EMERGING HIGH-GRADE MANGANESE OPPORTUNITY INVESTOR PRESENTATION JUNE 2018 1 F O R W A R D L O O K I N G - S T A T E M E N T S This presentation contains forward-look ing statements and factual information that are current as of the date
INVESTOR PRESENTATION – JUNE 2018
1
2
This presentation contains forward-look ing statements and factual information that are current as of the date the presentation was originally delivered. Wh en used in th is presentation, words such as “may”, “wou ld”, “cou ld”, “will”, “expect”, “anticipate”, “estimate”, “believe”, “contemplate”, “intend”, “budget” “plan” and oth er similar expressions are intended to identify forward-look ing statements. F
statements with respect to the timing and amount of estimated future exploration, success of exploration activ ities, expenditures , permitting, and requirements for additional capital and access to data. F
involv e known and unknown risks, uncertainties, and oth er factors which may cause the actual results, performance or achiev ements of Giyani Metals Corp. (the “C
y”) to be materially different from any future results, performan ce
. Such factors include, among oth ers, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; th e ability to enter into joint v entures or to acqu ire or dispos e of pr
fluctuations in currency markets; operating or technical difficulties in relation to the speculative nature of exploration and development; accidents, employee relations (including labour disputes) and other risks of the gold industry; ability to obtain financing; changes in costs and estimates associated with the Company’s projects; legislative, political or econ
elopments in the jurisdictions in which the Company carries on business; requirements for additional capital; and regulatory restrictions including delays in obtaining gov ernmental approvals . Although the Compan y has attempted to identify important factors that could cause actual results to differ materially from thos e contained in forward-look ing statements, there may be other factors that cause results not to be as anticipated, estimated or
e Compan y disclaims any intention or obligation to update or revise an y forward-looking statements, whether as a result of new information, future events or otherwise except as required by applicable law.
F O R W A R D L O O K I N G - S T A T E M E N T S
COS T HIGH-GRA DE F EEDS TOCK MA NGA NES E F OR THE BA TTERY INDUS TRY
(K.HI LL , OTS E, A ND L OBA TS E ) WITHIN ITS LA RGE LA ND PA CKA GE OF 8, 135 S QUA RE KIL OMETERS , L OCA TED IN THE KA NYE BA S IN, S OUTHEA S TERN B OTS WA NA , A F RICA . THES E PROS PECTS E NCOMPA S S S EV ERA L PA S T PRODUCING MA NGA NES E MINES
OF 2018 OPERA TI ONA L P ROGRA M UNDE RWA Y Q2/ Q3, INC LUDING G ROUND GEOPHYS ICA L S URV EYING A ND A DIA MOND DRILLING CA MPA IGN
COMPLETED A T K.HILL.
THE K.HILL A ND OTS E
TO UPGRA DE THE ORE TO A BA TTERY GRA DE MA NGA NES E
A U N I Q U E O P P O R T U N I T Y
3
SO UTHEASTER N B O TSWAN A
MUL TI P L E P R O JEC TS TO C O LLEC TI VELY FO R M A LAR GE-SC AL E R ESO UR C E
TO TH E TO WN S O F K AN YE, O T SE, AN D LO B AT SE WI T H AC C ES S TO GO O D I N FR ASTR UC TUR E, R AI L AN D R O AD SYSTEMS, WATER AN D EL EC TR I C I TY
TO SHI P O UT O F 5 SEAP O R TS AC C ESSI B L E V I A R AI L N ETWO R K S AN D STR ATE GI C AL L Y L O C ATED FO R C O ST EFFEC TI VE SHI P P I N G TO C HI N A AN D I N DI A
I S O N E O F TH E MO ST AT TR AC TI V E AFR I C AN JUR I SDI C TI O N S SUP P O R TI N G MI N I N G O P ER ATI O N S WI TH FAVO R AB L E TAX R EGUL ATI O N S AN D EFFI C I EN T GO VER N MEN T P R O C ESSES
T H E P R O P E R T Y
KANYE PROJECT MANGANESE PROSPECT
4
M A N G A N E S E R I C H R E G I O N
W I T H I N T H E K A L A H A R I B A S I N
2.3 million tonnes P/A 37% Manganese 2.9 million tonnes P/A 37% Manganese 3.8 million tonnes P/A 37% Manganese 1.8 million tonnes P/A 33% Manganese 2 million tonnes P/A 35% Manganese Privatly owned (unknown production
2.5 million tonnes P/A 40% Manganese
ESTIMATED PRODUCTION AND GRADE LEVELS OF SOUTH AFRICAN KA LAHARIMANGANESE MINES
Source: Public companies annual reports and third party research.
