City of O’Fallon O’Day Park
Bid Summary and Budget Update December 14, 2017
City of OFallon ODay Park Bid Summary and Budget Update December - - PowerPoint PPT Presentation
City of OFallon ODay Park Bid Summary and Budget Update December 14, 2017 Site Plan Buildings and Structures Amphitheater Activity Center Family Shelter Comfort Station Maintenance Facility Activity Center Family Shelter
Bid Summary and Budget Update December 14, 2017
Amphitheater Activity Center Family Shelter Comfort Station Maintenance Facility
Activity Center Amphitheater Comfort Station Family Shelter Maintenance Facility
2-5 Climber Water Play Cloud 9 Swing Hillside Ball Climbers Bridge Net Climber Rope Parallel Climber VIP Swing Land Bridge Slide
Water Play Water Play Cloud 9 Swing Bridge Net Climber Rope Parallel Climber VIP Swing Land Bridge Slide Hillside Ball Climbers 2-5 Climber
Bidder Total Base with Bonds
KCI $8,272,000 Layne Co. $8,350,701 Demien $8,468,000 Wright $8,683,000 Brinkmann $8,712,554 Hankins $8,913,209 ICS $9,117,147 Kozeny Wagner $9,167,974
$9,328,023 Lamb Co. $9,455,320
Project Advertised: 10/16/17 Bids Received: 11/16/17 Total Number of Bidder: 10
Additional Parking at Activity Center
Alternate: Furnish and install pavement, light poles, foundations, striping, wheel stops, soils, planting, and all incidentals as indicated on Sheets C-120 and C-130, L-610, L-611, L- 612, L-613
Base Bid: Grade site to finish grades indicated on plans and seed area. Install conduit to location of southern parking area light pole for future use as indicated
Plan View
Teen Structure
Alternate: Furnish and install pre-fabricated shelter, footings, concrete retaining wall, concrete pad, concrete walk extending from parking lot perimeter walk to shelter pad, electrical work, soils, plantings, and all incidentals including clearing and grubbing as indicated on Enlargement C/L-400
Base Bid: No clearing or grading work included in base bid. Site grading for parking lot shall tie into existing grading at tree line. Provide conduit for future use per Sheet E-100, stub out conduit to pull box located outside of tree line within limits of disturbance for parking lot construction, no wiring or other electrical work included in base bid. Seed area disturbed for parking lot and conduit construction per landscape plans. Plan View Section Concept Sketch Rendering
Playground Overlook Structure
Alternate: Furnish and install pre-fabricated shelter, footings, concrete retaining wall, concrete pad and pavement, electrical work, and all incidentals as indicated on Sheet L-402. Provide credit for plant material omitted from this area.
Base Bid: Grade site to receive concrete pad for shelter, smoothly blend grading into adjacent landscape area. Install conduit from comfort station electrical panel to location of shelter for future use, stub out to pull box located in landscape area north of proposed pad area as indicated on Sheet E-100, no wiring included in base
sheet L-154. Plan View Section Rendering
Terminus Structure
Alternate: Furnish and install pre-fabricated shelter, footings, concrete retaining wall, concrete pad and pavement, electrical work, and all incidentals as indicated on Sheet L-404. Provide credit for plant material omitted from this area.
Base Bid: Grade site to receive concrete pad for shelter. Install conduit to location of shelter for future use, stub out to pull box located in seeded landscape area adjacent to proposed pad area as indicated on Sheet E-100, no wiring included in base bid. Area shall receive turf seed. Plan View Section Rendering
Playground Water Feature Recirculation System
Alternate: Provide engineered shop drawings with all necessary piping and equipment for a water harvesting and storage system for distribution of captured water for irrigation use. Furnish and install all materials, equipment, storage reservoirs, pumps, piping, controls, and incidentals. Water storage reservoir shall have a capacity of 5,400 cubic feet. Reservoir and equipment location to be located east of walk at terminus of water runnel.
Base Bid: Provide equipment as indicated on drawings for flow thru potable water system. as indicated on Sheets F1.0 and F2.0.
Single Picnic Table Structures
Alternate: Furnish and install pre-fabricated shelter, footings, concrete pad, and all incidentals as indicated on Enlargement B/L-400. Total
each basis. Provide deduct amount to per each price for acceptance of all 9 locations if applicable.
