Controlled restart of construction works after Circuit Breaker
Engagement with STAS 18 May 2020
after Circuit Breaker Engagement with STAS 18 May 2020 Phased - - PowerPoint PPT Presentation
Controlled restart of construction works after Circuit Breaker Engagement with STAS 18 May 2020 Phased approach in restarting construction works after CB ends Minimise risks of resurgence of infections/clusters on restart, to avoid work
Engagement with STAS 18 May 2020
Phase 3 Phase 2
END OF CB 1 Jun Week 0 NOW 18 May Week -2
Pre-Phase Phase 1
1st group of projects resumes
2
Prepare 1st group of projects for restart Workforce size to increase gradually, with a small % of workforce allowed to work on site immediately after CB COVID-Safe Restart criteria to be in place All other projects resume
Resumption to be assessed based on criticality, time sensitivity and ability to meet Safe Restart criteria Pacing of activities would depend on how the COVID-situation pans out over the next few months
COVID-Safe Worker Accommodation and Transportation COVID-Safe Workforce COVID-Safe Worksite
worksite (preferred, reduces the need for transportation)
same worksite together
workers/health status;
proximity to other workers.
video calls) to conduct site inspections .
SAFE DISTANCING MEASURES ON SITE
3) Ensure Cleanliness of Worksite Premises
worksite.
4) Delivery/Logistics personnel
should stay within the cabin and communicate with workers through digital devices, such as walkie-talkies. If the driver/operator needs to come out of the vehicle/cabin, they must wear a mask and keep a minimum distance of 1m away from workers.
10