5
G R O W I N G D E M A N D F O R L I T H I U M - I O N B A T T E R I E S
B A T T E R I E S I S G R O W I N G E X P O N E N T I A L L Y A S G L O B A L S A L E S O F E L E C T R I C V E H I C L E S A R E F O R E C A S T E D T O I N C R E A S E F R O M 1 . 1 M I L L I O N I N 2 0 1 7 T O 1 1 M I L L I O N I N 2 0 2 5 A N D T H E N S U R G E T O 3 0 M I L L I O N I N 2 0 3 0 *
2 0 4 0 5 5 % O F A L L N E W C A R S A L E S A N D 3 3 % O F G L O B A L F L E E T W I L L B E E L E C T R I C *
V E H I C L E C O S T W I L L B E C O M E C O M P E T I T I V E W I T H O U T S U B S I D I E S S T A R T I N G I N 2 0 2 4 A N D W I L L R E A C H P A R I T Y W I T H I N T E R N A L C O M B U S T I O N E N G I N E V E H I C L E S B Y 2 0 2 9 *
B A T T E R Y M A N U F A C T U R I N G C A P A C I T Y I S 1 3 1 G W H P E R Y E A R I N 2 0 1 8 J U M P I N G T O 4 0 0 G W H P E R Y E A R B Y 2 0 2 1 B A S E D O N E X I S T I N G A N D U N D E R C O N S T R U C T I O N P L A N T S *
G R O W T H O F E L E C T R I C V E H I C L E S R E Q U I R E S A D R A M A T I C S C A L E - U P I N T H E B A T T E R Y S U P P L Y C H A I N I N C L U D I N G M A N G A N E S E
E N E R G Y S T O R A G E A P P L I C A T I O N S L I K E R E S I D E N T I A L A N D G R I D - S U P P O R T A R E A L S O G R O W I N G A N D D R I V I N G D E M A N D F O R B A T T E R I E S
6
* Source: Bloomberg New Energy Finance 2018
R I S I N G D E M A N D F O R M A N G A N E S E B Y B A T T E R Y M A K E R S
I S R E Q U I R E D I N T W O O F T H E M O S T P R O M I N E N T B A T T E R Y C A T H O D E C H E M I S T R I E S , N I C K E L - M A N G A N E S E - C O B A L T ( N M C ) A N D L I T H I U M - M A N G A N E S E - O X I D E ( L M O )
B A T T E R I E S C O N T A I N 7 0 % L E S S C O B A L T T H A N S O M E C U R R E N T B A T T E R I E S A N D W I L L B E A D O P T E D I N C R E A S I N G L Y D U E T O R I S I N G C O B A L T P R I C E S *
O F T H E N M C B A T T E R Y W I L L D R I V E D O W N T H E C O S T O F B A T T E R Y P A C K S A C C E L E R A T I N G T H E P A C E T O M E E T E V A D O P T I O N L E V E L T A R G E T S
F O R T H E C O M P O N E N T S O F T H E L I T H I U M - I O N B A T T E R I E S W I L L I N C R E A S E F R O M ~ 0 . 7 M I L L I O N M E T R I C T O N S I N 2 0 1 8 T O O V E R 1 0 M I L L I O N M E T R I C T O N S I N 2 0 3 0 *
M A T E R I A L P R I C E S A R E S E T T O R I S E , S P E E D I N G U P T H E A D O P T I O N O F L O W - C O B A L T B A T T E R Y C H E M I S T R I E S *
O N E O F T H E L A R G E S T B A T T E R Y C A T H O D E S U P P L I E R S , A N N O U N C E D A N I N V E S T M E N T P R O G R A M O F € 3 0 0 M I L L I O N B E T W E E N 2 0 1 7 A N D 2 0 1 9 T O I N C R E A S E I T S P R O D U C T I O N O F N M C C A T H O D E M A T E R I A L S
7
* Source: Bloomberg New Energy Finance 2018
K . H I L L A N D O T S E P R O S P E C T S
K.Hill Prospect near the town of Kanye Otse Prospect near the village of Otse
8
▪ MULT IP LE S U RF A CE O UT CR O PS O F UNIQUE HIGH-GRA DE MA NGA NES E ▪ THE MA N GA NES E MIN ED A T K.H IL L 1 957 - 1967 C ONS IS TED , A LM OS T E NTI RE LY, O F HIGH -G RA D E MA NGA NES E OX ID E NODULES ▪ THE GIYA NI GE OL OG ICA L TEA M L OCA TE D MULT IP LE A REA S W HER E THES E NO DU LE S A RE S TILL PRES ENT TODA Y ▪ THE MA NGA NES E ORE D EP OS ITS A T K.HI L L WER E F ORM ED BY O XIDA T IO N A N D S UPE RGE NE E NR IC HME NT RES U LTI NG I N A V ERY S TA B LE F O RM OF MA NGA NES E OXI DE (S O UR CE : B OTS WA NA N OTES A N D RECORDS V OL.30) ▪ CHEM ICA L S TA BI LIT Y OF K.H IL L MA NGA N ES E O RE MA KES I T C OS T EF F ECTIV E TO S TORE, A ND TRA NS PORT
