Citizen’s Oversight Committee Measure V

Public Works Bidding Methods

Facilities Construction and Planning April 19, 2016

1

slide-2
SLIDE 2

Public Works Bidding Process 1st : Identify the need What is the scope of the project? What is the budget? Who are the necessary team members? i.e. contractors, consultants, inspectors… All aspects of “the need” tailor the bidding process

2

slide-3
SLIDE 3

Commonly Practiced Public Works Bidding Options

California Uniform Construction Cost Accounting Act (CUPCCAA) The Base-Line Lowest Responsive Bidder (Hard Bid) Lease/Lease-Back Design-Bid-Build and Design Build

3

slide-4
SLIDE 4

How to Select Optimum Bidding Process

Identify the need What type of support team do we need?

  • Is it a DSA project?
  • Do we need a specialist,

inspector, special testing, etc.? What is the budget? Certain bidding methods are

  • nly acceptable when pertaining

to specific dollar figures Establish a timeline Some bidding methods are immediate, while others can take months

4

slide-5
SLIDE 5

CUPCCAA Bidding Process

Projects $175,000 and under Contractors and service providers submit applications for preapproval Notify specialty contractors and vendors on CUPCCAA preapproved list so that each may attend a bid walk and submit their bid Quick reference;

  • ften used to remedy

sudden and urgent matters Lowest responsive bidder that is able to meet District requirements is awarded contract

5

Sort by Specialties

slide-6
SLIDE 6

Base-Line Lowest: Hard Bid Bidding Process

Prepare for and advertise months before construction start date Advertise in local paper and alert firms/companies from prequalified list Most competitive bidding system Contractors are subject to a large competitive pool; encourages contractor to submit lowest possible bid Lowest responsive bid is awarded contract Works in District’s advantage to lock in potentially lower rates when contractor is submitting during optimum bidding climate (Winter) If there are alterations to original proposal (Change Order), District pays the difference

6

slide-7
SLIDE 7

Lease/Lease Back

District gets to hand select contractors from preapproved list Contingencies and Allowances instead of Change Orders Guaranteed Max Price District pays the same rate even if unforeseen conditions arise Contractor assumes risk Contractor is allowed to “value engineer” architect’s original design if different materials are more readily available or design features can be altered for more efficiency

7

slide-8
SLIDE 8

Preapproved List for Projects Over 1 Million as Required by California Assembly Bill (AB) 1565

8

slide-9
SLIDE 9

Design Build & Design-Bid-Build

Design Build District designates architect who then selects all subcontractors Minimizes risk to district as design team and subcontractors are responsible for all costs including unforeseen costs Overlapping design and construction phase Can be cheaper and faster, but District is less involved in decision making Design-Bid-Build District selects all project team players District is very involved throughout entire process and will be financially responsible for all work

  • n project

Design comes first, then contractors bid on project District involved in all decision making; the design and outcome are more customized to suit District needs

9

slide-10
SLIDE 10

Who Participates in Competitive Bidding and Their Roles

Contractors Physically build the architects’ plans Architects Design the plans and work closely with entire team and Department of State Architects (DSA) Testing Labs Perform testing on soils, environmental, and structural support Inspectors Monitor and report DSA requirements directly to entire team Specialty Consultants Specialize in specific project genres to offer expertise in support

  • f the District (Solar)

10

slide-11
SLIDE 11

Contract Award Process Issue Request for Proposal (RFP) Paper screen all proposals Formal presentation and interviews Select firm/company for services Present proposal to Board of Education for approval Award contract to selected firm/company

11

slide-12
SLIDE 12

Request for Proposal (RFP)

Issue RFP District Website Notify West Sacramento Chamber of Commerce Plan Wells

  • A contractors’ networking system

Public Advertisement Issue minimum of 2 public advertisements (Sac Bee) Mandatory Pre-Bid Walk District walks the job site to discuss project details required

  • f proposal

Specific instructions are provided so that review of proposal will be precise and efficient Failure to include District requirements presented in RFP and Pre-Bid Walk will result in disqualification

12

Step 1

slide-13
SLIDE 13

Paper Screening

All proposals are subject to paper screening (i.e. following directions) Committee reviews proposals to verify that requirements are met by responsive firm/company All costs, inclusions, and omissions are noted for future questioning Only proposals meeting all requirements, including budget, are invited to present to committee

13

Step 2

slide-14
SLIDE 14

Formal Presentations and Interviews

Firm/company presents proposal Committee has opportunity to address any questions Each committee member rates the proposals with a point system The firm/company with the lowest responsive quote and the highest ranking points is presented to the Board of Education for approval

14

Step 3

slide-15
SLIDE 15

The RFP Process Eliminates favoritism and bias Keeps the market competitive Helps the District select from a large pool of firms/contractors Industry standard to issue RFPs every 3 years for various professional service providers (i.e. architects, and consultants) to compile District Team. This creates the ability to make selections for various projects over the course of subsequent years

15

slide-16
SLIDE 16

Each Method Serves a Purpose

District’s Needs, Budget and Time Frame Architect Contractor Support Team Members

Using a variety

  • f methods

allows the District to find the perfect solution for each project The number one priority of each project is always serving our students. Each method

  • ffers a different manner in which we can better meet the variety of their needs.