SLIDE 1 Great Slave Lake Project
- Outpost Island Mine site
- Blanchet Island Mine site
- Copper Pass Mine Site
MV2014X0002
SLIDE 2 GSL Project – Site Proximity GSL Project – Site Proximity
129km
Yellowknife
113km 93km 113km
SLIDE 3 Site Background Site Background
Outpost
- copper gold and tungsten (1935 1952)
- copper, gold and tungsten (1935-1952)
- West Island – primary mining activities
- East Island – minimal activities
Blanchet
- cobalt and nickel showing in 1968
- cobalt and nickel showing in 1968
- open-cut and adit developed in 1969
- small scale mining until 1970
Copper Pass
- nickel mine with original claims staked by
g y Cominco in 1940
- Copper Pass Mines Ltd in 1969
SLIDE 4
Outpost - Site Maps Outpost Site Maps
SLIDE 5
Outpost Areas of Concern Outpost Areas of Concern
129 113 93 113
SLIDE 6
Outpost - Areas of Concern Outpost - Areas of Concern
129 93
SLIDE 7
Outpost - mine openings Outpost mine openings
SLIDE 8
Outpost tailings/waste rock Outpost – tailings/waste rock
North Bay
SLIDE 9
Outpost Tailings/Waste Rock Outpost Tailings/Waste Rock
Decision Process (risk based) ( )
. Draft HHERA and RAP finalized through g FCSAP expert support . Risk assessment indicates low risk with the existing deposit; sediments are locally impacted . Technical options considered existing risk vs removal vs managing in place
SLIDE 10 Outpost Tailings/Waste Rock Outpost Tailings/Waste Rock
Preferred Option Selection p
- Technical options tabled at RAP Options
p p Workout:
- 1. base case (do nothing/leave as is)
( g )
- 2. consolidate and re-slope and
- 3. Consolidate, re-slope and cover
, p
- Coming out of RAP workout, 2 “acceptable
- ptions” (1 and 2)
p ( )
- July site tour – further examination
SLIDE 11
Outpost Tailings/Waste Rock Outpost Tailings/Waste Rock
RAP Finalization RAP Finalization
Site tour feedback from communities . Site tour feedback from communities (concerned with North Bay, consolidate exposed tailings and stabilize the slope is exposed tailings and stabilize the slope is best option) . Elders requested engineered assessment of q g breakwall at lip or North Bay (TM issued) . DKFN technical review suggested additional gg effort on cover (re-veg)
SLIDE 12 Outpost Tailings/Waste Rock Outpost Tailings/Waste Rock
- Preferred option “consolidate and re-slope”
Preferred option consolidate and re slope is deemed effective mitigation
- > removes exposed tailings from wave
p g action in bay
- > stabilizes the tailings/waste rock mix
g (3:1 slope, 300mm cover, above water line)
- > ECS measures will protect cover
CS easu es p otect co e
- > preferred option = “natural cover”
- > bio-engineering test plots (community-
> bio engineering test plots (community based
SLIDE 13 O tpost Tailings/Waste Rock Outpost Tailings/Waste Rock
RAP considered Option 3 (consolidate) RAP considered Option 3 (consolidate)
- > no site source to cover liner
- > no site source to cover liner
- > Blanchet source not suitable (cobble)
> blasting and processing would be required
- > blasting and processing would be required
- > costs would exceed benefit achieved
SLIDE 14 Outpost Tailings/Waste Rock Outpost Tailings/Waste Rock
LUP vs LUP and WL LUP vs LUP and WL
additional admin effort (no concern) . additional admin effort (no concern) . no formal WL close-out process (concern) > monitoring effort (and cost) beyond our
- > monitoring effort (and cost) beyond our
short (5 yr) and long (TBD) monitoring plan > impacts beyond GSL Project (NCSP)
- > impacts beyond GSL Project (NCSP)
- Q. Can we tie Monitoring to LUP ?
Q C ti M it i Pl t it t
- Q. Can we tie Monitoring Plan to commitment
letter under NWTWA ?