K A N Y E B A S I N M A N G A N E S E
9
▪ 1,500 TO 2,000 METERS OF DIA MOND DRILLING ▪ ES TIMA TED 25 COLLA RS ON A 100 METER S PA CED GRID ▪ MA XIMUM 80 METER DEEP DRILL HOLES ▪ TWO PRIORITY BLOCKS IDENTIF IED A T EA CH OF THE PROS PECTS , K.HILL, A ND OTS E ▪ 2-3 F ENCES OF HOLES PER BLOCK ▪ DENS IT Y OF GR ID RE QUI RE D F O R 3 -D MO DEL LI NG , C ONF IDE NC E IN S TR IKE C ONT IN UITY , DIP OF MIERA LIZ ED BODY, A ND ES TA BLIS HING V A RIA TION IN GRA DE ▪ 3-D GEO L OGI CA L MO DEL , A ND BL O CK RES O U RCE M OD EL T O BE US ED I N CA LC U LA TI NG A RES OURCE ES TIMA TE A T K.HILL ▪ 3-D GE O LO GI CA L MO DE L A N D GE OTE CH NI CA L DA TA TO BE US E D I N PRE LI MINA RY MIN E PLA N DES IGN ▪ META L LU RG ICA L A N D MI NERA L P R OC ES S IN G T O BE US ED T O ES TA BL IS H H IGH LEV E L ECO N OMI C F A CT O RS F O R EXT RA CTI ON , P RO CES S -A BI LITY , A ND P RO DU CTI O N OF A BA TTERY GRA DE PRODUCT ▪ ULT IMA TE GOA L IS T O PR OD U CE A 43 -10 1 CO MP LA I NT REP O RT WIT H A RES OU RC E ES TIMA TE
H I G H L I G H T S O F F I E L D P R O G R A M Q 1 / Q 2 - 2 0 1 8
10
F I E L D P R O G R A M T I M E L I N E
SUMMARY: 2 WE E KS OF SI T E I NSPE CTI ON, SCOPE OF WORK DE F I NI TION, AND CONT RACTOR AGREE MENT 2 WE E KS OF F I E LD PROGRAM DE SI GN, GE OPHYSICS T ARGET DE FI NI TI ON, AND DRI LLI NG PLAN DE VELOPMENT 10 WE E KS OF GE OPHYSI CAL SURVEYI NG AND I NT E RPRET AT ION, DRI LLING, GE OCHEMICAL ANALYSI S 8 WE E KS HYDROME T ALLURGICAL T E STI NG, 3D MODE LI NG, RE SOURCE E ST IMATI ON AND 43- 101 RE PORT 4 WE E KS T O COMME NCE T RI AL MI NI NG AND PROCE SSING PLANT DE SIGN 6 WE E KS T O ST ART E NVI RONMENT AL I MPACT ANALYSI S AND PRE PARE F OR F ULL MI NI NG PE RMI T APPLI CATI ON
Agreements
Scope of Work
01 – 15 March
Design
Target Definition
Development
15 – 31 March
Surveying
Sampling, and Analysis
Interpretation and Analysis
Management Plan
01 April – 15 June
cal Testing
and Resource Estimation
Compliant Report
01 June - 31 July
Mining
Design
Agreement
15 July – 15 August
Impact Analysis
Application
01 Aug – 15 Sep
11
✓ ✓
⏳
METRES COMPLETED AT K.HILL IN 16 DRILL HOLES OUT OF 19 PLANNED
MINERALIZATION INTERSECTED IN MULTIP LE LAYERS
SENT FOR GEOCHEMICAL ANALYSIS
D R I L L I N G A T K . H I L L
AS OF MAY 20, 2018
12
D R I L L C O R E S F R O M K . H I L L
13
250-METER LINE SPACING, WAS FILTERED, IMAGE PROCESSED AND INVERTED
LOCATIONS OF PROSPECTIVE GEOLOGY
IDENTIFIED PROSPECTIVE AREAS FOR MANGANESE
PROVIDE VALUABLE INFORMATION TO IDENTIFY SUBTLE MAGNETIC CONTACTS WHICH WILL ALLOW FOR DETAILED MAPPING OF THE MANGANIFEROUS SHALE
A E R O M A G N E T I C I N T E R P R E T A T I O N
14
R EAL TIME KINEMATIC (R TK) AND GR AVITY S TATIONS AND 128 KILOMETR ES OF MAGNETIC WALK-LINES COMP LETED AT K.HILL
(R TK) AND GR AVITY S TATIONS AND 27 KILOMETR ES OF MAGNETIC WALK-LINES COMP LETED AT OTS E
G R O U N D G E O P H Y S I C S A T K . H I L L & O T S E
15
studies
management plan
estimates
diamond drilling program
and gravity geophysics
