Need f for r Cigré recommendations and IEC EC s standard
the systems
Schedule
Maintenance
lific icatio ion o
repair stock
repair time
ibilit ility af after er w warran anty y period
Workshop AGP’21, Thursday 27th of June, 2019
Fill the lack of Cigré recommendations on extruded compatible joints qualification (compatibility, design…). For the new projects, TSO should ask for the development and qualification tests on compatible joints early in the Tender. Discussion between TSO to share experience, identify opportunities to ease the development of compatible joints (ENTSO-E)
Workshop AGP’21, Thursday 27th of June, 2019
Compatible joints exist for HVAC underground cables
(One compatible joint has already been developed for HVAC offshore link)
Developing and qualifying compatible joints for AC and DC offshore links ? YES we can ! Capability for manufacturers to address very long link tenders Lower downtime periods and loss of green generation Lower stock of spare parts Outcome of such development
Workshop AGP’21, Thursday 27th of June, 2019
Thank you for your attention Questions - Discussion