Introduction Overview of Project What is a TSL? Application Equipment Strength Tests Cost Comparison Conclusions
U.S.A. Tanzania Brazil Argentina South Africa Namibia Australia Mali
Ergo Ergo Western Ultra Deep Levels TauTona TauTona Savuka Savuka
Mponeng Mponeng
Tau Lekoa Tau Lekoa Great Noligwa Great Noligwa Kopanang Kopanang Moab Khotsong Moab Khotsong
WITWATERSRAND BASIN
Witwatersrand Basin
Mponeng “Look at me”
Shaft commissioned in 1986 Sub-shaft commissioned in 1993 All mining is done on the VCR horizon down to 120 Level
100 200 300 400 500 600 700 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Years
BP 07 - Base BP 07 - Above 109 Level BP 07 - Below 109 to 120 Level BP 07 - Below 120 Level
Above 109 Level Below 109 level to 120 level VCR B120 Project
Ounces ‘000
2.7 Million Oz
85 Tons
Ventersdorp Contact reef
C L r e e f
SS1 SS2 SSV
Main Service/Vent
83 Level -2 253
120 Level -3 372 Shaft bottom -3 461
900m
123 Level
126 Level -3 572
VCR B120 project area
Decline bottom -3 604 m below collar
109 Level -3 037
Four declines 120 to 126/127 126 level 120 level infrastructure 123 level SS1 # SS2 # M p
e n g s
t h e r n l e a s e b
n d a r y
6.65 0.91 Tensile (MPa) 10.75 1.38 Bond Shear (MPa) 5.2 Bond Strength (MPa)
5mm TSL 50mm Gunnite Criteria
29.16 53.50 Total 4.21 11.23 Maintenance Cost 4.41 7.96 Labour Cost 18.57 22.01 Material Cost & Transport 1.97 12.31 Capital Cost
TSL 5mm Gunnite 50 mm Description
185.37 278.00 Total 30.30 75.76 Maintenance 29.75 53.72 Labour 1.26 9.08 Transport 0.00 20.77 Additives 124.07 118.68 Material
TSL 5mm Gunnite 50 mm Description
Total cost outflow s for support sy stem s
0.00 5.00 10.00 15.00 20.00 25.00 2007 2008 2009 2010 2011 2012 Y ears ZAR Millions T
T
SL C
19.56 Difference
NPC10 Gunnite
NPC10 TSL
2.5m
No rock mass deterioration observed to date TSL system is ZAR 19.56 Mill, $ 2.45 Mill less than gunnite system based on a NPC10 Cannot compare support systems on direct cost only