R O A D M A P
Q2 2018 Q3 2018 Q4 2018 Q1 2019
assessment
proto-typing
Testing Design Execution Production
16
E S S E N T I A L A T T R I B U T E S O F A S U C C E S S F U L M I N E
GRADE
FOR ALL COMMODITIES, GRADE DRIVES THE THE ECONOMICS IN MINING
SCALE
LARGE RESOURCES RESULT IN LARGE PRODUCTIO N VOLUME AND DRIVES LONG TERM REVENUES AND PROFITS
MANAGEMENT
EXPERIENCED MANAGEMENT TEAM ENSURES FUL L POTENTIAL IS REALIZED
JURISDICTION
MATURE MINING CULTURE, STABLE POLITICAL SYSTEM, GOOD INFRASTRUCTURE, AND FAVOURABLE TAX REGULATIONS AND BUSINESS ENVIRONMENT
METALLURGY
HIGH-GRADE AND LOW-IMPURITIES RESULT IN COST- EFFECTIVE PROCESSING AND BENEFICIATION
SCALE MANAGEMENT JURISDICTION METALLURGY GRADE
G I Y A N I ’ S K A N Y E M A N G A N E S E P R O J E C T H A S A L L O F T H E A T T R I B U T E S O F A S U C C E S S F U L M I N E
17
B O T S W A N A M I N I N G A D V A N T A G E
Botswana Namibia Zambia South Africa Botswana GDP from Mining in Billion BWP
12.5 14.6 11.1 11.7 11.2 13.9
IS ONE OF THE MOST ATTRA CTIVE MINING J URISDICTIONS IN S OUTHERN AF RICA WITH POLITICA L S TA BILITY A ND TRA NS PARENCY
INV ES TMENT ADV A NTA GE COMPA RED TO NEIGHBOURING COUNTRIES WITH A CTIVE BLA CK ECONOMIC EMPOWERMENT (BEE) REGULATIONS
IS DEV ELOPING THE ONLY MA NGA NESE PROJ ECT IN BOTS WANA
A ND S PA RES
TA X EXONERA TION
F IS CA L REGIME, 100% CA PITA L REDEMPTION
Angola Madagascar Zimbabwe DR Congo Mozambique Tanzania 2011 2012 2010 2013 2014 2015
18
I N V E S T M E N T H I G H L I G H T S
THE KA NYE MA NGA NES E PROJ ECT INTO PRODUCTION
THE LEA DIN G S U PP LIE R OF S U PE RI OR F EEDS T O CK MA NGA NES E TA IL O RED T O T HE BA TTERY INDUS TRY
A ND EA S Y TO MINE
TO GET TO PRODUCTION
IN A F A V OURA BLE MINING J URIS DICTION
F O R A P R OJ EC T GEN ERA T IV E MO DE L WI TH MU LT IP LE MA N GA NES E O CC U RRE N CES THROUGHOUT GIYA NI’S PROPERTY
WITH S TEEL A ND META L A LLOY MA KERS A S A S ECONDA RY MA RKET F OR EXCES S PRODUCTION
F OR S HA REHOLDERS
(~$2M) A ND 20% INTERES T IN CA NOE MINING V ENTURES CORP (~$1.8M)*
* A s o f F e b r u a r y . 1 2 . 2 0 1 8
19
M A N A G E M E N T
R O B I N B I R C H A L L
eighteen years of exp erience in the financing and ma nagement
resource companies, most recently as the Executi ve Chairma n of Silver Bear Resourc es and CE O
a private E &P compa ny as well as V.P. Investmen t and Corporate Banking with BMO Capita l Marke ts. Mr. Birchall earned an MBA from the University of Cape Town, a Msc in European and I nternational Politics from Edinb urgh Uni versity, a Première Degré en Langues Literature e t Civi lisation, from Stendahl U niversité and a BA from Queens University. W A J D B O U B O U
executive with a 26-year his tory of achievements in the Oil & Gas and Telecommunica tions i ndustries. Skil led in Operations Managemen t, People and Fi nancial Managemen t, Complex Contract Negotia tions, and Business
leadership positions i n mul tina tional conglomerates, incl uding Schlumberger and Cisco Systems. He holds a bac helor’s degree in Electrical Engineering and MBA from the University of Strathclyde in the UK. D A N C R A N D A L L
is a Senior Manager at Marrelli SupportServices
10 years
experience working wi th public
Chief Fina ncial Officer, accoun ting, regulatory compliance, and management advisory services to numerous issuers
