AUXI CO RE SOURCE S CANADA I NC.
Se pte mb e r 2017
Campanillas Mine
AUXI CO RE SOURCE S CANADA I NC. Se pte mb e r 2017 - - PowerPoint PPT Presentation
AUXI CO RE SOURCE S CANADA I NC. Se pte mb e r 2017 Campanillas Mine DISCL AIME R The following presentation contains data provided to Auxico Resources Canada Inc. As such, Auxico Resources Canada Inc. has taken all reasonable care in
Se pte mb e r 2017
Campanillas Mine
The following presentation contains data provided to Auxico Resources Canada Inc. As such, Auxico Resources Canada Inc. has taken all reasonable care in reproducing the information herein. Material in this presentation may contain technical or other inaccuracies, omissions, or typographical errors, for which Auxico Resources Canada Inc. assumes no responsibility. Auxico Resources Canada Inc. does not warrant or make any representations regarding the use, validity, accuracy, completeness or reliability of any claims, statements or information in this presentation. Under no circumstances, including, but not limited to, negligence, shall Auxico Resources Canada Inc. be liable for any direct, indirect, special, incidental, consequential, or other damages, including but not limited to, loss of programs, loss of data, loss of use of computer of other systems, or loss of profits, whether or not advised of the possibility of damage, arising from the use, or inability to use, the material in this
before making investment decisions. Forward-Looking Statements This presentation may contain forward-looking statements, including but not limited to comments regarding predictions and projections. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.
DISCL AIME R
he Co mpa ny o wns 100% inte re st in 16 histo ric a l mine s / pro spe c ts in Za mo ra , Me xic o
Co mpa ny pub lic o n the Ca na dia n Se c uritie s E xc ha ng e
hig h ne t-wo rth inve sto rs in priva te pla c e me nts
e b rua ry 2022)
35,810,000 2,475,000 16,600 38,301,600
All c o mmo n sha re s o f Auxic o b e c o me fre e tra ding upo n listing , a s the y a re q ua lifie d b y the Co mpa ny’ s pro spe c tus. I nside rs o f Auxic o o wn / c o ntro l 23% o f the sha re s o utsta nding .
Culia c a n Ma za tla n Za mora Silve r- Gold Prope rty
T r inic a n Mine T rinic a n QV/ Bre c c ia
5-10m wide
Rosa Ma r ia Histor ic Site (pla nt) Rosa Ma r ia Adit Za mor a Mine / L a Ca mic hina He a dfr a me Junta s Mine ? L
L
L a India Mine Ag ua ma s 1 Mine Pe rig ue te Mine
8 g / t Au
Ja r illa s Mine Na za re no Mine Chic o Pic o Ca mpa nilla s Mine L a F r anc a Mine E l T r iunfo Mine
Sc a le
1 km
Propose d Site of Auxic o’s 200 tpd Pla nt
Proje c te d Ve in Syste m
350m wide b re c c ia E xte nsive b re c c ia , ma y b e se ve ra l hundre d me tre s wide
Ag ua ma s 2 Mine Don Ig na c io Mine AGUAMAS GOL D MINE
NE W DISCOVE RY
13.03 g / t Au o ve r 3m 110m mine ra lize d b re c c ia g ra ding 0.40 g / t AU
RE CE NT WORK – JUNE 2017 NE W GOL D DI SCOVE RY AT AGUAMAS
? ?
0.85 g / t Au/ 50m inc luding 13.07 g / t Au/ 3m
he se sa mple s we re ta ke n fro m Ag ua ma s 1 a nd Ag ua ma s 2 a re a s whic h a re a ppro xima te ly 130m a pa rt.
AGUAMAS 1 Sa mple Numbe r ZAM2017- 40 34.05 g / t Au, 97.78 g / t Ag AGUAMAS 2 Sa mple Numbe r ZAM2017- 44 14.87 g / t Au, 192.22 g / t Ag AGUAMAS 2 Sa mple Numbe r ZAM2017- 43 3.75 g / t Au, 87.4g / t Ag
a c h o f the sa mple s to the rig ht re pre se nt 1m c ha nne ls whic h a ve ra g e
13.07 g / t Au ove r a true width of 3m within a 110m
wide g o ld-b e a ring b re c c ia g ra ding 0.40 g / t Au a c ro ss the e ntire width.