Base Bid: Grade proposed picnic shelter locations as indicated on Sheet C-320, C-330, C-350, C-360. Areas shall receive seeded landscape per adjacent areas shown on L-160 series landscape
Plan View Rendering
Additional Gabion Bench Walls
Alternate: Furnish and install gabion bench terraced walls, additional grading to create terraced areas behind walls, and all incidentals. as indicated on Sheet L-112.
Base Bid: No work in base bid, grade site as indicated on Sheet C-330. Plan View Section
Operable Wall at Activity Center
Alternate: The alternate bid shall contain the cost for material and labor to install an operable partition in the location
the assembly as illustrated and specified in the contract
Reflected Ceiling Plans and specifications 102239 Folding Panel Partitions and 064216 Wood-Veneer Paneling
Base Bid: The steel beam and decorative wood wrap shall be installed as illustrated in the contract documents. All necessary concealed blocking and subframing for the support of the operable partition shall be provided; excluding fasteners, track and all
Sheet A-112 Activity Center Reflected Ceiling Plans Plan View
Special Soil Prep at Native Seed Areas
Alternate: Scrape off and dispose of top 3” of soil from all areas designated to receive native seed that are not being disturbed by grading
that are being disturbed by grading, do not install stockpiled topsoil, instead establish finish grade using subgrade material with 3”
Sheet L-615 for extent of area.
Base Bid: Furnish and install soil per the contract documents. Plan View
Gabion Entry Features
Alternate: Furnish and install 3 additional gabion walls without signage panels, including footings, soils, plantings, irrigation, and all
A/L-400.
Base Bid: Furnish and install one front entry sign wall and signage panels as indicated on Enlargement A/L- 400. Plan View Concept Sketch Sign Section
Alternate: Furnish and install entry feature elements, footings, and all incidentals. as indicated
Base Bid: Base bid as indicated on Sheet L-402. Elevation Concept Sketch
Playground Entry Feature/Poles
Plan View
Empty Conduit from Activity Center to Comfort Station for Future Fiber
Alternate: Provide a 1” empty PVC conduit with pull wire Emptu from the Activity Center to the Comfort Station at the playground for future fiber optic. Conduit to share trenching with lighting conduits and other telecommunications conduits. Pathway to utilize telecommunications handholes already shown on site plan for pulling purposes and to include one additional handhole between the Comfort Station and telecommunications handhole near the C.R.E.C. sectionalizer. 3” RGS sleeves will be required where crossing creeks. 1” RGS conduit will be required where routing beneath roads and parking lots.
Base Bid: Base bid as indicated on Sheet E-100. Plan View
Salt Storage & Associated Hardscape
Alternate: Furnish and install salt storage building, walls, concrete pad, and all incidentals as indicated on Sheet C-110. See architectural sheets A-311, A-321, A-331, A-332, A-340.
Base Bid: Grade site to provide drainage around maintenance area, no change to limits of clearing and grading. as indicated on Sheet C-310. Provide gravel lot within area of building pad and pavement as shown on C-110. Elevations Plan View
Bidder Total Base with Bonds Total Base Bid with Bonds and Recommended Alternates 2-13
KCI $8,272,000 $9,102,000 Layne Co. $8,350,701 $8,981,727 Demien $8,468,000 $9,401,500 Wright $8,683,000 $9,735,000 Brinkmann $8,712,554 $9,421,196 Hankins $8,913,209 $9,570,609 ICS $9,117,147 $10,004,147 Kozeny Wagner $9,167,974 $9,988,974
$9,328,023 $10,460,223 Lamb Co. $9,455,320 $10,425,320
KCI for $9,102,000
O’Day Park Budget Summary Project Overview Total Bid $9,102,000 Construction Contingency (Adjusted) $1,433,344 Waterline Bid Package* $159,750 Total Construction Costs $10,695,094
$11,108 Furniture / Fixtures / Technology / Security / Phone* $219,410 Professional Services $1,702,386 Financing $107,120 Special Construction (Phillips 66/Tree Clearing and Grinding) $82,442 Owner Contingency $482,440 Total Other Costs $2,604,906 GRAND TOTAL $13,300,000
* Remaining Packages to Bid