Duvauchelle Wastewater Project Overview of Scheme Options - - PowerPoint PPT Presentation

duvauchelle wastewater project overview of scheme options
SMART_READER_LITE
LIVE PREVIEW

Duvauchelle Wastewater Project Overview of Scheme Options - - PowerPoint PPT Presentation

Duvauchelle Wastewater Project Overview of Scheme Options Presentation to the Ng i T ahu Parties Thursday 20 th S eptember 2018 Consent History Plant commissioned in 1985 Current short term consent granted 31 J anuary 2011


slide-1
SLIDE 1

Duvauchelle Wastewater Project Overview of Scheme Options

Presentation to the Ngāi T ahu Parties Thursday 20th S eptember 2018

slide-2
SLIDE 2
slide-3
SLIDE 3

Consent History

  • Plant commissioned in 1985
  • Current “short term” consent granted 31 J

anuary 2011

  • Expires 28 J

anuary 2023

  • Working Party set up in 2011
  • M et 14 times – now coming towards a solution
  • Consent conditions - milestones
  • Working Party to report on Options by 31 October 2016 (done)
  • Working Party to report on “referred” option by 31 October 2018 (done)
  • Report on proposed implementation program, consenting, construction and
  • peration by 31 October 2020
slide-4
SLIDE 4

Options Considered

  • Continued Harbour Discharge
  • Discharge to Land (reuse)
  • 5 possible land application sites considered
  • Criteria - land slope < 15 degrees
  • Proximity to plant.
  • Site 1 and 3 best options
  • Storage of winter volume required

Land discharge is technically feasible

therefore harbour discharge will be very difficult to consent

slide-5
SLIDE 5
slide-6
SLIDE 6

13/ 12/ 2016 2

slide-7
SLIDE 7

13/ 12/ 2016 4

Control (no irrigation)

440 mm/yr 825 mm/yr 1650 mm/yr

2 4 6 8 10 12 14 D control D 440 D 825 D 1650 A control A 825 Dry matter production (t/ ha/ yr equiv.)

Wastewater accelerates pasture growth

slide-8
SLIDE 8

Native Tree Growth Trial using Duvauchelle Treated Wastewater Lincoln University October 2014 T

  • February 2018
slide-9
SLIDE 9

Golf Club and Show Grounds Irrigable Areas

Drainage Class Operating Regime Drainage Area (ha)

Good All year Good 5.0 Moderate S ummer + shoulder only Moderate 2.5 Poor S ummer only Poor 3.4 T

  • tal assumed irrigable area

10.9

  • Any land > 15 degrees is excluded
slide-10
SLIDE 10

Duvauchelle Wastewater S cheme Options

slide-11
SLIDE 11

Rough Order Capital Cost Estimate

Option Rough Order Capital Cost

Options 1 - 3 $4.0M - $5.0M Option 4 $3.3 - $4.2M

slide-12
SLIDE 12

Option 2 photomontage

slide-13
SLIDE 13

Option 4 Photomontage – Covered Vs Uncovered Pond

slide-14
SLIDE 14

Next Steps

  • Community Information meeting(s)
  • Further develop preferred option(s) and costs
  • Review implications of Akaroa bore injection work for Duvauchelle scheme
  • Report to Council for a decision on preferred option
  • Prepare and lodge consent application
  • Report on proposed implementation timeframe