Sa mple Numbe r AGU2017- 47 1m of 8.80 g / t Au, 20.31 g / t Ag Sa mple Numbe r AGU2017- 49 1m of 25.25 g / t Au, 53.36 g / t Ag Sa mple Numbe r AGU2017- 48 1m of 5.16 g / t Au, 11.62 g / t Ag
AGUAMAS
histo ric a l mine s a re lo c a te d o n pro mine nt NE tre nding line a me nts
Propose d Site of Auxic o’s Ne w 100 tpd Gra vity Pla nt
Ag ua mas
13.03 g / t Au
HI GH-GRADE SI L VE R ORE F ROM
CAMPANIL L AS
his sa mple wa s ta ke n in the ma in d rift a t Ca mpa nilla s. T he silve r o re is ho ste d within a n inte nse ly silic ifie d b re c c ia a dja c e nt to the ma in Ca mpa nilla s Silve r Ve in whic h is a b o ut 4m-5m wide a t this po int whe re this sa mple wa s se le c te d. Pre vio us sa mpling a t this lo c a tio n yie lde d 1.1 kg / t Ag a nd 2.2 g / t Au.
Assays pe nding fo r this sample .
Silve r Sulphide F ra g me nts Silve r Sulphide F ra g me nts Silve r Sulphide F ra g me nts
Sa mple Numbe r B00169552 Re sults Pe nding
CAMPANIL L AS MINE
I nte nse ly a lte re d, b re c c ia te d, a nd mine ra lize d T he se sa mple s we re ta ke n in a ne wly a c c e sse d pa rt o f Ca mpa nilla s a lo ng a 225m lo ng drift. T he q ua rtz ve in syste m, pre do mina ntly in a NE b e a ring struc ture me a sure s a t le a st 7-8m wide a nd it is c ro ssc ut b y nume ro us NS q ua rtz ve ins. T he inte rse c tio n o f this NE a nd NS struc ture a ppe a rs to b e the c a use o f this wide zo ne , whic h do e sn’ t inc lude the unkno wn width o f the mine ra lize d b re c c ia ho st ro c k
La Camichina & Los Olotes Mines
NE W DISCOVE RIE S JANUARY 2017
T he Ca mpa nilla s Mine I s lo c a te d ~ 7 km to the NE
he Za mo ra Pro pe rty is a n histo ric a l pro duc e r o f silve r a nd g o ld; the re ha s b e e n no e xplo ra tio n o n the Pro pe rty in the pa st
S: Ne w disc ove ry in July, 2017 ha s unc o ve re d a
130m lo ng g o ld struc ture b e twe e n the Ag ua ma s 1 & 2 histo ric mine s. A c ha nne l sa mpling pro g ra m yie lde d 0.40 g / t Au a lo ng a 110m wide g o ld syste m c ha ra c te rize d b y thre e q ua rtz ve ins a nd mine ra lize d b re c c ia , inc luding 13.03 g / t Au ove r 3m
n 2014, Auxic o c o nduc te d a sa mpling pro g ra m o n 5 o f the 16 histo ric mine s/ pro spe c ts
he b e st sa mple yie lde d o ve r 14.4 kg o f silve r a nd 19.5 g o f g o ld pe r to nne a t the Ca mpa nilla s Mine
he ha ng ing wa lls c o nta in la rg e mine ra lize d sto c kwo rk/ b re c c ia syste ms tha t ha ve ne ve r b e e n te ste d o r mine d in the pa st
nfra struc ture a t Za mo ra is e xc e lle nt:
110m inc luding 13.03 g / t Au ove r 3m (sa mple d b y the
a utho r o f the 43-101 T e c hnic a l Re po rt). F
to b e c a rrying g o ld.