TSX, TSX- Venture, CSE and other in ternational
an Honours Bachelor of Accoun ting (Co-op)degree fromBrock Uni versity . Previously, he was a Ma nager at Collins Barrow Toronto LLP, a public accounting firm where he worked for
C E O
E C T O R P R E S I D E N T C F O
20
M I C H A E L J O N E S
Engineer who held various mi ne management roles for 13 years working a t Gencor, De Beers, Debswana a nd as Consul ting Mi ning Engineer for Iscor. D I R E C T O R
E U G E N E L E E Mr. Lee is a min ing fina nce professi
with experience in capital markets, financia l reporting, risk ma nagement, internal con trols and corporate governance.
and global thought leader on energy and sustainability issues. He currently serves as Executive VP of ePower Engine Systems. J O H N P E T E R S E N
global thoug ht leader on energy and sustainabili ty issues. He c urrently serves as Executi ve VP of ePower Engi ne Systems. S C O T T B R E A R D Mr. Breard is a mar keting professi
wi th significa nt experience in start-ups and
has consul ted for many Fortune 500 companies. D I R E C T O R D I R E C T O R D I R E C T O R D U A N E P A R N H A M C H A I R M A N
track-record
developing companies from start-up to ful ly permitted projects. Mr. Parnham delivers maximum s hareholder value through extensi ve experience in corporate governance, stakeholder relations and capital markets.
21
S H A R E S T R U C T U R E
TSXV:WDG $21.26 million Symbol Share Price* Basic Shares W arrants Options FD Shares Market Capitalization $0.26 81,779,628 5,531,541 4,900,000 92,211,169
*share price as of June 05, 2018
22
T S X V : W D G
Giyani Metals Corp.
277 Lakeshore Road East Suite 403 Oakville, Ontario, Canada L6J 6J3 289- 837-0066 info@giyanimetals.com
G E R M A N Y : A 2 D U U 8
Giyani is a publicly trading, vertica lly integrated, well managed junior resource company focused on build ing a superior hybrid mining company to supply raw materials needed for the fast growing global battery technology industry. www.giyanimetals.com
23
24
W H Y M A N G A N E S E
C O R P O R A T E A D V I S O R T E C H N I C A L A D V I S O R P O L I T I C A L A D V I S O RM A R C H 2 0 1 8 , G L O B A L M A N G A N E S E O R E D E M A N D W A S H I G H E R T H A N G L O B A L S U P P L Y B Y 1 3 2 , 0 0 0 N E T M E T R I C T O N N E M N U N I T S A S O U T P U T F R O M T H E L A R G E S T S U P P L Y I N G R E G I O N , A F R I C A & T H E M I D D L E E A S T , C O N T R A C T E D B Y 5 % M . O . M M A I N L Y D U E T O D R O P I N P R O D U C T I O N F R O M S O U T H A F R I C A , G A B O N , A N D I V O R Y C O A S T
3 2 % M . O . M I N C R E A S E I N D E M A N D F R O M T H E A S I A & O C E A N I A R E G I O N R E S U L T E D I N A 7 7 5 , 0 0 0 N E T M E T R I C T O N N E M N U N I T S D E F I C I T D E S P I T E A 2 2 % M . O . M I N C R E A S E I N O U T P U T 25
6
B A T T E R Y C H E M I S T R I E S
THER E AR E VAR I O US B ATTER Y C ATHO DE C HEMI STR I E S THAT USE DI FFER EN T METAL S. N MC I S P R O VI N G TO B E THE MO ST WELL R O UN DED C ATHO DE C HEMI STR Y B AL AN C E D P ER FO R M AN C E ( EN ER G Y D EN SI T Y, TH ER MAL S TA B I L I T Y, C H AR G E R AT E, B A T T ER Y L I FE, R EP L AC EMEN T C O ST) GI YAN I I S FO C USED O N DEVELO P I N G HI GH-GR AD E MAN GAN ESE SUP P L I ES.
