April 26, 2012 Dratyon Mine Hunter Valley, NSW Australia Decay of - - PowerPoint PPT Presentation

april 26 2012 dratyon mine hunter valley nsw australia
SMART_READER_LITE
LIVE PREVIEW

April 26, 2012 Dratyon Mine Hunter Valley, NSW Australia Decay of - - PowerPoint PPT Presentation

AERIAL TOPOGRAPHIC LASER SURVEY SYSTEMS Transforming Surveying in the Australian Coal Industry with Airborne LiDAR April 26, 2012 Dratyon Mine Hunter Valley, NSW Australia Decay of Skills Critical shortage of technical staff Mining


slide-1
SLIDE 1

AERIAL TOPOGRAPHIC LASER SURVEY SYSTEMS

Transforming Surveying in the Australian Coal Industry with Airborne LiDAR

April 26, 2012

slide-2
SLIDE 2

Dratyon Mine – Hunter Valley, NSW Australia

slide-3
SLIDE 3

Decay of Skills

  • Critical shortage of technical staff
  • Mining Engineering roles seen as most

important

  • Movement of best people from support

roles (surveying, geology etc.) to Mining Engineering

  • Resultant lowering of skill levels in all

three areas

slide-4
SLIDE 4

Historical Coal Prices

slide-5
SLIDE 5

Aerial Surveying Services - 2006

  • Variable accuracy – some customers not

satisfied

  • Expensive
  • Inflexible/Unreliable - highly reliant on

weather conditions

  • Slow turn-around
slide-6
SLIDE 6

Key Deliverables

  • Data Accuracy – must be comparable to

current solution

  • Turn-around time – max. survey date +3

days

  • Flexibility/Reliability – fly below cloud
  • Price – lower than current solution
slide-7
SLIDE 7

The Atlass Business

  • First survey - August 2007
  • Guaranteed to get your data within 3 days

after date of survey

  • Data accuracy now well established in the

industry – better than 150mm RMSE

  • Reliable service
  • Pricing allows mines to move to regular

surveys

slide-8
SLIDE 8

Take Home Messages

  • Good results start with Good Planning
  • Understand your customers needs
  • Suppliers must continually adapt to

changes

  • Choose a good partner