a F ra nc a: up to 1.72 kg / t Silve r, 12.96 g / t Go ld (sa mple d b y the a utho r o f the 43-101 T
e c hnic a l Re po rt, NOT
PART OF T HE ZAMORA PROPERT Y)
e c hnic a l Re po rt)
l T riumfo: up to 286 g / t Silve r, 2.54 g / t Go ld (sa mple d b y the a utho r o f the 43-101 T
e c hnic a l Re po rt)
up to 6.6 kg / t Silve r, 44 g / t Go ld o ve r 0.5m up to 3.15 kg / t Silve r, 13.4 g / t Go ld o ve r 1.6m (mine d o ut at the uppe r le ve ls, abo ve -60m, po te ntial at de pth)
a Ca ma c hina: histo ric a l va lue s up to 5.1 kg / t Silve r, 23.5 g / t Go ld (we ig hte d a ve ra g e
T e c hnic al Re po rt, ne w disc o ve ry o f a paralle l quartz ve in), re c e nt disc o ve ry o f a pa ra lle l ve in syste m to
Chic o Pic o
Olo te s & Ca mpa nilla s
a Ca mic hina
L
OT AL US$300,000 $25,000 $75,000 $100,000 US$500,000
$5M (CDN)
e rms to b e de te rmine d
he fo c us wo uld b e to a c c e le ra te the drilling c a mpa ig n a t Za mo ra a lo ng the 8 km lo ng strike le ng th a nd to initia te a b ulk sa mpling pro g ra m
Co mpa ny a nd he lp Auxic o de te rmine true g ra de a t va rio us mine s o n the Za mo ra Pro pe rty
$1,000,000
$ 125,000
$ 250,000
$ 250,000
$ 750,000
x $150/ to nne x 30 da ys x 3 mo nths $1,350,000
$ 275,000
T
$4,000,000 All funds are in U S D
O
ilio n, Dire c to r
O
1. Boa rd me mbe rs ha ve o ve r 100 ye a rs o f e xpe rie nc e in
fina nc ing , a c q uisitio ns, a nd mine ma king ;
2. Re c e nt work o n the pro pe rty ha s ide ntifie d the histo ric
Ag ua ma s Mine . A tre nc hing pro g ra m a nd pro spe c ting ha s
he c ha nne lling re turne d 0.40 g / t Au o ve r a width o f 110m, inc luding 13.03 g / t Au o ve r 3m. 3. An 8 km lo ng NE
e xplo re d in the pa st b ut is ho st to se ve ra l histo ric mine s. At the Za mo ra Mine in the so uth, the a utho r ha s disc o ve re d wha t is b e lie ve d to b e a n e xte nsio n o f the Za mo ra ve in to a ppro xima te ly 1 km in le ng th a nd o pe n in a ll dire c tio ns; a nd a b o ut 7 km to the no rth the a utho r ha s g a ine d a c c e ss to the no rthe a st a dit in the Ca mpa nilla s Mine whe re a ll o f the sa mple s se le c te d a re sho wing e vide nc e o f inte nse a lte ra tio n, b re c c ia tio n, a nd mine ra liza tio n. T he q ua rtz ve in syste m o n the ma in le ve l a t Ca mpa nilla s is a t its wide st po int, a ro und 7-8m.
urthe r de ta ils o n Auxic o , inc luding NI 43-101-c o mplia nt te c hnic a l re po rt, fina nc ia l sta te me nts, ma na g e me nt b io g ra phie s, ma te ria l c o ntra c ts, e tc . c a n b e fo und o n the Co mpa ny’ s we b site : www.a uxic o re so urc e s.c o m.
DAR (www.se da r.c o m)
Pie r r e G authie r Mar k Billings
pie rre @ hitla b .c o m mb @ a uxic o re so urc e s.c o m +1 514 299 0881 +1 514 296 1641
Jo e l Sc o dnic k, B.Sc ., P.G e o .
Sie rra Ge o lo g ic a l Co nsulta nts I nc . jo e lsc o dnic k@ g ma il.c o m +52 (667) 223 7480