LCO LMO LFP NMC NCA LTO
Lithium Cobalt Oxide
LiMn2O4 LiCoO2
Lithium Nickel Cobalt Aluminum Oxide Lithium Nickel Manganese Cobalt Oxide Lithium Iron Phosphate Lithium ManganeseOxide Lithium Titanate
LiNiMnCoO2 LiFePO4 LiNiCoAlO2 Li4Ti5O12
26
M A N G A N E S E B A T T E R Y C H E M I S T R I E S
Lithium Manganese Oxide LiMn2O4 (LMO) Lithium Nickel Manganese Cobalt Oxide (NMC) NMC METAL COMPOSITION
61% 1% 4% 33% MANGANESE COBALT NICKEL LITHIUM OTHER
LMO METAL COMPOSITION
19% 20% 20% 7% 33% MANGANESE COBALT NICKEL LITHIUM OTHER
27
B A T T E R Y C O S T S T R U C T U R E
GI YA NI ’ S ST RA T EG Y I S TO B E IN TH E S W EE T SP O T O F B ECO MI NG TH E LE AD I NG F E ED ST OCK M ANG AN E S E SU PPL I ER T O TH E M AK ER S O F TH E H IGH EST COST ITEM IN A LITH IUM -ION BATTERY, TH E CATH OD E. 28
SOURCE: KEMETCO RESEARCH
29
D E M A N D F O R M E T A L S
( W O R L D B A N K E N E R G Y A N D E X T R A C T I V E )
207% 1060% 174% 383% 139% 210% 169% 135% 215% 214% 1060% 1060% 215% 136% 65% 3% 61% 42% 59% 66% 61% 59% 56% 69% 3% 3% 61% 56%
0% 200% 400% 600% 800% 1000% 1200% Aluminium Cobalt Copper Lead Nickel Silver Steel Zinc Chromium Indium Lithium Manganese Molybdenum Neodymium Base Metals Rare Earth Metals
Total Demand
Metals Through 2050 (as percentage change from 6 Degree Scenario)
2 Degree 4 Degree Source: WB Analysis Note: Values are derived from mean value
‘metal per MW’ demand
30
31
K . H I L L G E O L O G I C A L M O D E L
32
33
H I G H G R A D E M I N E R A L I Z E D S H A L E G R A D I N G U P T O 7 3 % M N O A L O N G 5 0 0 M E T E R S S T R I K E L E N G T H W I T H I N A 1 0 - M E T E R - T H I C K , 1 K M X 1 K M E N V E L O P E
34
35
O T S E A S S A Y R E S U L T S
H I G H G R A D E M A N G A N E S E , U P T O 6 7 . 4 % M N O A T T H E O T S E P R O S P E C T , 4 0 K M E A S T O F T H E K . H I L L P R O S P E C T
0-900MM 0-900MM +900MM 0-250MM 75-250MM <0.5-75M M 6-75MM 0.5-6MM <0.5MM <0.5MM
RUN OF MINE FEED
LUMPY PRODUCT STOCKPILES FINES PRODUCT STOCKPILE FINES DISCARD MOBILE ROCK BREAKER SECONDARY SCREENING PRIMARY CRUSHING SCREENING FINES DISCARD HANDLING PLANT SERVICES MAKE UP WATER RESERVOIR
S I M P L E , E C O N O M I C A N D F A S T P R O C E S S I N G
36