CREATING A SPA CENTER ON THE BASIS OF THE UNFINISHED CAPITAL STRUCTURE OF OJSC SANATORIUM AND RESORT ORGANIZATION BRESTAGROZDRAVNITSA Seller: OJSC SKO Brestarozdravnitsa Contact phones of the seller: +375162 911134, +375162 911225 (tel / fax)


slide-1
SLIDE 1

CREATING A SPA CENTER ON THE BASIS OF THE UNFINISHED CAPITAL STRUCTURE OF OJSC SANATORIUM AND RESORT ORGANIZATION BRESTAGROZDRAVNITSA

Seller: OJSC SKO Brestarozdravnitsa Contact phones of the seller: +375162 911134, +375162 911225 (tel / fax)

slide-2
SLIDE 2

The building area is 770 square meters; Plot 0.1 ha; Estimated selling price of 50 thousand US dollars; There is a source of mineral water, the composition of which corresponds to the sea; The proximity of border crossings: with Ukraine - 15 km, with Poland - 37 km

slide-3
SLIDE 3

The object is offered for sale with the condition of its further reconstruction in the SPA center to provide paid cosmetic, household and spa services for clients of OJSC SKO Brestagrozdravnitsa, as well as clients

  • f health and tourism organizations

located in the territory of the local resort Beloe Ozero.

Total area: 730 sq. M. m. (total construction area with the foundation of 1311 sq. meters). Land area: approximately 1250 square meters. m

slide-4
SLIDE 4

The object consists of one conserved three- story capital building with a technical floor. The roof of the building is flat, made of floor slabs with a single-layer bituminous- ruberoid coating. The outer walls of the building are brick, made of red (inside) and silicate (outside)

  • bricks. The thickness of the outer walls is 510

mm. Internal partitions are made of red brick. Window and door openings are not filled. Engineering communications inside the building there. The degree of construction readiness of the object is about 30%

slide-5
SLIDE 5

Engineering communications: power supply, heat and water supply and sewage can be connected from the existing engineering networks of OJSC SKO Brestagrozdravnitsa. Maximum distance to connection points no more than 50 meters The distance to Brest is 33 km. To the nearest village settlement. Berestye - 0.2 km, to the nearest border crossing Domachevo – Slovatichi - 15 km