City of Waukesha
West-Side and Southeast Interceptor Sewer Cost Comparison Analysis
Central States Water Environment Association, May 2012
City of Waukesha West-Side and Southeast Interceptor Sewer Cost - - PowerPoint PPT Presentation
City of Waukesha West-Side and Southeast Interceptor Sewer Cost Comparison Analysis Central States Water Environment Association, May 2012 Agenda Purpose Basis of Analysis Evaluation of Existing Collection System System Flow
Central States Water Environment Association, May 2012
Interceptor Sewer Cost Comparison Analysis Page 2
01/24/2011 Design Engineering Services for Sanitary Interceptor Sewer Page 3
Interceptor Sewer Cost Comparison Analysis Page 4
Interceptor Sewer Cost Comparison Analysis Page 5
▼ Design Flow / Level of Service Determination
▼ Life Cycle Cost Analysis
▼ Pump Station / Force Main Considerations
▼ Interest Rate – 4.6% (per City Rate Consultant) ▼ Risk / Construction Considerations
Interceptor Sewer Cost Comparison Analysis Page 6
▼ June 2009 Event is considered to be a 25-year event ▼ Selected as it stressed the collection system, resulting in
▼ Additional future flows were added for:
▼ Wisconsin DNR has not determined a required level of service for
Interceptor Sewer Cost Comparison Analysis Page 7
▼ 20-, 50- and 60-year periods were mutually accepted. ▼ Differing flow volumes for each period were not considered.
▼ A Present-Worth Analysis Period was selected, which included
▼ Capital costs for construction, maintenance, utility, rehabilitation
▼ Any analysis within 10% of each other was considered to be an
01/24/2011 Design Engineering Services for Sanitary Interceptor Sewer Page 8
Interceptor Sewer Cost Comparison Analysis Page 9
▼ 60-year structural life (building, wet well, valve vault, etc.) ▼ Pumps, controls, electrical, HVAC and other equipment will be
▼ Pumps will be rebuilt on a 7-year cycle within the 20-year
▼ Waukesha has an annual parts budget of approximately $2,000 per
▼ All force mains will have a useful service life equal to that of the
01/24/2011 Design Engineering Services for Sanitary Interceptor Sewer Page 10
Interceptor Sewer Cost Comparison Analysis Page 11
▼ Grade vs. Pipe Slope ▼ Open Cut vs. Trenchless Construction ▼ Groundwater and Subsurface Soil Conditions ▼ Wetlands and Open Waterways ▼ Areas of Historical Significance ▼ Proposed Easements / Property Acquisitions ▼ Pavement Condition Analysis ▼ Risk of Failure
01/24/2011 Design Engineering Services for Sanitary Interceptor Sewer Page 12
▼ Required Improvements:
▼ Collection System Weir:
01/24/2011 Design Engineering Services for Sanitary Interceptor Sewer Page 13
01/24/2011 Design Engineering Services for Sanitary Interceptor Sewer Page 14
Interceptor Sewer Cost Comparison Analysis Page 15
Interceptor Sewer Cost Comparison Analysis Page 16
Interceptor Sewer Cost Comparison Analysis Page 17
Interceptor Sewer Cost Comparison Analysis Page 18
▼ Required Improvements:
▼
01/24/2011 Design Engineering Services for Sanitary Interceptor Sewer Page 19
Interceptor Sewer Cost Comparison Analysis Page 20
▼
▼
▼
01/24/2011 Design Engineering Services for Sanitary Interceptor Sewer Page 21
Interceptor Sewer Cost Comparison Analysis Page 22
▼
▼
▼
▼
▼
Interceptor Sewer Cost Comparison Analysis Page 23
Year Description 2012 Summit Ave PS Upgrade 2012 Bluemound Rd PS and FM upgrade 2012 Hollidale PS and FM upgrade 2012 River Place PS Upgrade 2012 Fox Point PS Upgrade (controls only) 2013 MacArthur Rd PS and FM upgrade 2014 Walmart PS and FM upgrade 2015 Badger Dr PS and FM upgrade 2015 Greenmeadow Interceptor Sewer Design 2016 Fox Point PS Upgrade - Design 2016 Southeast Interceptor (West Avenue to Fox Point) - Design 2016 Milky Way Sewer - Design 2016 Patricia Ln PS upgrade 2016 Greenmeadow Interceptor Sewer Construction 2017 Pebble Valley PS and FM upgrade 2017 Southeast Interceptor (West Avenue to Fox Point) - Construction 2018 Pebble Valley PS and FM upgrade 2018 Milky Way Sewer - Construction 2019 Ruben Dr FM upgrade 2020 Coneview Dr FM upgrade 2021 Springbrook Dr FM upgrade 2022 Summit Ave FM upgrade 2023 Heyer Dr FM upgrade