SLIDE 15
Outpost Tailings/Waste Rock g
SLIDE 16 l+I
Indian and Northern Affairs Canada Affaires indiennes et du Nord Canada
SLIDE 17
Blanchet Island Site Map Blanchet Island – Site Map
SLIDE 18 Blanchet ore – Beach Area Blanchet ore Beach Area
Before - Summer 2010 Summer 2010 After - Fall 2010
SLIDE 19
Blanchet mine openings Blanchet mine openings
Adit Rail terminus
SLIDE 20
Blanchet ore – Mine Area Blanchet ore Mine Area
Spilled Ore
SLIDE 21
Copper Pass – Site Map Copper Pass Site Map
SLIDE 22
Copper Pass - Site Map Copper Pass Site Map
SLIDE 23
Copper Pass – Site Map Copper Pass Site Map
SLIDE 24 Site Aspects Site Aspects
Mine Component Outpost Blanchet Copper Pass Mi O i /
4 (2 shafts 2
129
Mine Openings/ Surface Trenches
4 (2 shafts, 2 raises) 1 (adit) 6 (trenches)
Buildings
2 6 7
113
Non-Hazardous Refuse
130m3 75m3 16m3
Hazardous Waste Materials
0.5m3 minimal 3,070L
93 113
Mixed Tailings/ Waste Rock
9,000m3
TBD
TBD
Ore
TBD 25m3 120m3
Waste Rock
400m3 1,000m3 4,800m3
Metal Impacted Soil
TBD 2,200m3 5,000m3
PHC Impacted Soil
23m3 50m3 71m3
Surface Water and Sediments
TBD TBD TBD
SLIDE 25 Outpost Mine – Remedial Options Evaluation
Fort Resolution Fort Resolution June 13-14, 2013
Mine Component Option 1 Option 2 Option 3 Option 4 Option 5 Mine Openings Leave as is Retrofit Caps and Raise Fill in Upgrade Existing Concrete Caps and Seal Main Raise “HYBRID” > Concrete Cap in Caps and Seal Main Raise
Shaft #1
and Shaft #2 Buildings Leave as is Demolish and Burn Non-Hazardous Refuse Leave as is Consolidate and Transport Off-Site Consolidate and Place in On-Site Landfill Hazardous Waste Materials Leave as is Consolidate and Transport Off-Site Mixed Tailings/Waste Rock Leave as is Consolidate and Re-Slope Consolidate, Re-Slope and Cover Waste Rock Leave as is Deposit in Surface Excavations “HYBRID”
if d d
Metal Impacted Soil Leave as is Consolidate and Transport Off-Site Capping PHC Impacted Soil Leave as is Off-Site Disposal On-Site Disposal On-Site Treatment Surface Water and Sediments Leave as is Long-Term Monitoring
SLIDE 26 Blanchet Mine – Remedial Options Evaluation p
Fort Resolution June 13-14, 2013
Mine Component Option 1 Option 2 Option 3 Option 4 Option 5 Adit Leave as is Backfill w borrow Backfill w waste rock Foam Plug Building Structures Leave as is Demolish and Burn R f L i C lid t d C lid t d Refuse Leave as is Consolidate and transfer off-site Consolidate and place in on-site landfill Waste Rock Leave as is Re-slope Re-slope and cover Ore Concentrate Leave as is Consolidate and
Consolidate and
Metal Impacted Soil Leave as is Cap w granular material Excavate and place under low permeability cover permeability cover PHC Impacted Soil Leave as is Off-site disposal On-site disposal On-site treatment Surface Water and Sediments Leave as is Long term monitoring
SLIDE 27 Copper Pass Mine – Remedial Options Evaluation
F t R l ti Fort Resolution June 13-14, 2013
Mine Component Option 1 Option 2 Option 3 Option 4 Option 5
Surface Leave as is Fencing and/or Berms Backfilling Trenches g g (and treat water) Ore Leave as is Grading and Covering Consolidation in Trenches and Capping Waste Rock Leave as is Grading Consolidation in Waste Rock Leave as is Grading Consolidation in Trenches and Capping Metal Impacted Soils Leave as is Consolidation in Trenches and Capping PHC Impacted Leave as is Off-Site Disposal On-Site Disposal On-Site Soils Treatment Structures Leave as is Demolish and Burn Non-Hazardous Materials Leave as is Consolidate and Manage Off-Site Consolidate and Dispose in an On-Site “HYBRID”
- > drums/steel
- > drums/steel off-site
- > clean wood burned
Landfill
wood
SLIDE 28 GSL Project Stakeholders GSL Project Stakeholders
Outpost Blanchet Copper Pass
129
Pass AKDFN Lutsel K’e
Deninu K’ue
113
Yellowknives
SLIDE 29
GSL Project Bundle GSL Project Bundle
Outpost Blanchet = NCS Class 1 Outpost, Blanchet = NCS Class 1 Copper Pass = NCS Class 2 bundling 3 sites together: g g = cost efficiency = facilitates FCSAP funding = facilitates FCSAP funding
SLIDE 30 GSL Procurement Strategy GSL Procurement Strategy
- Tender project bundle together
Tender project bundle together
- Bidders’ Tour (Sept 17-18th)
P t Wi t 2013
- Post - Winter 2013
- Award – Spring 2014
SLIDE 31 Outpost mooring Outpost mooring
Aircraft
West Island
Barges Aircraft
West Island
g
SLIDE 32 Blanchet mooring
Blanchet mooring
Blanchet mooring
Blanchet mooring
Contaminated ore Contaminated ore landing
SLIDE 33
Copper Pass – Site Access
SLIDE 34 GSL Work Completed to Date GSL Work Completed to Date
- Stakeholder ID/ Engagement Plan
- Public meetings / Executive updates
- FCSAP expert support (HHERA/RAPs)
- TK Study (mapping exercise, recon,survey)
- RAP Options Workout
- Mine Hazard signage
- Supplemental sampling (seds, WQ)
pp p g ( )
- Archaeological dbase access (PWNHC)
- Blanchet borrow source investigation
g
- Archaelogical survey - underway
SLIDE 35 Community Engagement
SLIDE 36
Signs and Elders/Board Tour Signs and Elders/Board Tour
SLIDE 37
Blanchet Borrow Source Blanchet Borrow Source Investigation
SLIDE 38 GSL Permitting GSL Permitting
- Same group of stakeholders
Same group of stakeholders
- Sites are co-located geographically
Si il it h d d di l
- Similar site hazards and remedial
- ptions
- Sites are being tendered as bundle
- > requesting one LUP and WL for 3 sites